IR 05000298/1982010
| ML20053A612 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 05/17/1982 |
| From: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| References | |
| NUDOCS 8205270001 | |
| Download: ML20053A612 (2) | |
Text
_ _ _ _.
_.
'
.
.
.
.
.
-
.
,
"
,
MAY l 71982
'
Docket: 50-290/82-10 Nebraska Public Power District ATTN: Mr. J. M. Pilant, Director of Licensing and Quality Assurance P. O. Box 499 Columbus Nebraska 68601 Gentlemen:
This letter refers to the April 5-9, 1982, routine inspection conducted by
Ms. C. Abigail Evans of HRC's Region IV office. The activitie.s inspected were those that are authorized under NRC License DPR-46. It tether refers
'
to the discussion that she had with Mr. Leo lessor concerning her findings at the conclusion of the inspection.
The inspection related to your program and activities designed to protect against industrial sabotage and to safeguard special nuclear material. The inspection was based on the applicable provisions of Title 10 Part 50 of the Code of Federal Regulations entitled " Licensing and Utilization
,
Facilities," within Part 73 entitled " Physical Protection of Plants and Materials," and the specific requirements of NRC License DPR-46. Areas examined during the inspection are discussed in the enclosed inspection report. Within these areas the inspection consisted of selective examina-tions of procedures and records, personnel interviews, and observations by the inspector.
f No violations of NRC requirements, within the scope of this inspection,
!
were identified.
The documentation of findings of your control and accounting procedures for safeguarding special nuclear materials and your facility's security proce-i dures are exempt from disclosure. This exemption is covered within Title 10 CFR Part 2, Section 2.790(d) entitled " Rules of Practice for Domestic Licensing Proceedings." Therefore, the inspection report will not f6
,
!
8205270 00;
l
&
,
RPB-1
'TPB, DRRP,&0[,,,, rap o"'c 0.PSS @,
.PSS,d d,
RPS. A,,p],
5""">..CM.ya.n.si.f...JMKe.l. ly......JWes.temn...M Asen.
.GDB. tow.
EG.agtanda.. h. Cal. lins....
,
,,,
d
..
" " " >
5L.7.l82 522l82..
5f.6.!.82
. 5($l.82....... 5!.L$82,...
5l0182.+.. 5IL3 /82.......
'
__ _yoaua(syoeysacuora O.FF ICI A L R ECO R D CO P Yi
_, _ _ _ _ __ _ _ _i_
__ _ _.
sac
____
_ _ __________________-__ - ______________________ ___________
~
~
.
.
.
.
.
.
WP h!AY 171982 Nebraska Public Power District-2-be placed in the Public Document Room and distribution will be limited.
If you have any questions concerning this report, we will be pleased to discuss them with you.
Sincerely, I
l Glen L. Madsen, Chief Reactor Project Branch 1 Enclosure:
Appendix - NRC Inspection Report 50-298/82-10
1 cc:
L. C. Lessor, Superintendent Cooper Nuclear Station Post Office Box 98 Brownville, Nebraska 68321 bcc: c/o DMB BC PM IE File IE/SB NMSS/SGPL NRR/DHFS NRR/DLB SSPB LPDR NRC PDR NSIC NTIS bcc:
RIV E. H. Johnson J. E. Gagliardo C. A. Evans J. A. Marshall J. M. Perry w.cc >
..
.
..
.
.
.
sua~aur>
,,,,
,,
.
.
..
.
-
.
.
.
DATEk
.
..
.
.
.
.
.
...
..........
.
...
..
.
[; nac roa m ao so, sacu o2'
OFFICIAL RECORD COPY