N In R: ply Refer To:
Docket:
50-298/86-01 OLT 221986 Nebraska Public Power District ATTN:
J. M. Pilant, Manager, Technical Staff - Nuclear Power Group P. O. Box 499 Columbus, Nebraska 68601 Gentlemen:
Thank you for your letter of October 7,1986, in response to our letter and Notice of Violation dated September 8, 1986. We have reviewed your reply and find it responsive to the concerns raised in our Notice of Violation. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved ar.d will be
'
"
maintained.
,
Sincerely,
,
J. E. Gagliardo, Chief Reactor Projects Branch cc:
!
Guy Horn, Division Manager of Nuclear Operations Cooper Nuclear Station P. O. Box 98 Brownville, Nebraska 68321 Kansas Radiation Control Program Director Nebraska Radiation Control Program Director bcc distrib. by RIV:
i
,
l
- RPB DRSP
- RRI R. D. Martin, RA
'
- Section Chief (RPB/A)
- D. Weiss, LFMB (AR-2015)
- R&SPB
- RSB
- MIS System
- Sectip ief(RSB/05)
- RIV File
- J <Bo(a man
.~
- RSTS Operator C/ SA[x RSBk
[!-
- w/766 RIV:RSB/OS C/OS$
RPB JRBoardma DMHunnicutt JJatidon TFWesterman JEGagli rdo l0/p.0/86.
/O/Al/86 gOif /86 je/g/86
/ >p U
i 8610270061 861022 PDR ADOCK 05000298 l (
G PDR
-
)
.
n
.
'
GENERAL OFFICE Nebraska Public Power District
" "7EEdo" e%'f0'M""
"
__
/
f'b CNSS867847 October 7,1986 I
i
M@L I
OCT I 01986
/
L
\\
_._.i Mr. J. E. Gagliardo, Chief Reactor Projects Branch U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Subject:
NPPD Response to Inspection Report 50-298/86-01
Dear Mr. Gagliardo:
This letter is written in response to your letter dated September 8, 1986, transmitting Inspection Report 50-298/86-01.
Therein you indicated that one of our activities was in violation of NRC requirements.
Following is a statement of the violation and our response in accordance with 10 C FR2. 201.
STATEMENT OF VIOLATION Preventive Maintenance Procedures Cooper Nuclear Technical Specification, Section 6.3.3, states that procedures shall be provided for preventive maintenance of plant equipment that could have an effect on nuclear safety.
Contrary to the above, preventive maintenance procedures had not been provided for all of the plant equipment that could affect plant safety.
REASON FOR TIIE VIOLATION The statement of violation is correct in that preventive maintenance procedures do not exist for all safety related plant equipment.
It should be noted, however, that most of the vendor recommended preventive maintenance is performed on the majority of safety related equipment through either the CNS Preventive Maintenance (PM) Program, or the CNS Surveillance Program.
The violation occurred because the station did not have procedures which prescribed the manner in which the existing PM Program had been developed, nor did procedures exist which required the station PM Program to be maintained current with changing vendor recommendations.
I fy L41.- N
[L&g <li m O (l) G h6 T
_. _ _
__.
_
_-
'Mr. J.,
Octobar 7,1986 Page 2
.
CORRECTIVE STEPS TAKEN AND RESULTS ACHIEVED A PM upgrade program has been initiated' which, when completed, will cause the existing station PM requirements to reflect those recommended in the safety related vendor manuals. The program consists of:
1.
Comparing the existing station PM requirements to the vendor recommendations, and 2.
Resolving the differences either by generating new PM's or surveillance procedures or by an engineering evaluation to provide a documented disposition for not performing the vendor recommended action.
Presently, the program is approximately 65% complete.
CORRECTIVE STEPS WHICH WILL BE TAKEN TO AVOID FURTHER VIOLATIONS The upgrade program described above will be completed to make the PM program current.
It will also be maintained current in the future by establishing formal procedural controls.
DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED Formal procedural controls for maintaining the program will be in place by December,1986.
The upgrade of the present program win then be implemented by January,1987,. and full compliance will be achieved as of that date.
Should you have any questions regarding this response, please contact me.
Sincerely,
,
h J. M. Pflant Technical Staff Manager Nuclear Power Group
..
JMP:JRF:ss