SUBJECT:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT - INTEGRATED INSPECTION REPORT 05000282/2025002 AND 05000306/2025002

Dear Werner K. Paulhardt Jr.:

On June 30, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Prairie Island Nuclear Generating Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low safety significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; and the NRC Resident Inspector at Prairie Island Nuclear Generating Plant.

August 13, 2025

W. Paulhardt Jr.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Dariusz Szwarc, Chief Reactor Projects Branch 3 Division of Operating Reactor Safety Docket Nos. 05000282 and 05000306 License Nos. DPR-42 and DPR-60

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000282 and 05000306

License Numbers:

DPR-42 and DPR-60

Report Numbers:

05000282/2025002 and 05000306/2025002

Enterprise Identifier:

I-2025-002-0059

Licensee:

Northern States Power Company

Facility:

Prairie Island Nuclear Generating Plant

Location:

Welch, MN

Inspection Dates:

April 01, 2025, to June 30, 2025

Inspectors:

J. Bell, Branch Chief

B. Bergeon, Senior Operations Engineer

R. Farmer, Health Physicist

T. Henning, Senior Operations Engineer

M. Learn, Team Leader

K. Pusateri, Resident Inspector

D. Tesar, Senior Resident Inspector

T. Wingfield, Operations Engineer

Approved By:

Dariusz Szwarc, Chief

Reactor Projects Branch 3

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Prairie Island Nuclear Generating Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

Failure to Implement Structures Monitoring License Renewal Commitments as Described in the USAR.

Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000306/2025002-01 Open/Closed None 71111.15 The inspectors identified a Green finding and associated non-cited violation (NCV) of the Prairie Island Unit 2 Operating License Condition 2.C.(8)(b). Specifically, the licensee failed to implement the requirements of structures monitoring program inspections prior to October 29, 2014, to ensure that diesel equipment and vibration isolation elements for diesel equipment were inspected against established acceptance criteria to prevent the loss of intended function, as described in the License Renewal updated safety analysis report (USAR) supplement.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 entered the inspection period at, and remained at, full-rated thermal power until April 13, 2025. Unit 1 was reduced to approximately 40 percent power for condenser tube cleaning from April 13 through April 19, 2025. On April 19, 2025, Unit 1 was returned to full-rated thermal power and remained at or near full-rated thermal power for the remainder of the inspection period except for brief power reductions to perform surveillance testing, or flexible power operations.

Unit 2 entered the inspection period at full-rated thermal power and remained at or near full-rated thermal power for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather (AB-2), level 4 storm on April 28, 2025.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1)121 motor driven cooling water pump while aligned to B cooling water header on April 9, 2025 (2)12 diesel-driven cooling water pump while aligned to A cooling water header on April 9, 2025

(3) Unit 2 control rod drive power system on May 16, 2025 (4)121 spent fuel pool (SFP) pump walkdown while 122 SFP pump out of service (OOS)for maintenance on May 27, 2025

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Fire Detection Zone (FDZ) 31, 121 control room chiller room, auxiliary building, elevation 755' on April 22, 2025
(2) FDZ 35, during continuous fire watch on May 1, 2025
(3) FDZ 11, Fire Area 81, elevated risk due to 12 component cooling (CC) pump OOS maintenance on June 18, 2025

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the onsite fire brigade training and performance during an observation of crew five fire drill - fire in 2 GT transformer on June 2, 2025.

71111.07A - Heat Exchanger/Sink Performance

Annual Review (IP Section 03.01) (1 Sample)

The inspectors evaluated readiness and performance of:

(1) 122 SFP heat exchanger eddy current test on May 19, 2025

71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance

Requalification Examination Results (IP Section 03.03) (1 Sample)

(1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam administered from May 5, 2025, to June 13, 2025, and the biennial written examinations administered from May 5, 2025, to June 13, 2025.

71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Requalification Program (IP Section 03.04) (1 Sample)

(1) Biennial Requalification Written Examinations The inspectors evaluated the quality of the licensed operator biennial requalification written examination administered from May 5, 2025 to June 6, 2025.

Annual Requalification Operating Tests The inspectors evaluated the adequacy of the facility licensees annual requalification operating test administered from May 5, 2025, to June 6, 2025.

Administration of an Annual Requalification Operating Test The inspectors evaluated the effectiveness of the facility licensee in administering requalification operating tests required by 10 CFR 55.59(a)(2) and that the facility licensee is effectively evaluating their licensed operators for mastery of training objectives.

Requalification Examination Security The inspectors evaluated the ability of the facility licensee to safeguard examination material, such that the examination is not compromised.

Remedial Training and Re-examinations The inspectors evaluated the effectiveness of remedial training conducted by the licensee, and reviewed the adequacy of re-examinations for licensed operators who did not pass a required requalification examination.

Operator License Conditions The inspectors evaluated the licensees program for ensuring that licensed operators meet the conditions of their licenses.

Control Room Simulator The inspectors evaluated the adequacy of the facility licensees control room simulator in modeling the actual plant, and for meeting the requirements contained in 10 CFR 55.46.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during Unit 1 downpower for condenser waterbox cleaning on April 14, 2025.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated FLEX power operations in the control room on May 12, 2025.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (2 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Joint maintenance on emergency diesel generator expansion joints on May 19, 2025
(2) Inservice testing (IST) of cooling water valves during repairs on MV-32028 on June 25, 2025

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1)22 diesel-driven cooling water pump restoration steps and sequence on April 2, 2025

(2) Cable bundle support issue for Yellow channel reactor protection system on April 3, 2025 (3)21 safeguards exhaust ventilation fan risk management on April 23, 2025 (4)122 SFP heat exchanger CC leak during disassembly on May 20, 2025
(5) Unit 2 non-urgent rod control failure on May 19, 2025

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples, 2 Partials)

The inspectors evaluated the licensees justifications and actions associated with the following operability determinations and functionality assessments:

(1) Prompt operability for 121 control room air handler degraded boot on April 23, 2025
(2) Immediate operability of battery room SSCs with rising temperatures on May 2, 2025
(3) Prompt operability determination for CAP 501000098987, 25PIR-PI D5 ENG 1 Coolant Leak, on May 23, 2025
(4) Flux probe stuck inserted into core on May 28, 2025
(5) CST operability with 21 CST contamination on June 16, 2025 (6)

(Partial)

D6 operability for through-wall leak on April 1, 2025 (7)

(Partial)

Operability of void in 1RH-21 pipe and potential gas intrusion from reactor coolant system in Mode 1 (QIM 501000099808) on June 11, 2025

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (7 Samples)

(1)121 control room air handler PMT; Work Order (WO) 700153909, revision 0, on April 21, 2025

(2) D5 EDG PMT per WO 700154998 created 5/22/2025, on May 22, 2025
(3) WO 700149207, SP 1106A 12 Diesel CL Pmp Monthly - PMT Run, on May 5, 2025
(4) PE 3002-5-22, 22 DD [diesel-driven] CLG WTR Pump 10 Year Relay Replacement, revision 5, on April 4, 2025
(5) Diesel-driven fire pump charger replacement PMT on May 21, 2025
(6) PMT on 122 spent fuel pool heat exchanger on June 12, 2025
(7) WO 700145993, Train A CTMT FCU [fan cooling unit] CL [cooling water] QTR, on June 11, 2025

Surveillance Testing (IP Section 03.01) (3 Samples)

(1) SP 2251, Caustic Addition Valve Quarterly Test, revision 19, on April 10, 2025
(2) SP 2307, D6 Diesel Generator 6 Month Fast Start Test, revision 59, on April 30, 2025
(3) SP 2089A, Train A RHR Pump and Suction Valve from the RWST Quarterly Test, revision 40, on May 15, 2025

Inservice Testing (IST) (IP Section 03.01) (1 Sample)

(1) WO 700143234, SP 1155A CC Sys Qtr Test Trn A - Comprehensive IST Test, on May 5, 2025

Diverse and Flexible Coping Strategies (FLEX) Testing (IP Section 03.02) (1 Sample)

(1) TP 1877B, 122 Diesel Generator 300KW 3 Year Test and Inspection, on May 2,

RADIATION SAFETY

71124.07 - Radiological Environmental Monitoring Program

Environmental Monitoring Equipment and Sampling (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated environmental monitoring equipment and observed collection of environmental samples.

Radiological Environmental Monitoring Program (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the implementation of the licensees radiological environmental monitoring program.

GPI Implementation (IP Section 03.03) (1 Sample)

(1) The inspectors evaluated the licensees implementation of the Groundwater Protection Initiative (GPI) program to identify incomplete or discontinued program elements.

71124.08 - Radioactive Solid Waste Processing & Radioactive Material Handling,

Storage, & Transportation

Radioactive Material Storage (IP Section 03.01)

The inspectors evaluated the licensees performance in controlling, labeling and securing the following radioactive materials:

(1)area 19 satellite radiologically controlled area (2)containers in the rad waste storage building barrel yard

Radioactive Waste System Walkdown (IP Section 03.02) (2 Samples)

The inspectors walked down the following accessible portions of the solid radioactive waste systems and evaluated system configuration and functionality:

(1)aerated drains treatment system (2)spent resin tank (SRT) and associated resin sluice piping

Waste Characterization and Classification (IP Section 03.03) (2 Samples)

The inspectors evaluated the following characterization and classification of radioactive waste: (1)baffle bolt and clevis bolt maintenance filters (2)primary bead resin

Shipment Preparation (IP Section 03.04) (1 Sample)

(1) The inspectors observed the preparation of radioactive shipment 25-021 of an oil and grease chemistry sample on June 5, 2025.

Shipping Records (IP Section 03.05) (4 Samples)

The inspectors evaluated the following non-excepted radioactive material shipments through a record review:

(1)24-068, 2 Sealands of dry active waste (DAW) with friable asbestos, LSA-I (2)24-071, 5 containers of Westinghouse outage equipment, SCO-II (3)25-006, resin liner 179, LSA-II (4)25-012, 2 Sealands of DAW, LSA-II

INSPECTION RESULTS

Failure to Implement Structures Monitoring License Renewal Commitments as Described in the USAR.

Cornerstone Significance Cross-Cutting Aspect Report Section Mitigating Systems Green NCV 05000306/2025002-01 Open/Closed None 71111.15 The inspectors identified a Green finding and associated non-cited violation (NCV) of the Prairie Island Unit 2 Operating License Condition 2.C.(8)(b). Specifically, the licensee failed to implement the requirements of structures monitoring program inspections prior to October 29, 2014, to ensure that diesel equipment and vibration isolation elements for diesel equipment were inspected against established acceptance criteria to prevent the loss of intended function, as described in the License Renewal updated safety analysis report (USAR) supplement.

Description:

Condition 2.C.(8)(b) of Renewed Facility Operating License for Prairie Island Nuclear Generating Plant, Units 1 and 2, dated October 16, 2009, and supplemented on April 15, 2011, and the licensees USAR supplement submitted pursuant to 10 CFR 54.21(d) describe certain aging management programs (AMPs) and activities to be completed before the period of extended operation. The license condition required these activities to be completed no later than October 29, 2014.

One of these AMPs is the structures monitoring program, with enhancements that added inspections for diesel equipment, including its vibration isolation elements, evaluated against established acceptance criteria. This AMP is described in License Renewal USAR Supplement Appendix L, Section L.2.38, Structures Monitoring Program. This section states in part: The Structures Monitoring Program is a condition monitoring program that manages aging effects in structures, supports and structural components, including bolting, within the scope of License Renewal. The program performs periodic visual inspections to monitor the condition of structures, supports and components, including bolting, against established acceptance criteria to ensure that degradation is identified, evaluated, and, when necessary, corrected such that there is no loss of intended function.

On February 24, 2025, during a routine surveillance test on the Unit 2 D6 emergency diesel generator (EDG), a through-wall leak was discovered on the high temperature (HT) cooling water piping. On April 4, 2025, an operability evaluation of the D6 EDG determined in part that the failure mechanism was vibration-induced wear [] that developed slowly after approximately 35 years of operation. This through-wall leak resulted in the D6 EDG being removed from service and unavailable to perform its safety function, during implementation of the repairs.

During their review, the inspectors were unable to identify any record of planned maintenance activities which accomplished the required inspections. In addition, aging management inspection walkdowns, which are performed every 2 years, were generic in nature and did not have specific established acceptance criteria for the diesel equipment, nor the vibration isolation elements for diesel equipment. The inspectors concluded that the License Renewal requirement that components within the scope of the program, diesel equipment and the vibration isolation elements for diesel equipment, be inspected and evaluated against established acceptance criteria to ensure that degradation is identified, evaluated, and when necessary, corrected such that there is no loss of intended function, were not met.

Corrective Actions: The licensee has corrected the through-wall leak caused by the long-term vibration-induced wear and performed extent of condition walkdowns of the other D5 and D6 EDG engines. In addition, a CAP was initiated to address the acceptance criteria.

Corrective Action References:

501000095507, Through Wall Coolant Leak 501000096290, D6 Coolant Leak POD did not Address Loop 501000101168, D6 HT Coolant Pipe - Acceptance Criteria

Performance Assessment:

Performance Deficiency: The licensees failure to implement aging management program requirements as described by Section L.2.38 of License Renewal USAR Supplement Appendix L (a.k.a., the Structure Monitoring AMP) prior to October 29,2014, was contrary to Operating License Condition 2.C.(8)(b), and was a performance deficiency.

Screening: The inspectors determined the performance deficiency was more than minor (MTM) because it was associated with the Procedure Quality attribute of the Mitigating Systems cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the failure to incorporate established acceptance criteria into the AMP failed to ensure the identification, evaluation, and correction of the long-term vibration-induced wear of the D6 EDG cooling water piping, resulting in a through-wall leak, and the D6 EDG being taken out of service for repairs rendering it unavailable and unable to perform its intended safety function.

Significance: The inspectors assessed the significance of the finding using IMC 0609 Appendix A, The Significance Determination Process (SDP) for Findings At-Power.

The Inspectors determined that the answer to all six

(6) screening questions of Exhibit 2 - Mitigating Systems Screening Questions, Section A Mitigating SSCs and PRA Functionality (except Reactivity Control Systems) were answered No, based upon the conclusion that the D6 EDG would fulfill its 24-hour PRA mission time, resulting in the issue screening to Green.

Cross-Cutting Aspect: None

Enforcement:

Violation: Condition 2.C.(8)(b) of Renewed Facility Operating License for Prairie Island Nuclear Generating Plant, Units 1 and 2, dated October 16, 2009, and supplemented on April 15, 2011, states, The License Renewal USAR Supplement describes certain programs to be implemented and activities to be completed prior to the Period of Extended Operation (PEO). Additionally, it states, The licensee shall implement those new programs and enhancements to existing programs no later than October 29, 2014. Appendix L of the USAR (a.k.a., the License Renewal USAR Supplement), Section L.2.38, Structures Monitoring Program AMP, specifies in part that The program performs periodic visual inspections to monitor the condition of structures, supports and components, including bolting, against established acceptance criteria to ensure that degradation is identified, evaluated, and, when necessary, corrected such that there is no loss of intended function.

Commitment Number 30 from USAR Appendix L, Table L.5, License Renewal Commitments, state in part that, The following structures, components, and component supports will be added to the scope of the inspections: [...] diesel equipment, [] and [...]

vibration isolation elements for diesel equipment.

Contrary to the above, the licensee failed to implement the Structures Monitoring AMP, as described in the License Renewal UFSAR Supplement, prior to October 29, 2014.

Specifically, the licensee did not incorporate into their AMP established acceptance criteria to ensure that degradation was identified, evaluated, and corrected to prevent loss of function for diesel equipment or vibration isolation elements for diesel equipment. Ultimately, this allowed long-term vibration-induced degradation to go uncorrected, culminating in a through-wall leak in the HT cooling water piping on the D6 EDG. The degradation, which developed over approximately 35 years of operation, ultimately rendered the D6 EDG inoperable and unavailable from February 26, 2025, through February 27, 2025.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified that no proprietary information was retained or documented in this report.

  • On June 30, 2025, the inspectors presented the integrated inspection results to Werner Paulhardt, Site Vice President, and other members of the licensee staff.
  • On May 23, 2025, the inspectors presented the biennial requalification program inspection results to Werner Paulhardt, Site Vice President, and other members of the licensee staff.
  • On June 6, 2025, the inspectors presented the radiation protection inspection results to Werner Paulhardt, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Procedures

AB-2

Severe Weather

71111.04

Procedures

1C20.7

D1/D2 Diesel Generators

71111.04

Procedures

C1.1.35-3

Cooling Water System

71111.04

Procedures

C16-1

Spent Fuel Pool Cooling Checklist

71111.05

Fire Plans

FDZ 11

Bus Rms 15 & 16 Unit 1 715'

71111.05

Fire Plans

FDZ 31

21 & 122 Control Room Chiller Aux Bldg 755'

71111.05

Fire Plans

FDZ 35

& 22 Battery Rooms

71111.07A

Drawings

XH-106-86

Isometric Spent Fuel Cooling Unit 1

71111.11B

Corrective Action

Documents

501000075003

Equipment Position Not Identified

07/02/2023

71111.11B

Corrective Action

Documents

501000077842

Loss of CT-11 Due to 1H4 Trip

10/17/2023

71111.11B

Corrective Action

Documents

501000077958

Unit 1 Reactor Trip

10/19/2023

71111.11B

Corrective Action

Documents

501000079970

TS 3.7.12 FHA Issues

2/12/2023

71111.11B

Corrective Action

Documents

501000082457

PU&A When Performing 2C1.2-M2

03/04/2024

71111.11B

Corrective Action

Documents

501000083200

SP 1106B Reperformed

03/22/2024

71111.11B

Corrective Action

Documents

501000084597

SP 1159 Completed Unsat

04/27/2024

71111.11B

Corrective Action

Documents

501000084692

IST Inoperable CL Return Valves

04/28/2024

71111.11B

Corrective Action

Documents

501000087599

1R-37 OOS Impacts to TS 3.7.12

07/11/2024

71111.11B

Corrective Action

Documents

501000095753

SBT Data Not Sent to Records

03/03/2025

71111.11B

Corrective Action

Documents

501000095767

Exam Security (STA U/I)

03/04/2025

71111.11B

Corrective Action

Documents

501000095849

Missing 396 Missing from File

03/06/2025

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.11B

Corrective Action

Documents

501000095852

Operator LOR Training Not Completed

03/05/2025

71111.11B

Miscellaneous

1C1.2-BOP

Unit 1 Balance of Plant Systems Startup

10/27/2022

71111.11B

Miscellaneous

1C1.2-M1

Unit 1 Startup to Mode 1

10/27/2022

71111.11B

Miscellaneous

1C1.2-M2

Unit 1 Startup to Mode 2

10/27/2022

71111.11B

Miscellaneous

1C1.4

Unit 1 Power Operation

10/29/2022

71111.11B

Miscellaneous

1Q2023 SUPP

TP 1850

Crew Watchstanding Logs (1Q2023)

09/22/2023

71111.11B

Miscellaneous

1Q2023 TP 1850

Crew Watchstander Verification

09/22/2023

71111.11B

Miscellaneous

25 Biennial

Sample Plan

Exam Cross Check

03/31/2025

71111.11B

Miscellaneous

25 LOR

Operational

Sample Plan

Exam Cross Check

05/01/2025

71111.11B

Miscellaneous

2403

Scenario Based Testing LOR Week 1 Crew 6 Group 1

Validation

04/19/2024

71111.11B

Miscellaneous

2404S

Scenario Based Testing ILT Validation 2024-04

07/19/2024

71111.11B

Miscellaneous

25R-ADMIN-014

Job Performance Measure

71111.11B

Miscellaneous

25R-ADMIN-018

Job Performance Measure

71111.11B

Miscellaneous

25R-ADMIN-019

Job Performance Measure

71111.11B

Miscellaneous

25R-IP-022AP

Job Performance Measure

71111.11B

Miscellaneous

25R-IP-023

Job Performance Measure

71111.11B

Miscellaneous

25R-IP-028AP

Job Performance Measure

71111.11B

Miscellaneous

25R-IP-030

Job Performance Measure

71111.11B

Miscellaneous

25R-SIM-003

Job Performance Measure

71111.11B

Miscellaneous

25R-SIM-004

Job Performance Measure

71111.11B

Miscellaneous

25R-SIM-006AP

Job Performance Measure

71111.11B

Miscellaneous

25R-SIM-010AP

Job Performance Measure

71111.11B

Miscellaneous

3Q2023 SUPP

TP 1850

Crew Watchstanding Logs (3Q2023)

03/23/2024

71111.11B

Miscellaneous

3Q2023 TP 1850

Crew Watchstander Verification

03/23/2024

71111.11B

Miscellaneous

501000095767

Evaluation of STA Exam Security Event

71111.11B

Miscellaneous

Appendix C1B

Appendix - Reactor Startup Simulator testing

10/19/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.11B

Miscellaneous

Appendix D30

Post Refueling Startup Testing

10/20/2022

71111.11B

Miscellaneous

Appendix D32

Temperature Coefficient Measurement at Hot Zero Power

10/22/2022

71111.11B

Miscellaneous

Appendix D51

Temperature Coefficient Measurement at Power

10/22/2022

71111.11B

Miscellaneous

N-01

Core Performance Testing Unit 1 Cycle 33

07/12/2023

71111.11B

Miscellaneous

PI-LOR-NRC-

2501S

Simulator Exercise Guide

71111.11B

Miscellaneous

PI-LOR-NRC-

2502S

Simulator Exercise Guide

71111.11B

Miscellaneous

PI-LOR-NRC-

2504S

Simulator Exercise Guide

71111.11B

Miscellaneous

PI-LOR-NRC-

2506S

Simulator Exercise Guide

71111.11B

Miscellaneous

RR-01

Simulator Repeatability (Cycle 33)

05/03/2024

71111.11B

Miscellaneous

RT-01

Simulator Real Time Measurement (Cycle 33)

07/01/2024

71111.11B

Miscellaneous

S-01

Steady State Tests (Cycle 33)

03/17/2023

71111.11B

Miscellaneous

SRC 2024-02

Simulator Review Committee 2024-02

09/16/2024

71111.11B

Miscellaneous

SWR C3D-023

RHR System Trouble Alarm

04/12/2023

71111.11B

Miscellaneous

SWR C3D-037

Ovation Reset/Snap Conflicts Causing Crashes

2/07/2024

71111.11B

Miscellaneous

SWR C3D-044

5PS20 Power Supply Failure 24 VDC

09/05/2023

71111.11B

Miscellaneous

SWR C4D-026

CNTMT & RCS Pressure Post LOCA

07/18/2024

71111.11B

Miscellaneous

SWR C5D-025

Unexpected Simulator Critical Alarm

05/13/2025

71111.11B

Miscellaneous

T-03

Simultaneous Closure of All Main Steam Isolation Valves

(Cycle 33)

03/18/2024

71111.11B

Miscellaneous

T-05

Trip of Any Single Reactor Coolant Pump (Cycle 33)

03/18/2024

71111.11B

Miscellaneous

T-09

Maximum Size Unisolable Main Steam Line Rupture

(Cycle 33)

05/26/2023

71111.11B

Miscellaneous

T-10

Slow Primary System Depressurization to Saturated

Condition with Pressurizer Relief or Safety Valve Stuck

Open (Inhibit Activation of High Pressure ECCS) (Cycle 33)

07/02/2024

71111.11B

Miscellaneous

T-11

Maximum Design Load Rejection (Cycle 33)

07/02/2024

71111.11B

Miscellaneous

Week 3 Crew 2

RO Biennial

Written Exam

Written Exam

04/28/2025

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.11B

Miscellaneous

Week 3 Crew 2

SRO Biennial

Written Exam

Written Exam

04/28/2025

71111.11B

Procedures

FL-LOR

Fleet Licensed Operator Requalification Training Program

Description

71111.11B

Procedures

FP-T-SAT-40

Implementation Phase

71111.11B

Procedures

FP-T-SAT-71

Exam Security

71111.11B

Procedures

FP-T-SAT-73

Licensed Operator Requalification Program Examinations

71111.11B

Procedures

FP-T-SAT-74

NRC Operator License Application & Renewal Requirements

71111.11B

Procedures

FP-T-SAT-75

Job Performance Measure & Simulator Exercise Guide

Development

71111.11B

Procedures

FP-T-SAT-80

Simulator Configuration Management

71111.11B

Procedures

FP-T-SAT-81

Simulator Testing and Documentation

71111.11B

Self-Assessments QF0406

25 PINGP 71111.11

03/07/2025

71111.11Q

Procedures

1C1.4

Unit 1 Power Operation

71111.12

Engineering

Evaluations

2000024617

Steam from 12 RHR Pit After PMP Start

2/05/2024

71111.12

Miscellaneous

1067-0121-RPT-

001

RHR Pump Seal Failure Evaluation

71111.12

Procedures

FP-WM-MMP-01

Minor Maintenance Process

71111.12

Procedures

FP-WM-WOE-01

Work Order Execution Process

71111.12

Procedures

FP-WM-WOI-01

Work Identification, Screening, Validation, and Cancellation

71111.13

Procedures

1C5

Control Rod and Rod Position Indication Systems

71111.13

Procedures

C35

Cooling Water

100

71111.13

Procedures

FP-E-SE-03

CFR 50.59 and 72.48 Processes

71111.15

Corrective Action

Documents

501000098156

Battery Room Temp above C18.1 Limit

05/01/2025

71111.15

Engineering

Evaluations

2000017241

Request Number 417; Provide Copies of the Monthly

Inspections that have been done on the AFW Inlet with

the Leak

06/18/2025

71111.15

Engineering

Evaluations

2000017241

Request No.: 414; HT Cooling Water Pipe Characteristics

05/08/2025

71111.15

Engineering

Evaluations

2000017241

Request No.: 416; For the Recently Performed Analysis on

21 SFP HX Describe the Analysis that was Completed to

06/18/2025

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Leave the Probe in the Heat Exchanger

71111.15

Engineering

Evaluations

2000017425

MCC 1MA2 High Temp; CAP: 501000100300

71111.15

Engineering

Evaluations

2000017425

CAP 501000095507; POD 500000334155; Due to Leak on

the D6 Engine 1 High Temperature Cooling Water Pipe

71111.15

Engineering

Evaluations

2000017425

Prompt Operability Determination, CAP 501000095507,

POD 500000334155, Rev. 1; Leak on the D6 Engine 1

High Temperature Cooling Water Pipe

04/04/2025

71111.15

Miscellaneous

608000001293

Auxiliary Building High Temperature HELB Evaluation

(130F/150F)

06/25/2025

71111.15

Miscellaneous

Summary No.: 2-

MIC-2147

UT Examination; Procedure: FP-PE-NDE-425; Work Scope:

2R34 MIC; Report No.: 2R34-MIC-001;

WO: 700148314-0060

71111.15

Miscellaneous

Wartsila

Technical Bulletin

Cracks on Cylinder Heads, Engine Type UD30/33/45,

Issue 2

2/28/2014

71111.15

Procedures

FP-E-SE-05

Strategic Engineering Walkdowns

71111.15

Procedures

H10.1

ASME Inservice Testing Program

71111.15

Procedures

SP 1468.1

Unit 1 GL-08-01 Inspections for Mode 1,3, and 4

71111.24

Drawings

NE-40014 V

Sheet 3 SK-

601000002794-

Diesel Fire Pump

71111.24

Procedures

FP-WM-PLA-01

Work Order Planning Process

71111.24

Procedures

FP-WM-PMT-01

Post-Maintenance Testing

71111.24

Procedures

SP 2251

Caustic Addition Valve Quarterly Test

71111.24

Work Orders

WO 700128798

DD CL PMP Relays Replacements

03/30/2025

71111.24

Work Orders

WO 700143234

SP 1155A CC SYS QTR TEST TRN A

05/07/2025

71111.24

Work Orders

WO 700149207

SP 1106A 12 DIESEL CL PMP MNTHLY

05/16/2025

71111.24

Work Orders

WO 700153447

Replace 122 DDFP A Battery Charger

05/21/2025

71124.07

Corrective Action

Documents

501000095652

REMP TLDs Irradiated in Transit

2/24/2025

71124.07

Corrective Action

Documents

Resulting from

501000099647

Dose Tracking not Performed Per Procedure

06/05/2025

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Inspection

71124.07

Corrective Action

Documents

Resulting from

Inspection

501000099648

Septic System Question

06/05/2025

71124.07

Miscellaneous

FP-R-LIC-21

Records of Spills or Other Unusual Occurrences

01/15/2020

71124.07

Miscellaneous

L-PI-21-023

20 Annual Radiological Environmental Monitoring

Program Report

05/14/2024

71124.07

Miscellaneous

L-Pl-22-023

21 Annual Radiological Environmental Monitoring

Program Report

05/10/2022

71124.07

Miscellaneous

L-Pl-23-011

22 Annual Radiological Environmental Monitoring

Program Report

05/08/2023

71124.07

Miscellaneous

L-Pl-24-020

23 Annual Radiological Environmental Monitoring

Program Report

05/09/2024

71124.07

Miscellaneous

L-Pl-25-014

24 Annual Radiological Environmental Monitoring

Program Report

05/10/2025

71124.07

Miscellaneous

RPC REMP

LAND USE

CENSUS

24 Land Use Census at Prairie Island

10/12/2024

71124.07

Procedures

FP-CY-GWPP-01

Fleet Groundwater Protection Program

71124.07

Procedures

H4

Offsite Dose Calculation Manual (ODCM)

71124.08

Corrective Action

Documents

501000076498

RAM Sources not in Designated Location

09/01/2023

71124.08

Corrective Action

Documents

501000085925

Radman Showing Non-Existent Radioisotope

05/28/2024

71124.08

Corrective Action

Documents

501000092508

NOS: RW Shipment Document Deficiencies

11/20/2024

71124.08

Corrective Action

Documents

501000092592

Physical Security Precautions of RAM

11/21/2024

71124.08

Corrective Action

Documents

501000092613

Qual of Rad Mat Ship Supervisor Designee

11/21/2024

71124.08

Corrective Action

Documents

501000094094

FP-RP-RW-02 Has Misleading Information

01/15/2025

71124.08

Corrective Action

501000094439

Increased Barrel Yard Area Dose Rates

01/27/2025

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Documents

71124.08

Corrective Action

Documents

Resulting from

Inspection

501000099592

NRC RAD Ram Tag Illegible

06/04/2025

71124.08

Corrective Action

Documents

Resulting from

Inspection

501000099600

NRC RAD Backlog of Rad Waste

06/04/2025

71124.08

Corrective Action

Documents

Resulting from

Inspection

501000099611

NRC RAD Multiple DOP Testing Stickers

06/04/2025

71124.08

Miscellaneous

Fuel Integrity Radiochemistry Review, 1st Quarter 2025

Original

71124.08

Miscellaneous

QF1281

Sample Characterization Loading Form - Baffle Bolt and

Clevis Bolt Maintenance Filters

01/07/2025

71124.08

Miscellaneous

QF1281

Sample Characterization Loading Form - Primary Bead

Resin

11/09/2024

71124.08

Miscellaneous

QF1281

Sample Characterization Loading Form - Liner 179

11/09/2024

71124.08

Procedures

B21B

Liquid Waste System

71124.08

Procedures

D59

Process Control Program for Processing/Dewatering of

Radioactive Waste from Liquid Systems

71124.08

Procedures

FP-RP-CRS-01

Control, Inventory and Leak Testing of Radioactive Sources

71124.08

Procedures

FP-RP-RW-02

Radioactive Shipping Procedure

71124.08

Procedures

FP-RP-RW-04

Creating Radioactive Material Packages for Transportation

Offsite

71124.08

Procedures

FP-RP-RW-06

Create Radioactive Packages Using Radman

71124.08

Procedures

RPIP 1320

Monitoring of Rad Waste in Interim Storage

71124.08

Procedures

RPIP 1330

Satellite RCA Process

71124.08

Self-Assessments QF0406

Snapshot Assessment of Receipt, Storage, and Shipment

of Radioactive Materials

2/21/2025

71124.08

Shipping Records24-068

Sealands DAW, Contains Friable Asbestos

2/03/2024

71124.08

Shipping Records24-071

Westinghouse Outage Equipment

2/09/2024

71124.08

Shipping Records25-006

Liner 179

2/11/2025

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71124.08

Shipping Records25-012

Sealands DAW

04/08/2025

71124.08

Work Orders

WO 700128884

RADIOACTIVE SRCE INVENTORY / LEAK CK

07/22/2024

71152A

Work Orders

WO 700112675

RPIP 5001 D5/D6 FO STORAGE TK INSP

07/16/2024