ML20211Q234
| ML20211Q234 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 10/14/1997 |
| From: | Jaudon J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Richard Anderson FLORIDA POWER CORP. |
| Shared Package | |
| ML20211Q238 | List: |
| References | |
| 50-302-97-15, NUDOCS 9710220213 | |
| Download: ML20211Q234 (4) | |
See also: IR 05000302/1997015
Text
_ _ _ _ _ _ _ _ _ _ _ _ .
_. a
'
SAFEGUARDS INFORMATION
OC'IOBER -14, - 1997
Florida Power Corporation
. Crystal River Energy Complex
Mr. Roy A. Anderson _(SA2A)
Sr. VP. Nuclear Operations
sgtGUARDs INFORMGON REugyt0
. ATTN:
Mgr.. Nuclear Licensing-
15760 West Power Line Street
Crystal River. FL= 34428-6708
i
SUBJECT:
NRC INSPECTION REPORT NO. 50-302/97-15
AND NOTICE 0F VIOLATION
Dear Mr. Anderson:
This- refers to the inspection conducted on September ?2-26,1997, at the
Crystal River Unit-3 facility,
The purpose of the visit was to determine
whether activities authorized by the license were conducted safely and in
accordance with NRC recuirements. - At the conclusion of the inspection, the
findings were discussec with those members.of your staff identified in the
enclosed report.
The areas examined during the inspection are iden'.'fied ie the report.
Within-
these areas, the inspection consisted of selecteo examinathas of procedures
and representative records, interviews with personnel, and 3bservation of
activities in progress.
Based on the results of this inspection, the'NRC has determined that a
violation of NRC requirements occurred. This violation.is. cited in the-
enclosed Notice of Violation (Notice), and the circumstances surrounding it-
Jare described in detail in the subject inspection report. Additionally. a'
-
weakness was noted in that to terminate an individual's authorized access to
the plant required input-to numerous computer systems, therefore, increasing
the probability of error.
Please address this weakness in your response to
the Notice of Violation.
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response.
The NRC will
,
use-your response, in part, to determine whether furtner enforcement action is
1
necessary to ensure compliance with regulatory requirements,
f
I
@.D
,
-9710220213 971014
llll
DR
ADOCK 050003 2
SAFEGUARDS INFORMATION
_
,,,
- v
n. - .o *
cntr.ure(s)thisdocumentb&T~ '
_
%
0
.
SAFEGUARDS INFORMATION
(
2
The material enclosed herewith contains Safeguards Information as defined by
l
10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited
by Secticn 147 of the Atomic Energy Act of 1954. as amended.
Therefore, the
material will not be placed on the Public Document Room.
Sincerely.
ORIGINAL SIGNED BY
JCHNS JAUDON
Johns P. Jaudon. Director
Division of Reactor Safety
Docket No. 50-302
License No. DPP.-72
Enclosures:
1.
2.
NRC Inspection Report
(Safeguards Information>
cc w/encls:
John P. Cowan. Vice President
Nuclear Production (NA2E)
Florida Power Corporation
Crystal River Fnergy Complex
15760 West Power Line Street
Crystal River FL 34428-6708
B. J. Hickle. Director
Nuclear Plant Operations (NA2C)
Florida Power Corporation
Crystal River Energy Complex
15760 West Power Line Street
Crystal River. FL 34428-6708
cc w/ Executive Summary:
Robert E. Grazio. Director
Nuclear Regulatory Affairs (SA2A)
Florida Power Corporation
Crystal River Energy Complex
15760 West Power Line Street
Crystal River. FL 34428-6708
James S. 8aumstark. Director
Quality Programs (SA2C)
Florida Power Corporation
Crystal River Energy Complex
15760 West Power Line Street
Crystal River. FL 34428-6708
(cc w/ Executive Summary cont'd - See page 3)
oocum.einernmrorwoe
contam sortstve urcleastnod
intornwJun. Whenseparated frorn
SAFEGUARDS INFORMATION
.-=m - - *
. _
g
--
._
_ . . __
.-
-
. _ _ . _ . . - - . _ _ - - . - -
c
,
.-
SAFEGUARDS INFORMATION
i FPC'
3:
_
(cc w/ Executive-Summary cont'd)
'
R. Alexander Glenn:
" -
Corporate Counsel
' Florida ~Fower Corporation
- MAC.--ASA.
.
P.1 0. Box'14042
.
St. Petersburg. FL 33733-4042
i:
Attorney General-
..-
Department of Legal Affairs
The" Capitol
4
Tallahassee, FL 32304.
- Bill Passetti
-
,
.0ffice of Radiation Control
De]artment of Health and
Rehabilitative Services
1317 Winewood Boulevard
Tallahassee..FL -32399-0700
Joe Myers. Director
Division of Emergency Preparedness
4
-
!
Department of- Community Affairs
i
2740 Centerview Drive
- Tallahassee. FL 32399-2100'
t
L
' Chairman
-- Board of County _ Comraissioners
- Citrus County
- 110 N. Apopka Avenue
Inverness. FL- 34450-4245
Robert B.-Borsum.
- .
Framatome' Technologies
1700:Rockville Pike. Suite 525
- Rockville. MD' 20852-1631
Distribution w/ Executive Summary:
- K. Landis. RII
L. Raghavan. NRR
- R. Schin. RII
- P. Steiner.-RII-
- Document Control Desk (RIDS IE04). 016
' (Distribution w/ Executive Summary cont'd - See nace 4)
www mawde
SAFEGUARDS lNFORMATION nimoeMghMb
.
-
.
_
"
SAFEGUARDS INFORMATION
FPC'
4
]
(Distribution w/ Executive Sumary cont'd)
NRC Resident inspector
U.S. Nuclear Regulatory Com.
6745 N. Tallahassee Road
Crystal. River, FL 34428-
Distribution w/ encl:
NRR/DRIS/SB-
l'
l
errre
amms
on.w. n-
/
on.,sw
~
StGMATURt
na
unis
ai
-t;',
s1
nd li v
no i G i v
sa i /Di v
no ,
iv
, , ,
in
,a i
i ,,
wt
y, wn
/ vt's3 - no
(vts
e
vts ( e ')
its
m
vts
,.o
vts
e
ynav
w,
-
v
.
-
__
SAFEGUARDS INFORMATION
cornanssens.anesensame.s
- . s.,,,s
- . m .
a as
m e