IR 05000277/1981011
| ML20009B844 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 06/29/1981 |
| From: | Joyner J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML19277A043 | List: |
| References | |
| NUDOCS 8107170238 | |
| Download: ML20009B844 (2) | |
Text
ENCLOSURES TRANSMITTED HEREWITH CONTAIN 10 CFR 2.790 INFORMATION
,.,
.
UNITED STATES
,
NUCLEAR REGULATORY COMMISSION
o t,
E
REGION I
631 PARK AVENUE
,o KING OF PRUSSIA, PENNSYLVANIA 19406 gg g g Docket Nos. 50-277 50-278 W
s
+
Philadelphia Electric Company T'
{r
>y
,
ATTN: Mr. S. L. Daltroff G
g, 1 -" JUL 1 G 1981 * 7-Vice President, Electric Production
w 2301 Market Street Philadelphia, Pennsylvania 19101 (
u,m g 7 Gentlemen:
'S Subject:
Combined Inspections 50-277/81-11 and 50-278/81-12 This refers to the routine safeguards inspection conducted by Mr. G. Smith of this office on April 20~24, 1981, at Peach Bottom Atomic Power Station, Units 2 and 3, Delta, Pennsylvania, cf activities authorized by NRC License Nos.
DPR-44 and DPR-56 and to the discussions of.our findings held by Mr. Smith with Mr. R. Fleischmann of your staff at the conclusion of the inspection.
%
Areas examined during this inspection are described in the Office of Inspection and Enforcement Inspection Report which is enclosed with this letter. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, documentation of findings of your control and accounting procedures for safeguarding special nuclear materials and your facility security measures for physical protection are deemed to be commercial or financial information within the meaning of 10 CFR 9.5(a)(4) and shall be subject to disclosure only in accordance with the provisions of 10 CFR 9.12; therefore, the enclosed inspection report will not be placed in the Public Document Room and will receive limited distribution.
No reply to this letter is required; however, should you have ar[y questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
^l W L28 J mes H. Joy
, Chief, Technical Inspection Branch, Division of Engineering and Technical Inspection 8107170238 810629 p
O dI l
ENCLOSURES TRANSMllTED HEREWITH CONTAIN 10 CFR 2.790 INFORMATION
.- __
.
. _ _.
.__.-
r ENCLOSURES TRANSMITTED HEREWITH CONTAIN 10 CFR 2.790 INFORMATION
.
.
Philadelphia Electric Company
2 9 JUN 1981
-
.
Enclosure:
Combined Office of Inspection and Enforcement Inspection Report llumt,ers 50-277/81-11 and 50-278/81-12 (Contains P.790(d)
Information)
cc (w report cover sheet only):
W. T. Ullrich, Station Superintendent J. D. McGolarick, Manager, Claims Division, Legal Department Troy B. Conner, Jr., Esquire Eugene J. Bradley, Esquire Raymond L. Hovis, Esquire Michael J. Scibinico, II, Assistant Attorney General
,
r
.
i i
..
ENCLOSURES TRANSMITTED HEREWITH
,
CONTAIN 10 CFR 2.790 INFORMATION