IR 05000277/1981021
| ML20038C894 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom, Limerick |
| Issue date: | 11/25/1981 |
| From: | Keimig R, Mccabe E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20038C885 | List: |
| References | |
| 50-277-81-21, 50-278-81-23, 50-352-81-15, 50-353-81-13, NUDOCS 8112140236 | |
| Download: ML20038C894 (3) | |
Text
.
.
U. S. Ml)LL.AR h lULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No. 50-27_7/_8l_-21, 50-278/81-23; 50-352/81-15, 50-353/81-13 Docket No./ License No. 50-277/DPR-44; ~ J-278/DPR-56; 50-352/CPPR-106; 50-353/CPPR-107 50-277, -278:C
.
Category _ _50_352, -353: A Priority
- _ _
.
Licensee: _ Philadelphia Electric Company (PECo)
2301 liarket Street Philadelphia, Pennsylvania 19101 Facilities:
Peach Bottom 2 & 3, Limerick 1 & 2 Meeting at:
PECo Corporate Office, Philadelphia, Pennsylvania
.
Meeting date:
September 4,1981
.
.
Reported by:
P. (O. b e %b 9 ll 6 l Pt E. C. McCabe, Jr.,
hief, Reactor Projects date signed Sectic P
d
-
Approved by.
f
//- J f-8/
_ _ _ _,
. K'eimig, C/ef, [jects Branch #2, DRPI date signed Summary _:
Meeting on September 4, 1951 (Report 50-277/81-21; 50-278/81-23; 50-352/81-15; 50-353/81-13)
Special, announced management meeting to present the appraisal by an NRC board convened in Region I to evaluate licensee perfonnance from July 1,1980 - June 30,1981 as part of the NRC's SALP program.
Peach Bottom appraisal areas were: Plant Operations; Refueling Operations; Maintenance; Surveillance and Inservice Testing; Personnel, Procedures, and Training; Fire Protection and Housekeeping; Design Changes and Modifications; Radiation Protection, Radioactive Waste Man?gement, and Transportation; Environmental Protection; Emergency Preparedness; ;'Sysical Security and Safeguards; Audits, Reviews, and Comittee Activities; rdministration, QA, and Records; and, Corrective Actions and Reporting.
Limerick appraisal creas were: Quality Assurance; Containment Structures; Safety-Related Structures; Pipe and Hangers; Safety-Related Components; Electrical Equipment and Wire; Instrumentation and Wire; Fire Protection; Corrective Actions and Reporting; Design and Design Changes; and Training.
Results: A sumary of the licensee perfonnance evaluation was presented.
8112140236 011201
{DRADOCK 05000277 PDR
_ _ _ _ _ _ _ _.
.
.
DETAILS 1.
Meeting Attendees a.
USNRC Attendees A. R. Blough, IE:RI Resident Inspector (Peach Bottom)
G. D. Calkins, NRR Project Manager (Limerick)
C. J. Cowgill, IE:RI Senior Resident Inspector (Peach Bottom)
J. P. Durr, IE:RI Senior Resident Inspector (Limerick)
M. B. Fairtile, NRR Project Manager (Peach Bottom)
R. C. Haynes, IE:RI Director R. R. Keimig, IE:RI Projects Branch #2 Chief E. C. McCabe, IE:RI Projects Section 2B Chief H. Schierling, IE:HQ SALP Staff b.
PECo Attendees W. M. Alden, Engireer In Charge, Nuclear Section, PECo V. S. Boyer, Senior Vice President, Nuclear Power, PECo G. T. Brecht, Assistant Chief Electrical Engineer, PECo J. M. Corcoran, Field QA Branch Head, E&R, PECo P,. J. Costagliola, General Supervisor, QA-EP, PECo S. L. Daltroff, Vice President, Electric Production, PECo G. N. DeCowsky, Chief Electrical Engineer, PECo C. W. Dick, Manager, Division QA, Bechtel Power Corporation C. R. Endriss, Engineer - QA-EP, PECo R. S. Fleishmann, Assistant Station Supertendent, PBAPS, PECo J. F. Franz, Assistant Station Superintendent, LGS, PECo J. W. Gallagher, Manager, Electric Production Department, PECo G. R. Hutt, Office QA Branch Head, PECo E. C. Kistner, Chief Mechanical Engineer, PECo E. R. Klossin, Project QAE, Bechtel Power Corporation
,
R. A. Mulford, Project Manager - Limerick, PECo L. B. Pyrih, Branch Head, Nuclear M.E., PECo W. S. Reese, Supervisor, Engineering, PBAPS (Construction), PECo S. R. Roberts, Operations Engineer, PBAF5. PECo W. T. Ullrich, Station Superintendent, PBAPS, PECo H. R. Walters, OA Manager, E&R, PECo W. C. Whitfield, Electrical Production Maintenance, PECo 2.
Meeting Scope Peach Bottom and Limerick Systematic Assessment of Licensee Performance.
The assessment period was July 1,1980-June 30,1091.
__.
.
-
_ _ _ _ - -
.
. _ - -
.
-
- -.
.
.
.
-
--
- c,
.
-
t 3.
Discussion A brief sumary of the Systematic Appraisal of Licensee Performance (SALP)
Program was presented to explain the basis and purpose of the evaluation.
The NRC Region I evaluation board meeting was discussed, including the appraisal period, perfomance data and the results of the board's evaluation.
The licensee will provide coments, concerning the evaluation, to the. Senior Resident Inspector within 2 weeks.
The SALP Cycle 2 evaluation report will be issued and distributed subsequent to NRC management's approval of SALP program' changes which implement the Comission's guidance of October 20, 1981. This guidance is documented in NRC report NUREG-0834, "NRC Licensee Assessments."