IE Insp Rept 50-285/79-15 on 790911-14.No Noncompliance Noted.Major Areas Inspected:Security Plan,Security Program Audit,Physical Barriers & Communications.Details Withheld (Ref 10CFR2.790)
ML19256E114
Person / Time
Site: Fort Calhoun 
Issue date: 10/11/1979
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19256E112 List:
References
50-285-79-15, NUDOCS 7910290059
Download: ML19256E114 (2)


Text

.

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION IV

Report No. 50-285/79-15 Docket No. 50-285 License No. DPR-40 Licensee:

Omaha Public Power District 1623 Harney Street Omaha, Nebraska 68102 Facility Name: Fort Calhoun Station, Unit 1 Inspection at: Blair, Nebraska Inspection Conducted: September 11-14, 1979 Date of Last Physical Security Inspection Visit: March 26-30, 1979 Type of Inspection: Unannounced Physical Security Inspectors:

/8"#df R. A. Caldwell, Physical Security / Investigation Date

'

Specialist

(A/{h 5~

-

-

C.Abigailfvans,PhysicalSecuritySpecialist.

Date Approved by:

Sc

/o - n-77

'G. L. Madsen, Chief, Reactor Operations and Date Nuclear Support Branch I.cipection Summary Areas Inspected:

Included review of Security Plan; Security Program Audit; Security Organization; Physical Barriers (Frotected Area); Physical Barriers (Vital Areas); Lighting; Access Control (Vital Areas); Alarm Stations; Communi-cations; Response; Records and Reports and IE Bulletin No. 79-16 follow-up.

U/ 3E

't 0102900 57

..

__.. -.

- -.

.

_

..

..

The inspection involved 50 i:,spector-hours on-site by two NRC inspeccors.

Six inspector-hours were accomplished off-site and 4 inspector-hours were during off-shift periods.

R_esults: The licensee was found to be in compliance with NRC requirements within the 11 areas examined during the inspection.