IR 05000295-13-008 (Dnms); 05000304-13-008 (Dnms), 03/13-15/2013 and 03/25-29/2013; in Office Review Through 04/15/2013, Zion Nuclear Power Station
ML13115A272
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 04/24/2013
From: Christine Lipa
NRC/RGN-III/DNMS/MCID
To: Daly P
ZionSolutions
Slawinski W
References
IR-13-008
Download: ML13115A272 (21)


Text

April 24, 2013

SUBJECT:

NRC INSPECTION REPORT 05000295/2013008(DNMS);

05000304/2013008(DNMS) - ZION NUCLEAR POWER STATION

Dear Mr. Daly:

On March 29, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed onsite inspection activities for the first calendar quarter of 2013 at the permanently shut-down Zion Nuclear Power Station in Zion, Illinois. The inspection continued with in-office review through April 5, 2013. The purpose of the inspection was to determine whether decommissioning activities were conducted safely and in accordance with NRC requirements. The enclosed report presents the results of this inspection, which were discussed during a telephone call with Mr. Patrick Thurman on April 18, 2013.

During the inspection period, the NRC inspector reviewed aspects of the occupational radiation exposure monitoring program; the characterization and manifesting for a radioactive waste (RADWASTE) shipment of irradiated hardware in an NRC approved Type B cask; and implementation of the corrective action program (CAP). The CAP review included an evaluation of a recently identified condenser off-gas system configuration control issue.

The inspection consisted of an examination of activities at the site as they relate to safety and compliance with the Commissions rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observation of work activities, independent radiation measurements, and interviews with personnel.

Based on the results of this quarterly inspection, the inspector did not identify any violations of NRC requirements that were of greater than minor safety significance.

In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRC's

"Rules of Practice," a copy of this letter and the enclosed report will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you may have regarding this inspection.

Sincerely,

/RA/

Christine Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety

Docket Nos. 050-00295; 050-00304 License Nos. DPR-39; DPR-48

Enclosure:

Inspection Report No. 05000295/2013008(DNMS);

05000304/2013008(DNMS)

cc w/encl: Patrick Thurman, ZionSolutions

Gary Bouchard, ZionSolutions

Alan Parker, Energy Solutions

John Christian, Energy Solutions

Russ Workman, Energy Solutions

Illinois Department of Nuclear Safety

Kent McKenzie, Lake County Emergency Management Agency

Melinda Bush, Illinois General Assembly

JoAnn D. Osmond, Illinois General Assembly

Barry A. Burton, Lake County Administrator

Mark C. Curran, Jr., Lake County Sheriff

Laurie Cvengros, Village Clerk, Village of Beach Park, Illinois

Willard R. Helander, Lake County Clerk

Jana Lee, Village Clerk, Village of Winthrop Harbor, Illinois

Diane Burkamper, City Clerk, City of Zion, Illinois

Irene T. Pierce, Lake County, Illinois