U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION IV
Report No. 50-285/79-15 Docket No. 50-285 License No. DPR-40 Licensee:
Omaha Public Power District 1623 Harney Street Omaha, Nebraska 68102 Facility Name: Fort Calhoun Station, Unit 1 Inspection at: Blair, Nebraska Inspection Conducted: September 11-14, 1979 Date of Last Physical Security Inspection Visit: March 26-30, 1979 Type of Inspection: Unannounced Physical Security Inspectors:
/8"#df R. A. Caldwell, Physical Security / Investigation Date
'
Specialist
(A/{h 5~
-
-
C.Abigailfvans,PhysicalSecuritySpecialist.
Date Approved by:
Sc
/o - n-77
'G. L. Madsen, Chief, Reactor Operations and Date Nuclear Support Branch I.cipection Summary Areas Inspected:
Included review of Security Plan; Security Program Audit; Security Organization; Physical Barriers (Frotected Area); Physical Barriers (Vital Areas); Lighting; Access Control (Vital Areas); Alarm Stations; Communi-cations; Response; Records and Reports and IE Bulletin No. 79-16 follow-up.
- U/ 3E
't 0102900 57
..
__.. -.
- -.
.
_
..
..
The inspection involved 50 i:,spector-hours on-site by two NRC inspeccors.
Six inspector-hours were accomplished off-site and 4 inspector-hours were during off-shift periods.
R_esults: The licensee was found to be in compliance with NRC requirements within the 11 areas examined during the inspection.