ML20003E701

From kanterella
Jump to navigation Jump to search
Forwards IE Safeguards Insp Repts 50-277/81-04 & 50-278/81-04 on 810202-06.No Noncompliance Noted
ML20003E701
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/06/1981
From: Martin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20003E702 List:
References
NUDOCS 8104100089
Download: ML20003E701 (2)


See also: IR 05000277/1981004

Text

UNITED STATES

[p g

D

NUCLEAR REGULATORY CoMMtsslON

f.

..oq

- REGION l

. : 'g

.3., ,

g.

m P A a .(, A V E N U E

3...

.. E

PUNG OF PRUSSI A. PENNSYt.VANiA 1HH

  • 1

6 MAR 1981

%,.'.v...e

-

,

Docket Nos. 50-277

50-278

b / 0),/

y

Philadelphia Electric Company-

' 59.

ATTN: Mr. S. Daltroff-

p

Vice President

-

y

$@#

.

Electric Production

C

h

3

gG

2301 Market Street

S-

ggM

/

'

Philadelphia, Pennsylvania

19101

Gentlemen:

/

j;;

Subject:

Inspection Numbers 50-277/81-04 and 50-278/81-04

This refers to the routine safeguards inspection conducted by Mr. G. C. Smith of

this office on February 2-6, 1981 at Peach Bottom Atomic Power Station Units 2-

and 3, . Delta, Pennsylvania of activities authorized by NRC License Nos. OPR-44

and DPR-56 and to the discussions of our findings held by Mr. G. C. Smith with

Mr. W. T. Ullrich of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Our inspector also verified the steps you -have taken to correct the items of

nonconpliance brought to your attention in the enclosure to our letter dated

October 2u, 1980.

We have no further questions regarding your action. at this

time.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,

' Title 10, Code of Federal Regulations, documentation of findings .of your control

and accounting procedures for safeguarding special nuclear materials and your

facility security measures for physical protection are deemed to be comercial

or financial information within the meaning of 10 CFR 9.5(a)(4) and shall be

subject to disclosure only in accordance with the provisions of 10 CFR 9.12;

therefore, the enclosed inspection report will not be placed in the Public

Document Room and will receive limited distribution.

k

8104400 O M

-

.

- .

-_

.

.-

.

.

..-

.

Philadelphia Electric Ccmpany

2

6 MAR test

No reply to this letter is required; however, should you have any questions

l

concerning this inspection, we will be pleased to' discuss them with you.

,

Sincerely,

'e'

A

m

Walter G. Martin, Chief

Safeguards Branch

Enclosure:

Combined Office of Inspection and Enforcement Inspection

Report Number 50-277/81-04 and 50-278/81-04

cc (w report cover sheet only):

W. T. Ullrich, Station Superintendent

Troy B. Conner, Jr. , Esquire

Eugene J. Bradley, Esquire

Raymond L. Hovis, Esquire

Michael J. Scibinico, II, Assistant Attorney General

,

.

1

k

t

,

,y-,

,

,,,-3

-

,w---

,.

,,y

-

4,----f

-

, - -

g

g