IR 05000298/1987032

From kanterella
Jump to navigation Jump to search
Partially Withheld Insp Rept 50-298/87-32 on 871101-30 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected: Security
ML20149E717
Person / Time
Site: Cooper Entergy icon.png
Issue date: 12/18/1987
From: Bennett W, Madsen G, Plettner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20149E702 List:
References
50-298-87-32, NUDOCS 8801130448
Download: ML20149E717 (2)


Text

.

APPENDIX U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

NRC Inspection Report:

50-298/87-32 Operating License:

DPR-46 r

Docket:

50-298 License:

Nebraska Public Power District (NPPD)

,

P.O. Box 499 i

Columbus, NE 68601 i

Facility Name:

Cooper Nuclear Station (CNS)

Inspection At:

Cooper Nuclear Station, Nemaha County, Nebraska Inspection Conducted:

November 1-30, 1987 f

Inspectors:

M

/z//7//7

E. A. Plettner, Resident Inspector, (RI)

Date l

'

.

W/E Islt?l??

'

'

W. R. Bennett, Senior Resident Inspector, (SRI)

Date

[

,

Approved:

/

))h ift $'{11 n

G. L. Madsen, Actihg Chief) Project Section C Date Division of Reactor Projects

!

.

.

ENCLOSURE CONTAINS.

UPOtt SEPARATION THIS

.r b

"i ~Roi.t ED.

ENCLOSURE 8801130448 8 0111 PDR ADOCK O

SAFEGUARDS INFORMA i

G P

UPON SEPARATION Ilfl3

'

PAGE IS DECONTROLLEG,y r

d

,, _.

'

.

Inspection Summary pspection Conducted November 1-30, 1987 (Rcport 50-298/87-32)

Areac Inspected:

Routine, unannounced special inspection of security.

Results:

Within the area inspected, one violation was identified (access cdntrol - vehicles, paragraph 2).

~.-$[

t-ENCLOSURE CONTAINS iv.

SAFEGilARDS INFORMATION.

UPON SEPARATION THIS FAGE IS DECONTROLLE.-

.

-.

.

. -.

-

-_

.-

.

Table A -13

-_

i

.

.

,

.

/'

.

.?

PALO VERDE-1 GUIDE TUBE GROWTH DATA

.

AVERAGE GUIDE TUBE GROWTH (in.)

AVERAGE G.T.

G.T.

G.T.

G.T.

G.T.

GROWTH ASSEMBLY FLUENCE *

i1 i 2-

'i 3

  1. 4 (in.)-

i '

...............................................................

PIA 004 3.55 0.186 0.196.

0.171 0.166 0,180 PIA 068+

3.53 0.100 0.095 0.112 0.123 0.108 PIA 069+

3.54 0.110 0.141 0.154 0.119 0.131 PIB102 3.57 0.148 0.166 0.175 0.163 0.163

PIBil8 3.62 0.115 0.136 0.164 0.135-0.138 PIB119 3.62 0.132

.0.169 0.186 0.137 0.156

>

'

.

PIB136 3.62 0.152 0.130 0.116 0.134 0.133

,

P2B233 3.58 0.124 0.137 0.144.

0.117 0.131

PIC005 2.46 0.140 0.138 0.133 0.137 0.137

PIC025 2.00 0.122 0.102 0.087 0.127 0.110

'

i PIB120+

3.55 MEASUREMENTS NOT VALIO ERR PIB205 3.18 MEASUREMENTS NOT VALID ERR

,

FLUENCE XE-21, n/sq. cm., E>0.821MeV

+ CHARACTERIZED ASSEMBLY k

GUIDE TUBE IDENTIFICATION: #1-NE,#2-SE,i3-SW,#4-UW.

b

'

.

.

.

.

I

>

I i

4

!

'

A -14

_ _ -

_

_ _.

-

,

, _,.

., _.,

_.