U.S. NUCLEAR REGULATORY CCM11SSION
< -
'
OFFICE OF INSPECTIci! AND EilFORCEf TENT
REGION I
Report flo. 50-277/81-04 50-278/81-04 50-277 DPR-44 Docket tio. 50-278 License No.
DPR-56 Safeguards Group Licensee:
Philadelphia Electric Comoany 2301 flarket Street Philadelphia, Pennsylvania Facility flame:
Peach Bottom Atomic Power Station, Units 2 and 3 Inspection at:
Delta, Pennsylvania Inspection conducted:
February 2-6, 1981 Date of Last Physical Security Inspection Visit:
Sectember 22-26, 1980 Type of Inspecti n: Soutine Unannounced Physical Security Inspectors :
/,1
'I s I, b iM/
G. C. Smith, Physical Security Inspector date signed Approved by h/
J. Devlin, Chief, Physical Protection date sijjned' /
Inspection Summary:
Routine, Unannounced Physical Protection Insnection on February 2-6, 1981 (Reportflos. 50-277/81-04 and 50-278/81-04)
Areas Inspected:
Included review of the Security Plan; Security Program Audit; Security Organization; Physical Barriers, (Protected Area) and (Vital Areas);
Lighting; Access Control, (Search) (Escorting) (Identification, Authorization and Badging) and (Vital Areas); Alarm Stations; Detection Aids; Comunications; Testing and flaintenance; Compensatory I!easures; ?ower Supply; Response; Locks, Keys and Combinations; and Records and Reports.
The inspection involved 35 inspector-hours onsite by one t:RC inspector.
The inspectior began during a regular shift; 3 inspector-hours were accomplished during off-shift periods.
Resul ts :
The licensee was found to be in compliance with NRC requirenents within tne twenty areas examined during the inspection.