U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
Report No. 50-282/79-05; 50-306/79-05 Docket No. 50-282; 50-306 License No. DPR-42; DPR-60 Licensee: Northern States Power Company 414 Nicollet Mall Minneapolis, MN 55401 Facility Name: Prairie Island Nuclear Generating Plant, Units 1 and 2 Inspection At: Prairie Island Site,.ed Wing, MN
.
Inspection Conducted: February 1-28, 1979 RFW 4 Inspector:
C. D. Feierabend 3-g - 7 7 RFW S Approved By:
R. F. Warnick, Chief Reactor Projects Section 2 3-8-77 Inspection Summary Inspection on February 1-28, 1979, (Report No. 50-282/79-05; 50-306/79-05)
Areas Inspected:
Routine resident inspection of plant operations, security and followup of reportable occurrences. The inspection involved 42 inspector hours onsite by one NRC inspectcr.
Results: No items sf noncompliance or deviations were identified.
7904130'56II
.
...
'
DETAILS
.
?
1.
Personnel Contacted F. Tierney, Plant Manager J. Brokaw, Plant Superintendent, Operations and Maintenance E. Watzl, Plant Superintendent, Plant Engineering and
Radiation Protection
A. Hunstad, Staff Engineer R. Lindsey, Superintendent, Operations J. Hoffman, Superintendent. Technical Engineering D. Schuelke, Superintendent, Radiation Protection R. Conklin, Supervisor, Security and Plant Services J. Leveille, Quality Assurance Engineer G. Sundberg Instrument Engineer D. Crago, Shif t Supervisor P. Ryan, Shift Supervisor P. Valtakis, Shift Supervisor D. Walker, Shift Supervisor H. Pemble, Shif t Supervisor 2.
Plant Operations The inspector reviewed plant operations including examination of selected operating logs, special orders, temporary memos, jumper and tagout logs for the month of February. Tours of the plant included walks through the various areas of the plant to observe operations and activities in progress; to inspect the status of monitoring instruments, to observe for adherence to radiation controls and fire protection rules, to check proper alignment of selected valves and equipment controls, and to review status of various alarmed annunciators with operators.
The inspector also reviewed instrument readings, annunicator status, recorder charts, surveillance records, and logs to verify that plant operations were maintained in accordance with Technical Specification requirements.
No items of noncompliance or deviations were identified.
3.
Security The inspector conducted periodic observations of access control,
'3 *
issuing badges, vehicle inspection, escorting, and communication checks.
t No items of noncompliance or deviations were identified.
-2-
_
.
.
_
.
e 4.
Licensee Event Reports (LER's)
The inspector revieued the following LER's submitted by the licensee and determined that reporting requirements had been met,
and that corrective actions appeared appropriate.
(Closed)
a.
P-RO-78-22 Excessive Packing Leakage from RHR Heat Exchanger Outlet Valve b.
P-RO-78-24 Setpoint Drift, Steam Flow Transmitter c.
P-RO-79-01 Overpower Delta T Function Setpoint Drift 0.1% High 5.
Exit Interviews The inspector attended an exit interview conducted by IE RIII inspectors L. Hueter and N. DuBry on February 23, 1979.
No items of noncompliance or deviations were identified.
The inspector conducted weekly interviews with plant management personnel and conducted an exit interview with Mr. Tierney at the conclusion of the inspection.
The inspector discussed the scope and results of the inspection.
-
No items of noncompliance or deviations were identified.
Attachments: Preliminary Inspection Findings-3-
.
.
-
c..
wo vs 1.N u e C.. v:, iu,., c... t,, 4,,,,,,,
.
PRELIMINARY INSPECTION FINDINGS s
l'
, 1.
LICENSEE 2.
REGIONAL OFFICE
,
Northern States Power Company U.S. Nuclear Regulatory Commission 414 Nicollet Mall Office of Inspection & Enforcement, RIII
,
Minneapolis, }D; 55401 799 Roosevelt Road
-
Prairie Island,1 (Redwing, MN)
""
7*
Prairie Island 2 (Redwing, MN)
3.
DOCKET NUMEERS 4.
LICENSE NUMBERS 5.
DATE OF INSPECTION 50-262; 50-306 DPR-42: DPR 60
/
/_ 4 jp
,
'
/
]'
6.
Within the scope of the inspection, no items of noncompliance or deviation were found.
7.
The following catters are preliminary inspection findings:
(
..
8.
These preliminary inspection findings will be reviewed by NRC Supervision /
Management at the Region III Office and they will correspond with you concerning any enforcement action.
Nuclear R(gulatory Commissio'n Inspector
.
.
.
-
Of fiCE Oi ih5r'LCTION AhD Ehrur.(.ffi:G
'
PRELIMINARY INSPECTION FINDINGS l'
1.
LICENSEE 2.
REGIONAI, OFFICE
,
Northern States Power Company 414 Nicollet Ibil U.S. Nuclear Regulatory Commission Office of Inspection & Enforcement, RIII
'
Minneapolis, m: 55401 799 Roosevelt Road
.
Prairie Island 1 (Redwing,IC;)
""
I'
Prairie Island 2 (Redwing, MN)
3.
DOCKET NUMBERS 4.
LICENSE NUMBERS 5.
DATE OF INSPECTION 50-262; 50-306 DPR-42: DPR 60 f gr g
,
j
&
i]
6.
k'ithin the scope of the inspection, no ite=s of noncompliance or deviation were found.
7.
The following matters are preliminary inspection findings:
(
-
8.
These preliminary inspection findings will be reviewed by NRC Supervision /
Management at the Region III Office anq they will correspond with you
-
concerning any enforcement action.
.
'
Nuclear R'egulatory Commission Inspector
._
,.
_
u;4;Ls, GF 1hb a.CIiON A:s a tvr.g e b...
.
PRELIMINARY INSPECTION FINDINGS i
l i
1.
LICENSEE 2.
REGIONAL OFFICE
,
Northern States Power Company U.S. Nuclear Regulatory Commission 414 Nicollet Mall Office of Inspection & Enforcement, RIII
,
Hinneapolis,}m 55401 799 Roosevelt Road
'
Prairie Island I (Redwing, MN)
Glen Ellyn, IL 60137 Prairie Island 2 (Redwing, }O;)
3.
DOCKET NL*MBERS 4.
LICENSE NUMBERS 5.
DATE OF INSPECTIOS 50-282; 50-306 DPR-42: DPR 60
[
y /-
g
]
6.
Within the scope of the inspection, no items of noncompliance or deviation were found.
e 7.
The following matters are preliminary inspection findings:
"
8.
These preliminary inspection findings will be reviewed by NRC Supervision /
Management at the Region III Office and they will correspond with you concerning any enforcement action.
'
Nuclear 11egulatory Com=ission Inspector l