IR 05000277/1981026

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Repts 50-277/81-26 & 50-278/81-29 on 811015-16 & 19-23.No Noncompliance Noted.Major Areas Inspected:Security Program Audit,Records & Repts & Security Sys Power Supply.Details Withheld (Ref 10CFR73.21)
ML20049H643
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/04/1982
From: Devlin J, Dunlap J, Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20049H640 List:
References
50-277-81-26, 50-278-81-29, NUDOCS 8203030403
Download: ML20049H643 (1)


Text

,

'

.

.

.

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION I

50-277/81-26 Report No.

50-278/81-29 50-277 DPR-44 Docket No.

50-278 License No.

DPR-56 Safeguards Group IV_

Licensee:

Philadelphia Electric Company REVIElGD BY 3 2301 Market Street y

I Philadelphia, Pennsylvania 19101

. totGANIZAT1011)

(MTA)

Facility Name:

Peach Bottom Atomic Power Station, Units ? and 3 Inspection at:

_ Delta, Pennsylvania Inspection conducted:

October 15-16 and 19-23, 1981 Date of Last Physical Protection Inspection:

June 9-12, 1981 Type of Inspect

Routine, Unannounced Physical Protection Inspectors: j Awa

fr A G. 4 Smith, Physical Protection Inspector

/ ddt s

d A / ~ fL J. M. Dunlap, P ysical rotection Inspector

' date Approved b Ly+ vor, I LL b

Yf.W. Devlin, Chief,PhysicalProtection date

'

(jSection,TechnicalInspectionBranch Inspection Summary:

Routine, Unannounced Physical Protection Inspection on October 15-16 and 19-23,1981 (Combined Report Nos. 50-277/81-26 and 50-278/81-29)

Areas Inspected:

Security Plan and Implementation Procedures; Security Organization (Management, Personnel, Response); Security Program Audit; Records and Reports; Testing and Maintenance; Locks, Keys, and Combinations; Physical Barriers (Protected Area, Vital Areas); Security System Power Supply; Lighting; Assessment Aids; Access Control (Personnel, Packages, and Vehicles); Detection Aids (Protected Area, Vital Area); Alarm Stations; and Communications.

The inspection involved 80 inspector-hours onsite by two region-based NRC inspectors.

The inspection was begun during regular hours; four inspector-hours were accomplished during off-shift periods.

Results: The licensee was found to be in compliance with NRC requirements in all areas examined.

THE INFORMATION ON THIS PAGE IS DEEMED TO BE APPROPRIATE S-F1-82-15 FOR PUBLIC DISCLOSURE PURSUANT T010 CFR 73.21 Copy 60f[ Copies S Pages WARNING: SAFEG T.D 5 U E0 m TIO:I THEREPORTDETAILSCONTAIN(SafeguardsInff SECTION 147 Ai ec 2c2 ACI 1954-8203030403 820219 y a ;.A m : 3 a it..

...-w.*

PDR ADOCK 05000277

,_% u.:s. a e 10L.- 73.21 Q

PDR