ary 28, 2019

SUBJECT:

DIABLO CANYON POWER PLANT - NRC INSPECTION REPORT 05000275/2018004 AND 05000323/2018004

Dear Mr. Welsch:

On December 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Diablo Canyon Power Plant, Units 1 and 2. On January 10, 2019, the NRC inspectors discussed the results of this inspection with you and other members of your staff.

The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Mark S. Haire, Chief Project Branch A Division of Reactor Projects Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82 Enclosure:

Inspection Report 05000275/2018004 and 05000323/2018004 w/ Attachments:

1. Documents Reviewed 2. Request for Information

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Numbers: 05000275 and 05000323 License Numbers: DPR-80 and DPR-82 Report Numbers: 05000275/2018004 and 05000323/2018004 Enterprise Identifier: I-2018-004-0001 Licensee: Pacific Gas and Electric Company Facility: Diablo Canyon Power Plant, Units 1 and 2 Location: Avila Beach, California Inspection Dates: October 1, 2018 to December 31, 2018 Inspectors: C. Newport, Senior Resident Inspector J. Reynoso, Resident Inspector A. Athar, Project Engineer P. Elkmann, Senior Emergency Preparedness Inspector S. Hedger, Emergency Preparedness Inspector R. Lanfear, Physical Security Inspector Approved By: Mark S. Haire, Chief Project Branch A Division of Reactor Projects 1 Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Diablo Canyon Power Plant, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC-identified and self-revealed findings, violations, and additional items are summarized in the table below. Licensee-identified non-cited violations are documented in the Inspection Results at the end of this report.

List of Findings and Violations No findings or violations of more than minor significance were identified during the inspection.

PLANT STATUS

Units 1 and 2 began the inspection period at full power.

On November 28, 2018, Unit 1 reduced power to 50 percent to clean water boxes and condensers and to troubleshoot high vibrations on main feedwater pump 1-1. Unit 1 returned to full power on December 5, 2018.

On December 1, 2018, Unit 2 tripped from full power due to a full load reject. Unit 2 returned to full power on December 3, 2018.

On December 18, 2018, Unit 2 reduced power to 50 percent to clean water boxes and condensers. Unit 2 returned to full power on December 20, 2018.

Units 1 and 2 operated at full power for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/

reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515, Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.04 - Equipment Alignment Partial Walkdown

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 1, emergency diesel generator 1-2 on October 24, 2018
(2) Unit 1, motor-driven auxiliary feedwater pump 1-2 on November 20, 2018
(3) Unit 1, residual heat removal pump 1-2 on December 4, 2018

71111.05AQ - Fire Protection Annual/Quarterly Quarterly Inspection

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Unit 2, component cooling water heat exchanger room in the turbine building 85 foot elevation on October 23, 2018
(2) Unit 2, auxiliary feedwater pump rooms in the auxiliary building 100 foot elevation on October 29, 2018
(3) Units 1 and 2, turbine building 104 foot elevation on November 5, 2018
(4) Units 1 and 2, cable spreading room, H block 128 foot elevation on December 18, 2018
(5) Units 1 and 2, turbine building 115 foot elevation on December 20, 2018

71111.07 - Heat Sink Performance Heat Sink

The inspectors evaluated the Unit 1, residual heat removal heat exchanger 1-1 performance on December 14, 2018.

71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance Operator Requalification

The inspectors observed and evaluated a crew of licensed operators in the plants simulator during steam generator tube rupture and loss of coolant accident scenarios on

===October 30, 2018.

Operator Performance (1 Sample)===

The inspectors observed and evaluated operator performance during the following activities:

(1) Units 1 and 2, control board walkdowns and control room observations during deep backshift hours on October 13, 2018
(2) Unit 1, exercising full length control rods in accordance with surveillance testing procedure STP R-1A on October 25, 2018
(3) Unit 1, routine in-service testing and surveillance of auxiliary feedwater pump 1-1 on November 20, 2018
(4) Unit 1, changing letdown flow of the chemical and volume control system on November 26, 2018
(5) Unit 2, decrease in electric output to remove high pressure feedwater heater from service due to a steam leak on December 15, 2018
(6) Unit 2, power ramp to 50 percent reactor power due to degraded condenser conditions on December 18, 2018

71111.12 - Maintenance Effectiveness Routine Maintenance Effectiveness

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety-significant functions:

(1) Units 1 and 2, auxiliary feedwater on November 30, 2018

Quality Control (1 Sample)

The inspectors evaluated maintenance and quality control activities associated with the following equipment performance issues:

(1) Units 1 and 2, review of quality control on December 18, 2018

71111.13 - Maintenance Risk Assessments and Emergent Work Control

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) Unit 1, elevated risk due to battery charger 131 out of service for maintenance on October 16, 2018
(2) Unit 1, emergency diesel generator 1-2 out of service for major maintenance on November 6, 2018
(3) Unit 2, auxiliary saltwater pump 2-1 out of service for emergent motor replacement on November 15, 2018
(4) Unit 1, turbine-driven auxiliary feedwater pump 1-1 out of service for maintenance on November 20, 2018

71111.15 - Operability Determinations and Functionality Assessments

The inspectors evaluated the following operability determinations and functionality assessments:

(1) Unit 2, safety injection accumulator nitrogen fill rate changes on October 10, 2018
(2) Unit 1, centrifugal charging pump 1-2 inboard bearing damage on October 17, 2018
(3) Unit 2, 125 VAC ABB k-line breaker position on October 22, 2018
(4) Unit 2, special protection scheme switch modifications on December 4, 2018

71111.19 - Post Maintenance Testing

The inspectors evaluated the following post-maintenance tests:

(1) Unit 1, centrifugal charging pump 1-2, anti-rotation pin replacement, Work Order 64180661, on October 11, 2018
(2) Units 1 and 2, auxiliary building exhaust fan damper E-1, damper actuator replacement, Work Order 64009658, on October 17, 2018
(3) Unit 2, residual heat removal 2-2, HCV-637 potentiometer replacement, Work Order 60112923, on November 8, 2018
(4) Unit 1, emergency diesel generator 1-2, air start system maintenance including control valve replacement and repairs, Work Order 64162830, on November 9-10, 2018
(5) Unit 2, auxiliary saltwater pump 2-1, surveillance testing following motor replacement, Work Order 60114719, on November 16, 2018

71111.22 - Surveillance Testing The inspectors evaluated the following surveillance tests: Routine

(1) Unit 1, exercising full length control rods, per procedure STP R-1A, on October 25, 2018

In-service (1 Sample)

(1) Unit 1, exercising turbine driven auxiliary feedwater steam admission valve FCV-95, per procedure STP V-3R5, on November 20, 2018

Reactor Coolant System Leak Detection (1 Sample)

(1) Unit 2, reactor coolant system liquid sample, per procedure CAP E-1:IV, on November 24, 2018

71114.01 - Exercise Evaluation

The inspectors evaluated the biennial emergency plan exercise on October 24, 2018. The exercise scenario simulated an accident and explosion with gas bottles used in welding which damaged two motor driven auxiliary feedwater pumps, an inadvertent action which damaged the third motor driven auxiliary feedwater pump, a pipe rupture which drained the refueling water storage tank into the Unit 1 fuel building, a feed line break in the turbine building, a broken core baffle plate which physically damaged fuel, and a radiological release to the environment. The inspectors observed the licensees critique of exercise performance on October 31, 2018.

71114.04 - Emergency Action Level and Emergency Plan Changes

The inspectors evaluated changes to the licensees Emergency Plan, Sections 1, 6, and 7, and Appendices A, D, F, and G, on October 25, 2018. These changes were submitted to the NRC in May, June, and September 2018. These evaluations do not constitute NRC approval.

71114.06 - Drill Evaluation Drill/Training Evolution

The inspectors evaluated simulator-based licensed operator requalification training that included implementation of the licensees emergency plan on October 16, 2018.

71114.08 - Exercise Evaluation - Scenario Review

The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on September 24,

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

(1) BI01: Units 1 and 2, Reactor Coolant System (RCS) Specific Activity Sample

[10/01/2017-09/30/2018]

(2) BI02: Units 1 and 2, RCS Leak Rate Sample [10/01/2017-09/30/2018]
(3) EP01: Drill/Exercise Performance Sample [10/01/2017-09/30/2018]
(4) EP02: Emergency Response Organization Drill Participation Sample

[10/01/2017-09/30/2018]

(5) EP03: Alert And Notification System Reliability Sample [10/01/2017-09/30/2018]

71152 - Problem Identification and Resolution Semiannual Trend Review

The inspectors reviewed the licensees corrective action program for trends that might be indicative of a more significant safety issue.

71153 - Follow-up of Events and Notices of Enforcement Discretion Events

The inspectors evaluated the licensees response to a Unit 2 full load reject and reactor trip, on December 1,

EXIT MEETINGS AND DEBRIEFS

On September 24, 2018, the inspectors discussed the proposed biennial exercise scenario with Mr. M. Ginn, Manager, Emergency Preparedness, and other members of the licensee staff.

On October 1, 2018, the inspectors discussed the proposed biennial exercise scenario with Ms. J. Berkely, Branch Chief, Technological Hazards Branch, FEMA Region IX, and other staff at FEMA Region IX.

On October 26, 2018, the inspectors discussed performance during the biennial emergency preparedness exercise with Ms. J. Berkely and other staff at FEMA Region IX.

On November 14, 2018, the inspectors presented the results of the inspection of the licensees biennial exercise with Ms. P. Gerfen, Station Director, and other members of the licensee staff.

On January 10, 2019, the inspectors presented the quarterly resident inspector inspection results to Mr. J. Welsch, Vice President Nuclear Generation and Chief Nuclear Officer, and other members of the licensee staff.

The inspectors verified no proprietary information was retained or documented in this report.

DOCUMENTS REVIEWED

71111.04: Equipment Alignment

Notification

50971726

Procedures

Number Title Revision

OP B-2:I RHR System Alignment Verification for Plant Startup 26

OP D-1:II Auxiliary Feedwater System - Alignment Verification for 35B

Plant Startup

OP J-6B:II Diesel Generator 1-2 Make Available 40

OP J-6B:II-A Diesel Generator 1-2 Alignment Checklist 0

71111.05: Fire Protection

Notifications

50951216 50873874 51003161 50994906

51000222 51000220 50382707 51008312

50654888

Procedure

Number Title Revision

OM8.ID4 Control of Flammable and Combustible Materials 28

Drawings

Number Description Revision

RA-15/16 Fire Drawing: Radiological Control Area & H Block Elev 100 7

Unit 2

RA-21/122 Fire Drawing: Radiological Control Area & H Block Elev 128 3

TB-14/16 Fire Drawing: Turbine Building Elev 85 Unit 2 10

TB-17/18 Fire Drawing: Turbine Building Elev 104 Units 1 and 2 5

71111.07: Heat Sink Performance

Procedure

Number Title Revision

MA1.ID22 Heat Exchanger Program 2B

71111.11: Licensed Operator Requalification Program and Licensed Operator

Performance

Procedures

Number Title Revision

JSIM-507 Evaluator Skills 0

OP AP-7 Degraded Condenser 50

OP B-1A:V CVCS- Transfer Charging Pump 30

OP B-1A:XII CVCS- Letdown System Establish Normal Letdown or 23A

Change Flow

TQ2.DC3 Licensed Operator Continuing Training Program 29

71111.12: Maintenance Effectiveness

Notifications

50998429 50998368 50998381 50998387

51000350

Procedures

Number Title Revision

AD9.DC2 Receipt Inspection and Acceptance Testing 7C

AD9.ID11 Supplier Evaluation Process 8

AD9.ID7 Receipt Inspection and Acceptance Testing 9

CF3.ID13 Replacement Part Evaluation and CITE 31

CF3.ID9 Design Change Notice 0

CF5.ID2 Control of Material in Storage 15

MA1.ID17 Maintenance Rule Monitoring Program 31

QCP 10.1 Receipt Inspection Program 17

QCP 10.2 Inspection Activities 22

QCP 10.22 Supplemental Verification Activities at Receipt 1

Drawing

Description

NCR-DC0-89-EN-N020

Other

Number Description Revision

DCM C-17 Hosgri Response Spectra

DCM S-3B Auxiliary Feedwater 28

DCM T-6 Seismic Analysis

71111.13: Maintenance Risk Assessments and Emergent Work Control

Notification

5100915

Work Order 64161519

Procedures

Number Title Revision

AD7.DC6 On-line Risk Management 28

AD7.ID14 Assessment of Integrated Risk 18

AD7.ID17 PRA Significant Component Management 0

OP O-36 Protected Equipment Postings 17

71111.15: Operability Determinations and Functionality Assessments

Notifications

51000174 50849449 51004042 51004045

51002982 51004043 51004046 51004041

51004044 51000614 51000651 51000637

51006288 51006426

Work Order 60114068

Procedures

Number Title Revision

MP E-64.6A Maintenance of ABB K-Line Circuit Breakers 45A

OM7.ID12 Operability Determination 38

OP1.DC1 Administrative Program to Control the Return to Power After 12A

a Reactor Trip

71111.19: Post-Maintenance Testing

Notifications

50992181 50992059 50954695 51000794

50823903 51004429 510004946

Work Orders

60112923 64197366 64280662 60206785

201570 64009658 64168537

Procedures

Number Title Revision

MP E-8.1 Centrifugal Charging Pump Motor Overhaul 12

MP I-1.4-6A Hagan Remote/Manual Setpoint Station Acceptance Test 1

Procedure

MP M-17.9 Auxiliary Saltwater Pump Maintenance 32

OP H-1:1 Auxiliary Building Safeguards Ventilation (ABVS) 19

OP J-6B:IV Manual Operations Emergency Diesel DG 1-1 35

STP M-21-RTS.1 Return Diesel Engine to Service Following Outage 17

Maintenance

STP M-4 Routine Surveillance Test of Auxiliary Building Safeguard Air 41

Filtration System

STP M-9A2 Diesel Emergency Generator Routine Surveillance Test 10

STP P-ASW-A21 Comprehensive Test of Auxiliary Saltwater Pump 2-1 11

STP V-2J3 Outside Containment Residual Heat Removal Isolation 14

Valves

STP V-3M2B Exercising Valve RHR-HCV-637 RHR Heat Exchanger 0

Outlet Valve

Drawing

Number Description Revision

107710 Unit 2 Residual Heat Removal, Sheet 2 36

71111.22: Surveillance Testing

Notification

50971726

Work Orders

64197339 64198600 64198607 64181211

Procedures

Number Title Revision

CAP C-19:III Boron Analysis 0

CAP E-1:IV CVCS Influent Sampling 10

STP P-AFW-II Routine Surveillance Testing of Turbine Driven AFW Pump 36B

1-1

STP R-1A Exercising Full Length Control Rods 25

STP V-3R5 Exercising Steam Supply to AFW Stop Valve FCV-95 21

71114.01: Exercise Evaluation

Notifications

50877640 50877653 50880123 50880313

50881252 50904604 50934778 50935077

50946337 50946792 50955206 50959031

50959988 50967652 50981316 50982804

50986147 50993706 50997229 50997501

51002249 51002269 51002277 51002279

51002283 51002294 51002308 51002310

51002313 51002456 51002761 51002781

51002782 51002784 51002787 51002789

51002812 51003090

Procedures

Number Title Revision

EOP F-0 Critical Safety Function Status Trees 21

EP EF-1 Activation and Operation of the Technical Support Center, 55

August 27, 2018

EP EF-2 Activation and Operation of the Operational Support Center, 40

January 18, 2017

EP EF-3 Activation and Operation of the Emergency Operations 47

Facility, October 18, 2018

EP G-1 Emergency Classification and Emergency Plan Activation, 45

August 27, 2018

EP G-3 Emergency Notification of Offsite Agencies, August 27, 2018 60

EP G-4 Assembly and Accountability, January 19, 2017 30

EP G-5 Evacuation of Non-Essential Personnel, October 22, 2018 16

EP R-2 Release of Airborne Radioactive Materials Initial 36

Assessment, August 27, 2018

EP RB-10 Protective Action Recommendations, August 27, 2018 21

EP RB-17 Operating Instructions for Quickdose, August 27, 2018 1

EP RB-2 Emergency Exposure Guide, February 7, 2011 8

EP RB-3 Stable Iodine Thyroid Blocking, October 11, 2016 9

EP RB-8 Instructions for Field Monitoring Teams, March 12, 2018 29

Other

Number Description Date

Diablo Canyon Nuclear Power Plant Emergency Plan September

2018

EP G-2, Shift Phone Talker Checklist August 6,

11 2018

EP G-3, Instructions for Making Notification Phone Calls August 14,

2018

71114.04: Emergency Action Level and Emergency Plan Changes

Notifications

50962681 50994795

Procedures

Number Title Revision

EP EF-1 Activation and Operation of the Technical Support Center 55

TS3.ID2 Licensing Basis Impact Evaluations, June 27, 2017 44

Other

Revision /

Number Description Date

Emergency Plan Section 1 (Revision 4.08) and Appendix June 13, 2018

A (Revision 4.08)

Emergency Plan Section 4 (Revision 4.17) and Section 6 September 26,

(Revision 4.19), Appendices D (Revisions 5.01 and 5.02), 2018

F (Revision 4.06), and G (Revision 4.02)

Emergency Plan Section 6 (Revision 4.18) and Section 7 May 17, 2018

(Revision 4.21)

EP-CALC-DCPP- Containment Radiation EAL Threshold Values 1

1602

PG&E Letter DCL- Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL- February 26,18-010 DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-26, 2018

Materials License No. SNM-2511; Diablo Canyon

Independent Spent Fuel Storage Installation; Emergency

Plan Implementing Procedure Update

PG&E Letter DCL- Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL- April 11, 2018

18-029 DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-26,

Materials License No. SNM-2511; Diablo Canyon

Independent Spent Fuel Storage Installation; Emergency

Plan Implementing Procedure Update

PG&E Letter DCL- Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL- May 17, 2018

18-041 DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-26,

Materials License No. SNM-2511; Diablo Canyon

Independent Spent Fuel Storage Installation; Emergency

Plan and Emergency Plan Implementing Procedure

Update

PG&E Letter DCL- Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL- June 13, 2018

18-044 DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-26,

Materials License No. SNM-2511; Diablo Canyon

Independent Spent Fuel Storage Installation; Emergency

Plan Update

Other

Revision /

Number Description Date

PG&E Letter DCL- Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL- July 25, 2018

18-056 DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-26,

Materials License No. SNM-2511; Diablo Canyon

Independent Spent Fuel Storage Installation; Emergency

Plan Implementing Procedure Update

PG&E Letter DCL- Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL- August 23,18-063 DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-26, 2018

Materials License No. SNM-2511; Diablo Canyon

Independent Spent Fuel Storage Installation; Emergency

Plan Implementing Procedure Update

PG&E Letter DCL- Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL- September 26,18-074 DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-26, 2018

Materials License No. SNM-2511; Diablo Canyon

Independent Spent Fuel Storage Installation; Emergency

Plan Update

PG&E Letter DCL- Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL- October 15,18-082 DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-26, 2018

Materials License No. SNM-2511; Diablo Canyon

Independent Spent Fuel Storage Installation; Emergency

Plan Implementing Procedure Update

Tracking Number: Update the Low Population Zone (LPZ) Definition February 19,

2018-02 2018

Tracking Number: Revise E-Plan Sections 7.1.1.3 and 7.1.4.3 March 7, 2018

2018-09

Tracking Number: Revise E-Plan Sections 6.6.2.1, 6.6.2.2, and 6.6.7 March 7, 2018

2018-10

Tracking Number: Revise E-Plan Section 7.7.8 March 7, 2018

2018-12

Tracking Number: Document Conversion of DCL-16-099 Attachment 3 into June 18, 2018

2018-34 Emergency Plan Appendix D Format

Tracking Number: Changes Made to CS1.3 and CG1.2 July 10, 2018

2018-40

Tracking Number: Document the Changes to Emergency Plan Appendix F June 9, 2018

2018-50 Rev. 4.06

Tracking Number: Add a HEPA Filter on the TSC Normal Ventilation System July 17, 2018

2018-61 and a Radiation Shield Assembly

Tracking Number: Update RM-14/14R Table R-1 Values August 9,

2018-75 2018

71114.06: Drill Evaluation

Procedures

Number Title Revision

EOP E-O Reactor Trip or Safety Injection 45

R18-3 Simulator Event Sequence 0

TQ2.DC3 Licensed Operator Training Program 31

71151: Performance Indicator Verification

Notifications

50948620 50949924 50950208 50955950

50956892 50960063 50964200 50966964

50971951 50973193 50975431 50977094

50985644 50987750 50987962 50990683

50990684

Procedures

Number Title Revision

AWP EP-001 Emergency Preparedness Performance Indicators, April 24, 21

2017

AWP O-001 NRC Performance Indicators: RCS Specific Activity 13

CAP D-6 Specific Activity Determination in Liquid Samples 13

CY2.ID1 Radioactive Effluent Controls Program 14

EP G-1 Emergency Classification and Emergency Plan Activation 43, 44, 45

EP G-3 Emergency Notification of Offsite Agencies 58, 59, 60

EP MT-43 Early Warning System Testing and Maintenance, May 15, 15

2018

EP RB-10 Protective Action Recommendations 20, 21

STP R.10C Reactor Coolant System Water Inventory Balance 46

XI1.ID5 Collection and Submittal of NRC Performance Indicators 1

Other

Revision /

Number Description Date

Diablo Canyon Power Plant Alert and Notification System July 2016

Design Report, Early Warning System, Revision 4

RCS Dose Equivalent Iodine Quarterly Reports PG&E DCPP

Performance

Indicator

Program 2017

and 2018

RCS Leakage Cycle 21 Data Units 1 and 2 January 16,

2017 through

November 13,

2018

DEPI PEG-08 Drill and Exercise Performance Indicator (DEPI) 0

Performance Evaluation Guide (PEG)

Lesson Plan: SGTR 19

E3ECA33-D

Lesson Plan: Loss of All AC 22

ECA00-A

Lesson Plan: EAL Evaluations 1A

R176S4

71153: Follow-up of Events and Notices of Enforcement Discretion

Notifications

51007073 51007071 51006634 51003229

51002995 50996028 50996398 51006869

51006288

Procedures

Number Title Revision

OM7.ID1 Problem Identification and Resolution 53

OP1.DC1 Administrative Program to Control the Return to Power After 12A

a Reactor Trip

OP1.DC31 Dissemination of Operations Information 8

Request for Information for

Resident Inspection at

Diablo Canyon Power Plant -

4th Quarter 2018

Please provide the following documents (use date range of document request unless

otherwise noted):

1. Summary listing of all root and apparent cause evaluations performed on this system

2. Summary listing of all condition reports written on this system, sorted by category type

3. Summary listing of OE screening and dispositioning reviews

4. Summary listing of all corrective maintenance work orders, with description of work,

performed on this system

5. List of all work orders, with description of work, planned within the next 6 months (from

start of applicable quarter).

6. List of maintenance rule functional failure assessments - regardless of the result -

performed on this system for previous two years. Include condition report numbers for

each item on the list

7. Summary list of system design calculations

8. Summary list of fire impairments associated with this system

9. List of completed engineering changes and planned engineering changes (within the

next six months of start of applicable quarter) associated with this system.

10. Schedule of system surveillance and work activities for the planned quarter of interest.

11. Summary listing of temporary and permanent modifications associated with the system

completed within the last two years

2. Summary listing of 50.59 screenings and evaluations related to the system

13. Maintenance rule scoping and basis documents

14. Maintenance rule expert panel meeting minutes for meetings related to system

15. Current UA hours and UR data tracking documents (system health report)

4th Quarter 2018

System: Auxiliary Feedwater

IMS Upload Date Requested By: September 25, 2018

Date Range of Document Request: October 1, 2016 - Current

ML19028A382

SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: MSH Yes No Publicly Available Sensitive NRC-002

OFFICE SRI:DRP/A RI:DRP/A C:DRS/EB1 C:DRS/EB2 C:DRS/OB C:DRS/PSB2

NAME CNewport JReynoso VGaddy JDrake GWerner HGepford

SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ /RA/

DATE 01/16/19 01/16/19 01/16/19 01/16/19 01/21/19 01/17/19

OFFICE C:DRS/IPAT SPE:DRP/A BC:DRP/A

NAME RKellar RAlexander MHaire

SIGNATURE /RA/ /RA/ /RA/

DATE 01/16/19 01/22/19 01/28/19