IR 05000277/1981004

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Repts 50-277/81-04 & 50-278/81-04 on 810202-06.No Noncompliance Noted.Major Areas Inspected: Security Plan,Security Program Audit,Security Organization & Physical Barriers.Details Withheld (Ref 10CFR2.790)
ML20003E704
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/04/1981
From: Devlin J, Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20003E702 List:
References
50-277-81-04, 50-277-81-4, 50-278-81-04, 50-278-81-4, NUDOCS 8104100099
Download: ML20003E704 (1)


Text

,

\\

U.S. NUCLEAR REGULATORY CCM11SSION

< -

'

OFFICE OF INSPECTIci! AND EilFORCEf TENT

REGION I

Report flo. 50-277/81-04 50-278/81-04 50-277 DPR-44 Docket tio. 50-278 License No.

DPR-56 Safeguards Group Licensee:

Philadelphia Electric Comoany 2301 flarket Street Philadelphia, Pennsylvania Facility flame:

Peach Bottom Atomic Power Station, Units 2 and 3 Inspection at:

Delta, Pennsylvania Inspection conducted:

February 2-6, 1981 Date of Last Physical Security Inspection Visit:

Sectember 22-26, 1980 Type of Inspecti n: Soutine Unannounced Physical Security Inspectors :

/,1

'I s I, b iM/

G. C. Smith, Physical Security Inspector date signed Approved by h/

J. Devlin, Chief, Physical Protection date sijjned' /

Inspection Summary:

Routine, Unannounced Physical Protection Insnection on February 2-6, 1981 (Reportflos. 50-277/81-04 and 50-278/81-04)

Areas Inspected:

Included review of the Security Plan; Security Program Audit; Security Organization; Physical Barriers, (Protected Area) and (Vital Areas);

Lighting; Access Control, (Search) (Escorting) (Identification, Authorization and Badging) and (Vital Areas); Alarm Stations; Detection Aids; Comunications; Testing and flaintenance; Compensatory I!easures; ?ower Supply; Response; Locks, Keys and Combinations; and Records and Reports.

The inspection involved 35 inspector-hours onsite by one t:RC inspector.

The inspectior began during a regular shift; 3 inspector-hours were accomplished during off-shift periods.

Resul ts :

The licensee was found to be in compliance with NRC requirenents within tne twenty areas examined during the inspection.

" ' 04 900 04M