IE Insp Rept 50-298/82-37 on 821201-31.No Noncompliance Noted.Major Areas Inspected:Operational Safety Verifications,Monthly Surveillance & Maint Observations, Licensee Event Followup & Followup on Previous Items
ML20028F000
Person / Time
Site: Cooper Entergy icon.png
Issue date: 01/11/1983
From: Dubois D, Westerman T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20028E999 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.3, TASK-TM 50-298-82-37, NUDOCS 8301280332
Download: ML20028F000 (5)


Text

.

J

.

APPENDIX U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

,

Report:

50-298/82-37

.

Docket: 50-298 Licensee: Nebraska Public Power District P. O. Box 499-Columbus, Nebraska (R601

.

Facility Name: Cooper Nuclear Station Inspection At: Cooper Nuclear Station, Nemaha County, Nebraska Inspection Conducted: December 1-31, 1982

<

Inspector:

D. L. DuBois, Senior Resident Reactor Date Inspector

-

r

/!//[b Approved:

T. F. Westerman, Chief Cata Reactor Project Section A

'

Inspection Summary Inspection Conducted December 1-31, 1982 (Report 50-298/82-37)

Areas Inspected: Routine, announced inspection of operational safety verifications, monthly surveillance and maintenance observations, licensee event followup, followup of previously identified items, and TMI action plan requirements. This inspection involved 31 inspector-hours onsite by one NRC inspector.

Results: Within the areas inspected no violations or deviations were identified.

,

s 8301280332 830114 WDR ADOCK 05000298

@

PDR

.

- -

-

-

,

~

.

.

,

? '

e

'

'

.

,

.

,

.

-

DETAILS

'

.

1.

Persons Contacted Y

]

  • L. Lessor, Plant Superintendent P. Thomason, Ass't. Plant Superintendent K. Vire, Operations Supervisor V. Wolstenholm, QA Supervisor J. Sayer, C & HP Supervisor
  • Indicates presence at exit meetings.

2.

Operational Safety Verification The iRC inspector observed control room operations, instrumentation, controls, reviewed applicable logs, and cuducted discussions with control room operators.

The NRC inspector verified operability of:

Automatic Depressurization, System

"A"

& "B" Core Spray Systems Standby Liquid Control System Number 1 Diesel Generator

'

The NRC inspector reviewed safety clearance records, including verification

'

that affected components were remuWd from and returned to service in a correct and approved manner, that redundant equipment was verified operable, and that limiting conditions for operation were adequately identified and maintained.

The NRC inspector also verified that' maintenance requests had been initiated'for equipment discovered to require repair or routine pre-ventive upkeep, appropriate priority was assigned, and maintenance commenced in a timely manner commensurate with assigned priorities.

Tours of accessible areas of the facility were conducted to observe normal security practices, plant and equipment conditions. including cleanliness, radiological controls, fire suppression systems, emergency equipment, potential fire hazards, fluid leaks, exussive ' vibration and instrumentation adequacy.

These reviews and observations were conducted to verify that facility operations were in conformance with the requirements established in the Technical Specification, 10 CFR, and Administrative Procedures.

No violations or deviations were identified in this area.

3, Monthly Surveillance Observation

~

'

The NRC inspector observed portions of Technical Specification required '

surveillance tests to verify that testing was performed in accordance with adequate procedures, test instrumentation was in calibration, limiting.

conditiens for operations were met, removal and subsequent restoration of affected components was accomplished, test results conformed with

-

Technical Specification and procedure requirementt, tests were rAviewed uy

-.

-

-

-

.-.

.... -

.

.

.

-

personnel other than the person directing the test, and deficiencies identi.

fied during testing were properly reviewed and resolved by appropriate manage-

,

'

ment personnel.

.

The following Surveillance Tests were selected and observed:

6.2.1.4.2 PCIS MSL High Flow Calibration and Functional Test.

6.2.2.2.7 Safety Valve and Relief Valve Position Indicating Operability Check 6.3.12.1 Number 1 Diesel Generator Operability Test

.

These reviews and observations were conducted to verify that facil.its operations were in conformance with the requirements established in the Technicel Specification. 10 CFR, and administrative procedures.

N9 violations or deviations were identified in this area.

4.

Monthly Maintenance Observations The following clearance orders were independently verified for proper place-ment / restoration of affected components:

82-791, "C" Sparger Pump 82-793, Reactor Core Isolation Cooling Pump 82-799, Fire Protection System 82-801, Post Accident Sampling System Included with the above were checks for availability of redundant equipment, adequate safety isolation and clearanct, accomplishment of work in accordance with approved precedures and Technical Specification requirements, verifi-cation that QC checks were performed as required, cleanliness controls and health physics coverages were adequate.

No violations or deviations were identified in this area.

5.

Licensee Event Followup The following LER's are closed on the basis of the NRC inspector's inoffice review, review of licensee documentation, and discussions with licensee personnes:

LER 82-04 Failure of Suppression Chamber Level Instrument PC-LI-13.

LER 82-10 Trip of Diesel Generator #1-LER 82-11 Failure of Recirculation System Sample Vp;ve KR-740AV to Close LER 82-14 Abnormal Degradation of Reactor Water Cleanup System Piping 6.

Followup of Previously Identiffad Itemi Open Item 8112-01 (Closed) Installation of Standby Gas Treatment System (SGTS)

By-Pass Valves

'

In NRC Inspection Report 50-298/81-12, paragraph 10, the NRC. inspector docu-mented inspection results applicable to TMI Action Plan Item II.E.4.2, titled

-

..

-.

.

..

" Interim Position for Containment Purge and Vent Valve Operation."

Included was information concerning the installation of SGTS by-pass' valves.

During the 1981 review of Minor Design Change (MDC)80-003, titled " Standby Gas Treatment System Cross Connect to Spare Pipe to Elevated Release Point,"

several items remained incomplete pending the licensee's final review and approval of the MDC 80-003 completion report. The NRC inspector has sub-j sequently verified that operating procedures and as-built drawings were revised and that operations personnel received training applicable to MDC 80-003.

7.

NUREG - 0737, TMI Action Plan Requirements item II.B.3 Section 2.B (Closed) Post Accident Sampling - Modify NUREG - 0737, Item II.B.3, Post Accident Sampling Capability, requires the licensee to have the capability to promptly obtain reactor coolant and containment atmosphere sa;ples under accident conditions.

In NRC Inspection Repart 50-298/82-05, paragraph 7, the NRC inspector verified that the reactor coolant and containment atmosphere post accident sainpling system (PAS) was installed and operationtl.

S"5 sequent concerns were identified by the NRC Re9 ion IV staff concerning the ability of the licensee's staff to obtain samples in the event of a complete loss of onsite and offsite power.

In a letter from Pilant to Vassallo, dated September 1, 1982, the licensee provided the NRC with additional answers to the criteria applicable to this item.

Also, the NRC inspector reviewed CNS Chemistry Procedure 8.4.1.1, Revision 1, dated July 7, 1982, " Post Accident Sampling System Reactor Coolant and Containment Atmosphere Sampling," and verified that provisions for sampling during a complete loss of site power appear adequate.

The NRC inspector's review of the installed equipment and related docu--

mentation verified that the licensee is in conformance with the require-ments of NUREG - 0737, Item II.U.3 (2.B), and Task Item II.B.3 of TI2515/59.

8.

Exit Meetings Exit meetings were conducted at the conclusion of 9ach portion of the inspection. The plant superintendent was informed of the abcve findings.

.

,

mac U.S. NUCLEAR REGULATORY COMMISSION PRINCIPAL INSPECTC.WName last. Arst. and ewe are)

n, A,F,Oma ns

,

.

'E MC =s DuBois' D nnis L*

~

INSF ECTOR'S REPORT

,,y,,,,,

Office of Inspection and Enforcement Westerman, Thomas F.

.

sN58 ECTO 35 D. L. DuBois

.

TR AN 5ACTON UCE NSE E 'vE NOO, OOCKET NO t$ag

-)R LICENSE REPORT NEX T INSPEC. DATE 7p NO <ev PRODUCTut3ogena NO SEQ MO vm.

Nebraska Public Power District X

'

-'*55"'

O 5 0 0 0

4 A

2

7

^

-

01 mb 68601

_

C o - OEL E l

R - REPLACE D

_

l'

3.

15

6 L CO OF INVESTIGATIQN/ INSPECTION INSPECTION PERFORMEO 8v ORGAttZATON COCE OF REGON/HQ CONDUCT.

^

~

_]OTHER FWOM TO 1 - REGION AL OFFICE ST AFF m-w m uano

,a,ow,m e,, coa >

MO.

DAY vm MO.

CAY vm y

2 - MESIDENT INSPECTOF REGON Oiviss0N BRANCH

_

1l2 0 11 Al?

119 al1 g;

l C

A i

3 - PERFORMANCE APPRAISAL TEAM

25

31

33 i

l-3S REG 60NAL ACTION TYPE OF ACTIVITY CONOUCTED (Choct oce com oeuvi X

G - SAFETY

_

06 - MGMT.v! SIT 10 - PLANT SEC.

14 - INQUIRY

"

t - NRC FOfiM 591 03 INCIDENT 07 - FECAL 11 - INVENT VER 15 - *N% ESTIGATION

)(

2 - REGIONAL 08FICE LETTER 04 - ENFORCEMENT 08 - h NDOR 12 - SHIPMENT / EXPORT

'

~

05 - MGMT AUDir 09 - MAT. # FCT.

'3-IMPORT

37 3B WEGI.GN N.E 5 7 GAT.GN hNWNG5

'cwe aae fee oarvi

?OTAL NUMBER ENFORCEMENT CONFE MINCE REPORT CON TAaN 2 790 LETTER OR REPO,tf TR ANSMITTAL DATE OF viOLATCNS AND HELD aNFORMAflON A

C D

DEvtATCNS NRC FCRPA 591 REPORT SENT

,

OR RES TO HQ. FOR LETTER ISiUED ACTION 2 - VOLATCN Al8 3 - DEVIATON A

B C

D C

A

C D

MO DAY YR.

MO.

DAY YR.

4 - VIOL.ATON & DEVIATCN j

1 - vt5 1 - VES MN 'yf Mp l l

l

,

,

,

,

4041

43

  • It50 SS MODULE INFORM ATION MODULE *NF3aMATON N

MODULE NUM8ER INSP yg y MODULE PEO. FOLLOWUP E,k MODULE NUMBER INSP yg VODULE REQ. FOLLOWUP E5h5 8 8

  • E5555 58

r s ise

  1. 5

!s s

i s

!s

hYss 55

s s!

8s hs s

4a

!5

s

.

.

_

r i

t it

s;5?jiss sta tt it

s t i v it

s e B ijiEs 9 9 a c

2 : 1

s

I s5

sE s asa e8e

I s5 Ea

0,

I s5 E3

E a ssa e82

c sv i !

e i

5 3iOl7,0 3l

^

0 0i2 e i i

l I

i e

i 5 711i7:0,91 0 018 01918 C

i It i l

^

ii,I

IiiI

i,

i,

i i i i i i

liil c

i i i i i liil c

i,

, i i

liil o

Ii,i o

,,

,,

i

, i

,,

i e

i 5 6:117:2i61

^

0 0i4 li0i0 C i liil s 4,2 l7'pio l n in ia i i i liil

^

i IiiI

I,iI

'

i,

, i

.

i i i i i

li,I liii c

c l

i i i,

,

i,

i i i

I,,l liil o

i i

, I

,

,,

, i i

5 6,2 l7,0 3 l

^

0,0,5 1,0,0 C

liiI l

i

,

e i

5 92l7i0:11 Oioi2 i i

_

5 2i5l5i4i218

^

.

l lt i l

'

i i i i i lI i l

'

i i

, i i

!

liil C

!,! l C

i i i i

,

i i i i i i

l liil

!

1,,1

>

=

, i

,,

,

,,

i i

,

e i

5 7ill7i0i7!

^

Oi0i6 0i9i6 C

i e

i 5 2:5l5i5i9lB 0 i0 il Oi 7: 3l lii!

1 liil

^

,

!

!

!

liiI

?

i i i i i

!

c

!

liiI i i

, i i

! O CIRCLE SEQUENCE IF I

i vf0L ATON OR CEVIATION i g l l

[

j l

l j l l l

l l l r,p. iS

,0

,,

,3

,S

,,

,.

,,

,

,,

,, uun n

,.

,e

,

e

,e mm

,.

-.