Text
October 31, 2019
SUBJECT:
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2SECURITY BASELINE INSPECTION REPORT 05000266/2019411 AND 05000301/2019411
Dear Mr. Craven:
On October 11, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Point Beach Nuclear Plant, Units 1 and 2. On October 17, 2019, the NRC inspector discussed the results of this inspection with Mr. Mark Fencl and other members of your staff.
The results of this inspection are documented in the enclosed report.
The NRC inspector did not identify any finding or violation of more-than-minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.
If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under Title 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety
Docket Nos. 05000266 and 05000301 License Nos. DPR-24 and DPR-27
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000266 and 05000301
License Numbers:
Report Numbers:
05000266/2019411 and 05000301/2019411
Enterprise Identifier: I-2019-411-0028
Licensee:
NextEra Energy Point Beach, LLC
Facility:
Point Beach Nuclear Plant, Units 1 and 2
Location:
Two Rivers, WI 54241
Inspection Dates:
October 7, 2019, to October 11, 2019
Inspector:
M. Ziolkowski, Senior Physical Security Inspector
Approved By:
Steven K. Orth, Chief
Plant Support Branch
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Point Beach Nuclear Plant, Units 1 and 2 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more-than-minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SECURITY
71130.06 - Protection of Safeguards Information
The inspector evaluated the Safeguards Information Protection Program. The following elements were evaluated from this IP:
Protection of Safeguards Information (1 Sample)
(1)
- Tier I: All Requirements
- Tier II: 02.04 (a-b), 02.05 (a), 02.06, 02.07 (c)
- Tier III: 02.08, 02.09 (a-b)
71130.07 - Security Training
The inspector evaluated the Nuclear Security Training Program. The following elements were
===evaluated from this IP.
Security Training===
(1)
- Tier I: All Requirements
- Tier II: 02.05 (a-d), 02.06 (a-b), 02.07 (a)
- Tier III: 02.10, 02.12 (a-b), 02.13 (a-b)
===71151 - Performance Indicator Verification
The inspector verified licensee Performance Indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)
=
(1)10/01/2018 - 09/30/2019
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspector verified no proprietary information was retained or documented in this report.
- On October 17, 2019, the inspector presented the security baseline inspection results to Mr. Mark Fencl and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
Safeguards Information Program
Miscellaneous
National Rifle Association Rifle Night Qualification
Endorsement
07/19/2019
National Rifle Association Rifle Day Qualification
Endorsement
10/18/2018
National Rifle Association Thermal Rifle Qualification
Endorsement
07/19/2019
Point Beach Physical Fitness Test
05/01/2013
CS-40
G4S Physicians Report of Medical Examination
Tactical Weapons Qualification
Procedures
CS-933
Initial Armed Responder 40hr OJT
CT-04
Conduct Personnel Searches OJT/TPE
CT-14
Conduct Area Searches OJT/TPE
CT-16
Determine the Amount of Force Required to Prevent an
Unauthorized Act OJT/TPE
CT-20
Respond to Contingency Events and Execute Defensive
Strategy OJT/TPE
CT-23
React to Bomb, Hostages and Civil Disturbances Situations
OJT/TPE
PBSAP 1.15
Return to Work
STIP 220
Medical and Physical Fitness Requirements
Security Training
New Hire Training and Qualification
Graded Approach to Security Training
71151
Self-Assessments PI-AA-101-1001-
F01
Nuclear Fleet Security Baseline Inspection Matrix; NRC
Inspection Procedure: 71151, Performance Indicator
Verification
07/15/2019