IR 05000298/1987032

From kanterella
Jump to navigation Jump to search
Partially Withheld Insp Rept 50-298/87-32 on 871101-30 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected: Security
ML20149E717
Person / Time
Site: Cooper Entergy icon.png
Issue date: 12/18/1987
From: Bennett W, Madsen G, Plettner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20149E702 List:
References
50-298-87-32, NUDOCS 8801130448
Download: ML20149E717 (2)


Text

.

APPENDIX U.S. NUCLEAR REGULATORY COMMISSION REGION IV  ;

NRC Inspection Report: 50-298/87-32 Operating License: DPR-46 r

Docket: 50-298 License: Nebraska Public Power District (NPPD) ,

P.O. Box 499 i Columbus, NE 68601 i Facility Name: Cooper Nuclear Station (CNS)

Inspection At: Cooper Nuclear Station, Nemaha County, Nebraska Inspection Conducted: November 1-30, 1987 f Inspectors: M /z//7//7 :

E. A. Plettner, Resident Inspector, (RI) Date

'

l

.

W/E Islt?l??

'

'

W. R. Bennett, Senior Resident Inspector, (SRI) Date [

,

Approved: n / ))h G. L. Madsen, Actihg Chief) Project Section C ift $'{11 Date Division of Reactor Projects

!

.

.

ENCLOSURE CONTAINS .

UPOtt SEPARATION THIS

.r b "i ~Roi.t E ENCLOSURE 8801130448 8 0111 PDR ADOCK O 28 SAFEGUARDS INFORMA i G P '

UPON SEPARATION Ilfl3 PAGE IS DECONTROLLEG,y r

d

, , _ .

'

.

Inspection Summary pspection Conducted November 1-30, 1987 (Rcport 50-298/87-32)

Areac Inspected: Routine, unannounced special inspection of securit Results: Within the area inspected, one violation was identified (access cdntrol - vehicles, paragraph 2).

~.-

$[

t-ENCLOSURE CONTAINS i SAFEGilARDS INFORMATIO UPON SEPARATION THIS FAGE IS DECONTROLLE .- . -. . . - . - -_ .-

.

Table A -13 -_

i

.

. ,

.

/' .

.?

PALO VERDE-1 GUIDE TUBE GROWTH DATA

.

AVERAGE GUIDE TUBE GROWTH (in.) AVERAGE GROWTH ASSEMBLY FLUENCE * i1 i 2- 'i 3 #4 (in.)-

...............................................................

i'

PIA 004 3.55 0.186 0.19 .171 0.166 0,180 PIA 068+ 3.53 0.100 0.095 0.112 0.123 0.108 PIA 069+ 3.54 0.110 0.141 0.154 0.119 0.131

PIB102 3.57 0.148 0.166 0.175 0.163 0.163 PIBil8 3.62 0.115 0.136 0.164 0.135- 0.138

>

PIB119 3.62 0.132 .0.169 0.186 0.137 0.156 .

'

,

PIB136 3.62 0.152 0.130 0.116 0.134 0.133

P2B233 3.58 0.124 0.137 0.14 .117 0.131 PIC005 2.46 0.140 0.138 0.133 0.137 0.137

'

PIC025 2.00 0.122 0.102 0.087 0.127 0.110 i PIB120+ 3.55 MEASUREMENTS NOT VALIO ERR

,

PIB205 3.18 MEASUREMENTS NOT VALID ERR

FLUENCE XE-21, n/sq. cm., E>0.821MeV k

+ CHARACTERIZED ASSEMBLY GUIDE TUBE IDENTIFICATION: #1-NE,#2-SE,i3-SW,#4-U '

b .

.

. .

I

>

I i

4

!

'

A -14

_ _ - _ _ _ . -

, , _ , . . , _ . , _.