IR 05000275/2018004

From kanterella
Jump to navigation Jump to search
NRC Inspection Report 05000275/2018004 and 05000323/2018004
ML19028A382
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/28/2019
From: Mark Haire
NRC Region 4
To: Welsch J
Pacific Gas & Electric Co
References
IR 2018004
Download: ML19028A382 (22)


Text

January 28, 2019

SUBJECT:

DIABLO CANYON POWER PLANT - NRC INSPECTION REPORT 05000275/2018004 AND 05000323/2018004

Dear Mr. Welsch:

On December 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Diablo Canyon Power Plant, Units 1 and 2. On January 10, 2019, the NRC inspectors discussed the results of this inspection with you and other members of your staff.

The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Mark S. Haire, Chief Project Branch A Division of Reactor Projects

Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82

Enclosure:

Inspection Report 05000275/2018004 and 05000323/2018004 w/ Attachments:

1. Documents Reviewed 2. Request for Information

Enclosure U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Numbers:

05000275 and 05000323

License Numbers:

DPR-80 and DPR-82

Report Numbers:

05000275/2018004 and 05000323/2018004

Enterprise Identifier: I-2018-004-0001

Licensee:

Pacific Gas and Electric Company

Facility:

Diablo Canyon Power Plant, Units 1 and 2

Location:

Avila Beach, California

Inspection Dates:

October 1, 2018 to December 31, 2018

Inspectors:

C. Newport, Senior Resident Inspector

J. Reynoso, Resident Inspector

A. Athar, Project Engineer

P. Elkmann, Senior Emergency Preparedness Inspector

S. Hedger, Emergency Preparedness Inspector

R. Lanfear, Physical Security Inspector

Approved By:

Mark S. Haire, Chief

Project Branch A

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Diablo Canyon Power Plant, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC-identified and self-revealed findings, violations, and additional items are summarized in the table below. Licensee-identified non-cited violations are documented in the Inspection Results at the end of this report.

List of Findings and Violations

No findings or violations of more than minor significance were identified during the inspection.

PLANT STATUS

Units 1 and 2 began the inspection period at full power.

On November 28, 2018, Unit 1 reduced power to 50 percent to clean water boxes and condensers and to troubleshoot high vibrations on main feedwater pump 1-1. Unit 1 returned to full power on December 5, 2018.

On December 1, 2018, Unit 2 tripped from full power due to a full load reject. Unit 2 returned to full power on December 3, 2018.

On December 18, 2018, Unit 2 reduced power to 50 percent to clean water boxes and condensers. Unit 2 returned to full power on December 20, 2018.

Units 1 and 2 operated at full power for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/

reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515, Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.04 - Equipment Alignment

Partial Walkdown (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 1, emergency diesel generator 1-2 on October 24, 2018
(2) Unit 1, motor-driven auxiliary feedwater pump 1-2 on November 20, 2018
(3) Unit 1, residual heat removal pump 1-2 on December 4, 2018

71111.05AQ - Fire Protection Annual/Quarterly

Quarterly Inspection (5 Samples)

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Unit 2, component cooling water heat exchanger room in the turbine building 85 foot elevation on October 23, 2018
(2) Unit 2, auxiliary feedwater pump rooms in the auxiliary building 100 foot elevation on October 29, 2018
(3) Units 1 and 2, turbine building 104 foot elevation on November 5, 2018
(4) Units 1 and 2, cable spreading room, H block 128 foot elevation on December 18, 2018
(5) Units 1 and 2, turbine building 115 foot elevation on December 20, 2018

71111.07 - Heat Sink Performance

Heat Sink (1 Sample)

The inspectors evaluated the Unit 1, residual heat removal heat exchanger 1-1 performance on December 14, 2018.

71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance

Operator Requalification (1 Sample)

The inspectors observed and evaluated a crew of licensed operators in the plants simulator during steam generator tube rupture and loss of coolant accident scenarios on October 30, 2018.

Operator Performance (1 Sample)

The inspectors observed and evaluated operator performance during the following activities:

(1) Units 1 and 2, control board walkdowns and control room observations during deep backshift hours on October 13, 2018
(2) Unit 1, exercising full length control rods in accordance with surveillance testing procedure STP R-1A on October 25, 2018
(3) Unit 1, routine in-service testing and surveillance of auxiliary feedwater pump 1-1 on November 20, 2018
(4) Unit 1, changing letdown flow of the chemical and volume control system on November 26, 2018
(5) Unit 2, decrease in electric output to remove high pressure feedwater heater from service due to a steam leak on December 15, 2018
(6) Unit 2, power ramp to 50 percent reactor power due to degraded condenser conditions on December 18, 2018

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness (1 Sample)

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety-significant functions:

(1) Units 1 and 2, auxiliary feedwater on November 30, 2018

Quality Control (1 Sample)

The inspectors evaluated maintenance and quality control activities associated with the following equipment performance issues:

(1) Units 1 and 2, review of quality control on December 18, 2018

71111.13 - Maintenance Risk Assessments and Emergent Work Control

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) Unit 1, elevated risk due to battery charger 131 out of service for maintenance on October 16, 2018
(2) Unit 1, emergency diesel generator 1-2 out of service for major maintenance on November 6, 2018
(3) Unit 2, auxiliary saltwater pump 2-1 out of service for emergent motor replacement on November 15, 2018
(4) Unit 1, turbine-driven auxiliary feedwater pump 1-1 out of service for maintenance on November 20, 2018

71111.15 - Operability Determinations and Functionality Assessments

The inspectors evaluated the following operability determinations and functionality assessments:

(1) Unit 2, safety injection accumulator nitrogen fill rate changes on October 10, 2018
(2) Unit 1, centrifugal charging pump 1-2 inboard bearing damage on October 17, 2018
(3) Unit 2, 125 VAC ABB k-line breaker position on October 22, 2018
(4) Unit 2, special protection scheme switch modifications on December 4, 2018

71111.19 - Post Maintenance Testing

The inspectors evaluated the following post-maintenance tests:

(1) Unit 1, centrifugal charging pump 1-2, anti-rotation pin replacement, Work Order 64180661, on October 11, 2018
(2) Units 1 and 2, auxiliary building exhaust fan damper E-1, damper actuator replacement, Work Order 64009658, on October 17, 2018
(3) Unit 2, residual heat removal 2-2, HCV-637 potentiometer replacement, Work Order 60112923, on November 8, 2018
(4) Unit 1, emergency diesel generator 1-2, air start system maintenance including control valve replacement and repairs, Work Order 64162830, on November 9-10, 2018
(5) Unit 2, auxiliary saltwater pump 2-1, surveillance testing following motor replacement, Work Order 60114719, on November 16, 2018

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Routine

(1) Unit 1, exercising full length control rods, per procedure STP R-1A, on October 25, 2018

In-service (1 Sample)

(1) Unit 1, exercising turbine driven auxiliary feedwater steam admission valve FCV-95, per procedure STP V-3R5, on November 20, 2018

Reactor Coolant System Leak Detection (1 Sample)

(1) Unit 2, reactor coolant system liquid sample, per procedure CAP E-1:IV, on November 24, 2018

71114.01 - Exercise Evaluation

The inspectors evaluated the biennial emergency plan exercise on October 24, 2018. The exercise scenario simulated an accident and explosion with gas bottles used in welding which damaged two motor driven auxiliary feedwater pumps, an inadvertent action which damaged the third motor driven auxiliary feedwater pump, a pipe rupture which drained the refueling water storage tank into the Unit 1 fuel building, a feed line break in the turbine building, a broken core baffle plate which physically damaged fuel, and a radiological release to the environment. The inspectors observed the licensees critique of exercise performance on October 31, 2018.

71114.04 - Emergency Action Level and Emergency Plan Changes

The inspectors evaluated changes to the licensees Emergency Plan, Sections 1, 6, and 7, and Appendices A, D, F, and G, on October 25, 2018. These changes were submitted to the NRC in May, June, and September 2018. These evaluations do not constitute NRC approval.

71114.06 - Drill Evaluation

Drill/Training Evolution (1 Sample)

The inspectors evaluated simulator-based licensed operator requalification training that included implementation of the licensees emergency plan on October 16, 2018.

71114.08 - Exercise Evaluation - Scenario Review

The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on September 24,

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

(1) BI01: Units 1 and 2, Reactor Coolant System (RCS) Specific Activity Sample

[10/01/2017-09/30/2018]

(2) BI02: Units 1 and 2, RCS Leak Rate Sample [10/01/2017-09/30/2018]
(3) EP01: Drill/Exercise Performance Sample [10/01/2017-09/30/2018]
(4) EP02: Emergency Response Organization Drill Participation Sample

[10/01/2017-09/30/2018]

(5) EP03: Alert And Notification System Reliability Sample [10/01/2017-09/30/2018]

71152 - Problem Identification and Resolution

Semiannual Trend Review (1 Sample)

The inspectors reviewed the licensees corrective action program for trends that might be indicative of a more significant safety issue.

71153 - Follow-up of Events and Notices of Enforcement Discretion Events

The inspectors evaluated the licensees response to a Unit 2 full load reject and reactor trip, on December 1,

EXIT MEETINGS AND DEBRIEFS

On September 24, 2018, the inspectors discussed the proposed biennial exercise scenario with Mr. M. Ginn, Manager, Emergency Preparedness, and other members of the licensee staff.

On October 1, 2018, the inspectors discussed the proposed biennial exercise scenario with Ms. J. Berkely, Branch Chief, Technological Hazards Branch, FEMA Region IX, and other staff at FEMA Region IX.

On October 26, 2018, the inspectors discussed performance during the biennial emergency preparedness exercise with Ms. J. Berkely and other staff at FEMA Region IX.

On November 14, 2018, the inspectors presented the results of the inspection of the licensees biennial exercise with Ms. P. Gerfen, Station Director, and other members of the licensee staff.

On January 10, 2019, the inspectors presented the quarterly resident inspector inspection results to Mr. J. Welsch, Vice President Nuclear Generation and Chief Nuclear Officer, and other members of the licensee staff.

The inspectors verified no proprietary information was retained or documented in this report.

DOCUMENTS REVIEWED

71111.04: Equipment Alignment

Notification

50971726

Procedures

Number

Title

Revision

OP B-2:I

RHR System Alignment Verification for Plant Startup

OP D-1:II

Auxiliary Feedwater System - Alignment Verification for

Plant Startup

35B

OP J-6B:II

Diesel Generator 1-2 Make Available

OP J-6B:II-A

Diesel Generator 1-2 Alignment Checklist

71111.05: Fire Protection

Notifications

50951216

50873874

51003161

50994906

51000222

51000220

50382707

51008312

50654888

Procedure

Number

Title

Revision

OM8.ID4

Control of Flammable and Combustible Materials

Drawings

Number

Description

Revision

RA-15/16

Fire Drawing: Radiological Control Area & H Block Elev 100

Unit 2

RA-21/122

Fire Drawing: Radiological Control Area & H Block Elev 128 3

TB-14/16

Fire Drawing: Turbine Building Elev 85 Unit 2

TB-17/18

Fire Drawing: Turbine Building Elev 104 Units 1 and 2

71111.07: Heat Sink Performance

Procedure

Number

Title

Revision

MA1.ID22

Heat Exchanger Program

2B

71111.11: Licensed Operator Requalification Program and Licensed Operator

Performance

Procedures

Number

Title

Revision

JSIM-507

Evaluator Skills

OP AP-7

Degraded Condenser

OP B-1A:V

CVCS-Transfer Charging Pump

OP B-1A:XII

CVCS-Letdown System Establish Normal Letdown or

Change Flow

23A

TQ2.DC3

Licensed Operator Continuing Training Program

71111.12: Maintenance Effectiveness

Notifications

50998429

50998368

50998381

50998387

51000350

Procedures

Number

Title

Revision

AD9.DC2

Receipt Inspection and Acceptance Testing

7C

AD9.ID11

Supplier Evaluation Process

AD9.ID7

Receipt Inspection and Acceptance Testing

CF3.ID13

Replacement Part Evaluation and CITE

CF3.ID9

Design Change Notice

CF5.ID2

Control of Material in Storage

MA1.ID17

Maintenance Rule Monitoring Program

QCP 10.1

Receipt Inspection Program

QCP 10.2

Inspection Activities

QCP 10.22

Supplemental Verification Activities at Receipt

Drawing

Description

NCR-DC0-89-EN-N020

Other

Number

Description

Revision

DCM C-17

Hosgri Response Spectra

DCM S-3B

Auxiliary Feedwater

DCM T-6

Seismic Analysis

71111.13: Maintenance Risk Assessments and Emergent Work Control

Notification

5100915

Work Order 64161519

Procedures

Number

Title

Revision

AD7.DC6

On-line Risk Management

AD7.ID14

Assessment of Integrated Risk

AD7.ID17

PRA Significant Component Management

OP O-36

Protected Equipment Postings

71111.15: Operability Determinations and Functionality Assessments

Notifications

51000174

50849449

51004042

51004045

51002982

51004043

51004046

51004041

51004044

51000614

51000651

51000637

51006288

51006426

Work Order 60114068

Procedures

Number

Title

Revision

MP E-64.6A

Maintenance of ABB K-Line Circuit Breakers

45A

OM7.ID12

Operability Determination

OP1.DC1

Administrative Program to Control the Return to Power After

a Reactor Trip

2A

71111.19: Post-Maintenance Testing

Notifications

50992181

50992059

50954695

51000794

50823903

51004429

510004946

Work Orders

60112923

64197366

280662

206785

201570

64009658

64168537

Procedures

Number

Title

Revision

MP E-8.1

Centrifugal Charging Pump Motor Overhaul

MP I-1.4-6A

Hagan Remote/Manual Setpoint Station Acceptance Test

Procedure

MP M-17.9

Auxiliary Saltwater Pump Maintenance

OP H-1:1

Auxiliary Building Safeguards Ventilation (ABVS)

OP J-6B:IV

Manual Operations Emergency Diesel DG 1-1

STP M-21-RTS.1 Return Diesel Engine to Service Following Outage

Maintenance

STP M-4

Routine Surveillance Test of Auxiliary Building Safeguard Air

Filtration System

STP M-9A2

Diesel Emergency Generator Routine Surveillance Test

STP P-ASW-A21 Comprehensive Test of Auxiliary Saltwater Pump 2-1

STP V-2J3

Outside Containment Residual Heat Removal Isolation

Valves

STP V-3M2B

Exercising Valve RHR-HCV-637 RHR Heat Exchanger

Outlet Valve

Drawing

Number

Description

Revision

107710

Unit 2 Residual Heat Removal, Sheet 2

71111.22: Surveillance Testing

Notification

50971726

Work Orders

64197339

64198600

64198607

64181211

Procedures

Number

Title

Revision

CAP C-19:III

Boron Analysis

CAP E-1:IV

CVCS Influent Sampling

STP P-AFW-II

Routine Surveillance Testing of Turbine Driven AFW Pump

1-1

36B

STP R-1A

Exercising Full Length Control Rods

STP V-3R5

Exercising Steam Supply to AFW Stop Valve FCV-95

71114.01: Exercise Evaluation

Notifications

50877640

50877653

50880123

50880313

50881252

50904604

50934778

50935077

50946337

50946792

50955206

50959031

50959988

50967652

50981316

50982804

50986147

50993706

50997229

50997501

51002249

51002269

51002277

51002279

51002283

51002294

51002308

51002310

51002313

51002456

51002761

51002781

51002782

51002784

51002787

51002789

51002812

51003090

Procedures

Number

Title

Revision

EOP F-0

Critical Safety Function Status Trees

EP EF-1

Activation and Operation of the Technical Support Center,

August 27, 2018

EP EF-2

Activation and Operation of the Operational Support Center,

January 18, 2017

EP EF-3

Activation and Operation of the Emergency Operations

Facility, October 18, 2018

EP G-1

Emergency Classification and Emergency Plan Activation,

August 27, 2018

EP G-3

Emergency Notification of Offsite Agencies, August 27, 2018 60

EP G-4

Assembly and Accountability, January 19, 2017

EP G-5

Evacuation of Non-Essential Personnel, October 22, 2018

EP R-2

Release of Airborne Radioactive Materials Initial

Assessment, August 27, 2018

EP RB-10

Protective Action Recommendations, August 27, 2018

EP RB-17

Operating Instructions for Quickdose, August 27, 2018

EP RB-2

Emergency Exposure Guide, February 7, 2011

EP RB-3

Stable Iodine Thyroid Blocking, October 11, 2016

EP RB-8

Instructions for Field Monitoring Teams, March 12, 2018

Other

Number

Description

Date

Diablo Canyon Nuclear Power Plant Emergency Plan

September

2018

EP G-2,

11

Shift Phone Talker Checklist

August 6,

2018

EP G-3,

Instructions for Making Notification Phone Calls

August 14,

2018

71114.04: Emergency Action Level and Emergency Plan Changes

Notifications

50962681

50994795

Procedures

Number

Title

Revision

EP EF-1

Activation and Operation of the Technical Support Center

TS3.ID2

Licensing Basis Impact Evaluations, June 27, 2017

Other

Number

Description

Revision /

Date

Emergency Plan Section 1 (Revision 4.08) and Appendix

A (Revision 4.08)

June 13, 2018

Emergency Plan Section 4 (Revision 4.17) and Section 6

(Revision 4.19), Appendices D (Revisions 5.01 and 5.02),

F (Revision 4.06), and G (Revision 4.02)

September 26,

2018

Emergency Plan Section 6 (Revision 4.18) and Section 7

(Revision 4.21)

May 17, 2018

EP-CALC-DCPP-

1602

Containment Radiation EAL Threshold Values

PG&E Letter DCL-

18-010

Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL-

DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-26,

Materials License No. SNM-2511; Diablo Canyon

Independent Spent Fuel Storage Installation; Emergency

Plan Implementing Procedure Update

February 26,

2018

PG&E Letter DCL-

18-029

Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL-

DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-26,

Materials License No. SNM-2511; Diablo Canyon

Independent Spent Fuel Storage Installation; Emergency

Plan Implementing Procedure Update

April 11, 2018

PG&E Letter DCL-

18-041

Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL-

DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-26,

Materials License No. SNM-2511; Diablo Canyon

Independent Spent Fuel Storage Installation; Emergency

Plan and Emergency Plan Implementing Procedure

Update

May 17, 2018

PG&E Letter DCL-

18-044

Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL-

DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-26,

Materials License No. SNM-2511; Diablo Canyon

Independent Spent Fuel Storage Installation; Emergency

Plan Update

June 13, 2018

Other

Number

Description

Revision /

Date

PG&E Letter DCL-

18-056

Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL-

DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-26,

Materials License No. SNM-2511; Diablo Canyon

Independent Spent Fuel Storage Installation; Emergency

Plan Implementing Procedure Update

July 25, 2018

PG&E Letter DCL-

18-063

Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL-

DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-26,

Materials License No. SNM-2511; Diablo Canyon

Independent Spent Fuel Storage Installation; Emergency

Plan Implementing Procedure Update

August 23,

2018

PG&E Letter DCL-

18-074

Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL-

DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-26,

Materials License No. SNM-2511; Diablo Canyon

Independent Spent Fuel Storage Installation; Emergency

Plan Update

September 26,

2018

PG&E Letter DCL-

18-082

Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL-

DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-26,

Materials License No. SNM-2511; Diablo Canyon

Independent Spent Fuel Storage Installation; Emergency

Plan Implementing Procedure Update

October 15,

2018

Tracking Number:

2018-02

Update the Low Population Zone (LPZ) Definition

February 19,

2018

Tracking Number:

2018-09

Revise E-Plan Sections 7.1.1.3 and 7.1.4.3

March 7, 2018

Tracking Number:

2018-10

Revise E-Plan Sections 6.6.2.1, 6.6.2.2, and 6.6.7

March 7, 2018

Tracking Number:

2018-12

Revise E-Plan Section 7.7.8

March 7, 2018

Tracking Number:

2018-34

Document Conversion of DCL-16-099 Attachment 3 into

Emergency Plan Appendix D Format

June 18, 2018

Tracking Number:

2018-40

Changes Made to CS1.3 and CG1.2

July 10, 2018

Tracking Number:

2018-50

Document the Changes to Emergency Plan Appendix F

Rev. 4.06

June 9, 2018

Tracking Number:

2018-61

Add a HEPA Filter on the TSC Normal Ventilation System

and a Radiation Shield Assembly

July 17, 2018

Tracking Number:

2018-75

Update RM-14/14R Table R-1 Values

August 9,

2018

71114.06: Drill Evaluation

Procedures

Number

Title

Revision

EOP E-O

Reactor Trip or Safety Injection

R18-3

Simulator Event Sequence

TQ2.DC3

Licensed Operator Training Program

71151: Performance Indicator Verification

Notifications

50948620

50949924

50950208

50955950

50956892

50960063

50964200

50966964

50971951

50973193

50975431

50977094

50985644

50987750

50987962

50990683

50990684

Procedures

Number

Title

Revision

AWP EP-001

Emergency Preparedness Performance Indicators, April 24,

2017

AWP O-001

NRC Performance Indicators: RCS Specific Activity

CAP D-6

Specific Activity Determination in Liquid Samples

CY2.ID1

Radioactive Effluent Controls Program

EP G-1

Emergency Classification and Emergency Plan Activation

43, 44, 45

EP G-3

Emergency Notification of Offsite Agencies

58, 59, 60

EP MT-43

Early Warning System Testing and Maintenance, May 15,

2018

EP RB-10

Protective Action Recommendations

20, 21

STP R.10C

Reactor Coolant System Water Inventory Balance

XI1.ID5

Collection and Submittal of NRC Performance Indicators

Other

Number

Description

Revision /

Date

Diablo Canyon Power Plant Alert and Notification System

Design Report, Early Warning System, Revision 4

July 2016

RCS Dose Equivalent Iodine Quarterly Reports

PG&E DCPP

Performance

Indicator

Program 2017

and 2018

RCS Leakage Cycle 21 Data Units 1 and 2

January 16,

2017 through

November 13,

2018

DEPI PEG-08

Drill and Exercise Performance Indicator (DEPI)

Performance Evaluation Guide (PEG)

Lesson Plan:

E3ECA33-D

SGTR

Lesson Plan:

ECA00-A

Loss of All AC

Lesson Plan:

R176S4

EAL Evaluations

1A

71153: Follow-up of Events and Notices of Enforcement Discretion

Notifications

51007073

51007071

51006634

51003229

51002995

50996028

50996398

51006869

51006288

Procedures

Number

Title

Revision

OM7.ID1

Problem Identification and Resolution

OP1.DC1

Administrative Program to Control the Return to Power After

a Reactor Trip

2A

OP1.DC31

Dissemination of Operations Information

Request for Information for

Resident Inspection at

Diablo Canyon Power Plant -

4th Quarter 2018

Please provide the following documents (use date range of document request unless

otherwise noted):

1. Summary listing of all root and apparent cause evaluations performed on this system

2. Summary listing of all condition reports written on this system, sorted by category type

3. Summary listing of OE screening and dispositioning reviews

4. Summary listing of all corrective maintenance work orders, with description of work,

performed on this system

5. List of all work orders, with description of work, planned within the next 6 months (from

start of applicable quarter).

6. List of maintenance rule functional failure assessments - regardless of the result -

performed on this system for previous two years. Include condition report numbers for

each item on the list

7. Summary list of system design calculations

8. Summary list of fire impairments associated with this system

9. List of completed engineering changes and planned engineering changes (within the

next six months of start of applicable quarter) associated with this system.

10. Schedule of system surveillance and work activities for the planned quarter of interest.

11. Summary listing of temporary and permanent modifications associated with the system

completed within the last two years

2. Summary listing of 50.59 screenings and evaluations related to the system

13. Maintenance rule scoping and basis documents

14. Maintenance rule expert panel meeting minutes for meetings related to system

15. Current UA hours and UR data tracking documents (system health report)

4th Quarter 2018

System: Auxiliary Feedwater

IMS Upload Date Requested By: September 25, 2018

Date Range of Document Request: October 1, 2016 - Current

ML19028A382

SUNSI Review

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

By: MSH

Yes No

Publicly Available

Sensitive

NRC-002

OFFICE

SRI:DRP/A

RI:DRP/A

C:DRS/EB1

C:DRS/EB2

C:DRS/OB

C:DRS/PSB2

NAME

CNewport

JReynoso

VGaddy

JDrake

GWerner

HGepford

SIGNATURE

/RA/

/RA/

/RA/

/RA/

/RA/

/RA/

DATE

01/16/19

01/16/19

01/16/19

01/16/19

01/21/19

01/17/19

OFFICE

C:DRS/IPAT

SPE:DRP/A

BC:DRP/A

NAME

RKellar

RAlexander

MHaire

SIGNATURE

/RA/

/RA/

/RA/

DATE

01/16/19

01/22/19

01/28/19