January 28, 2019
SUBJECT:
DIABLO CANYON POWER PLANT - NRC INSPECTION REPORT 05000275/2018004 AND 05000323/2018004
Dear Mr. Welsch:
On December 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Diablo Canyon Power Plant, Units 1 and 2. On January 10, 2019, the NRC inspectors discussed the results of this inspection with you and other members of your staff.
The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Mark S. Haire, Chief Project Branch A Division of Reactor Projects
Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82
Enclosure:
Inspection Report 05000275/2018004 and 05000323/2018004 w/ Attachments:
1. Documents Reviewed 2. Request for Information
Enclosure U.S. NUCLEAR REGULATORY COMMISSION
Inspection Report
Docket Numbers:
05000275 and 05000323
License Numbers:
Report Numbers:
05000275/2018004 and 05000323/2018004
Enterprise Identifier: I-2018-004-0001
Licensee:
Pacific Gas and Electric Company
Facility:
Diablo Canyon Power Plant, Units 1 and 2
Location:
Avila Beach, California
Inspection Dates:
October 1, 2018 to December 31, 2018
Inspectors:
C. Newport, Senior Resident Inspector
J. Reynoso, Resident Inspector
A. Athar, Project Engineer
P. Elkmann, Senior Emergency Preparedness Inspector
S. Hedger, Emergency Preparedness Inspector
R. Lanfear, Physical Security Inspector
Approved By:
Mark S. Haire, Chief
Project Branch A
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Diablo Canyon Power Plant, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC-identified and self-revealed findings, violations, and additional items are summarized in the table below. Licensee-identified non-cited violations are documented in the Inspection Results at the end of this report.
List of Findings and Violations
No findings or violations of more than minor significance were identified during the inspection.
PLANT STATUS
Units 1 and 2 began the inspection period at full power.
On November 28, 2018, Unit 1 reduced power to 50 percent to clean water boxes and condensers and to troubleshoot high vibrations on main feedwater pump 1-1. Unit 1 returned to full power on December 5, 2018.
On December 1, 2018, Unit 2 tripped from full power due to a full load reject. Unit 2 returned to full power on December 3, 2018.
On December 18, 2018, Unit 2 reduced power to 50 percent to clean water boxes and condensers. Unit 2 returned to full power on December 20, 2018.
Units 1 and 2 operated at full power for the remainder of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/
reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515, Appendix D, Plant Status and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.04 - Equipment Alignment
Partial Walkdown (3 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 1, emergency diesel generator 1-2 on October 24, 2018
- (2) Unit 1, motor-driven auxiliary feedwater pump 1-2 on November 20, 2018
- (3) Unit 1, residual heat removal pump 1-2 on December 4, 2018
71111.05AQ - Fire Protection Annual/Quarterly
Quarterly Inspection (5 Samples)
The inspectors evaluated fire protection program implementation in the following selected areas:
- (1) Unit 2, component cooling water heat exchanger room in the turbine building 85 foot elevation on October 23, 2018
- (2) Unit 2, auxiliary feedwater pump rooms in the auxiliary building 100 foot elevation on October 29, 2018
- (3) Units 1 and 2, turbine building 104 foot elevation on November 5, 2018
- (4) Units 1 and 2, cable spreading room, H block 128 foot elevation on December 18, 2018
- (5) Units 1 and 2, turbine building 115 foot elevation on December 20, 2018
71111.07 - Heat Sink Performance
Heat Sink (1 Sample)
The inspectors evaluated the Unit 1, residual heat removal heat exchanger 1-1 performance on December 14, 2018.
71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance
Operator Requalification (1 Sample)
The inspectors observed and evaluated a crew of licensed operators in the plants simulator during steam generator tube rupture and loss of coolant accident scenarios on October 30, 2018.
Operator Performance (1 Sample)
The inspectors observed and evaluated operator performance during the following activities:
- (1) Units 1 and 2, control board walkdowns and control room observations during deep backshift hours on October 13, 2018
- (2) Unit 1, exercising full length control rods in accordance with surveillance testing procedure STP R-1A on October 25, 2018
- (3) Unit 1, routine in-service testing and surveillance of auxiliary feedwater pump 1-1 on November 20, 2018
- (4) Unit 1, changing letdown flow of the chemical and volume control system on November 26, 2018
- (5) Unit 2, decrease in electric output to remove high pressure feedwater heater from service due to a steam leak on December 15, 2018
- (6) Unit 2, power ramp to 50 percent reactor power due to degraded condenser conditions on December 18, 2018
71111.12 - Maintenance Effectiveness
Routine Maintenance Effectiveness (1 Sample)
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety-significant functions:
- (1) Units 1 and 2, auxiliary feedwater on November 30, 2018
Quality Control (1 Sample)
The inspectors evaluated maintenance and quality control activities associated with the following equipment performance issues:
- (1) Units 1 and 2, review of quality control on December 18, 2018
71111.13 - Maintenance Risk Assessments and Emergent Work Control
The inspectors evaluated the risk assessments for the following planned and emergent work activities:
- (1) Unit 1, elevated risk due to battery charger 131 out of service for maintenance on October 16, 2018
- (2) Unit 1, emergency diesel generator 1-2 out of service for major maintenance on November 6, 2018
- (3) Unit 2, auxiliary saltwater pump 2-1 out of service for emergent motor replacement on November 15, 2018
- (4) Unit 1, turbine-driven auxiliary feedwater pump 1-1 out of service for maintenance on November 20, 2018
71111.15 - Operability Determinations and Functionality Assessments
The inspectors evaluated the following operability determinations and functionality assessments:
- (1) Unit 2, safety injection accumulator nitrogen fill rate changes on October 10, 2018
- (2) Unit 1, centrifugal charging pump 1-2 inboard bearing damage on October 17, 2018
- (3) Unit 2, 125 VAC ABB k-line breaker position on October 22, 2018
- (4) Unit 2, special protection scheme switch modifications on December 4, 2018
71111.19 - Post Maintenance Testing
The inspectors evaluated the following post-maintenance tests:
- (1) Unit 1, centrifugal charging pump 1-2, anti-rotation pin replacement, Work Order 64180661, on October 11, 2018
- (2) Units 1 and 2, auxiliary building exhaust fan damper E-1, damper actuator replacement, Work Order 64009658, on October 17, 2018
- (3) Unit 2, residual heat removal 2-2, HCV-637 potentiometer replacement, Work Order 60112923, on November 8, 2018
- (4) Unit 1, emergency diesel generator 1-2, air start system maintenance including control valve replacement and repairs, Work Order 64162830, on November 9-10, 2018
- (5) Unit 2, auxiliary saltwater pump 2-1, surveillance testing following motor replacement, Work Order 60114719, on November 16, 2018
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance tests:
Routine
- (1) Unit 1, exercising full length control rods, per procedure STP R-1A, on October 25, 2018
In-service (1 Sample)
- (1) Unit 1, exercising turbine driven auxiliary feedwater steam admission valve FCV-95, per procedure STP V-3R5, on November 20, 2018
Reactor Coolant System Leak Detection (1 Sample)
- (1) Unit 2, reactor coolant system liquid sample, per procedure CAP E-1:IV, on November 24, 2018
71114.01 - Exercise Evaluation
The inspectors evaluated the biennial emergency plan exercise on October 24, 2018. The exercise scenario simulated an accident and explosion with gas bottles used in welding which damaged two motor driven auxiliary feedwater pumps, an inadvertent action which damaged the third motor driven auxiliary feedwater pump, a pipe rupture which drained the refueling water storage tank into the Unit 1 fuel building, a feed line break in the turbine building, a broken core baffle plate which physically damaged fuel, and a radiological release to the environment. The inspectors observed the licensees critique of exercise performance on October 31, 2018.
71114.04 - Emergency Action Level and Emergency Plan Changes
The inspectors evaluated changes to the licensees Emergency Plan, Sections 1, 6, and 7, and Appendices A, D, F, and G, on October 25, 2018. These changes were submitted to the NRC in May, June, and September 2018. These evaluations do not constitute NRC approval.
71114.06 - Drill Evaluation
Drill/Training Evolution (1 Sample)
The inspectors evaluated simulator-based licensed operator requalification training that included implementation of the licensees emergency plan on October 16, 2018.
71114.08 - Exercise Evaluation - Scenario Review
The inspectors reviewed and evaluated the proposed scenario for biennial emergency plan exercise on September 24,
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
- (1) BI01: Units 1 and 2, Reactor Coolant System (RCS) Specific Activity Sample
[10/01/2017-09/30/2018]
- (2) BI02: Units 1 and 2, RCS Leak Rate Sample [10/01/2017-09/30/2018]
- (3) EP01: Drill/Exercise Performance Sample [10/01/2017-09/30/2018]
- (4) EP02: Emergency Response Organization Drill Participation Sample
[10/01/2017-09/30/2018]
- (5) EP03: Alert And Notification System Reliability Sample [10/01/2017-09/30/2018]
71152 - Problem Identification and Resolution
Semiannual Trend Review (1 Sample)
The inspectors reviewed the licensees corrective action program for trends that might be indicative of a more significant safety issue.
71153 - Follow-up of Events and Notices of Enforcement Discretion Events
The inspectors evaluated the licensees response to a Unit 2 full load reject and reactor trip, on December 1,
EXIT MEETINGS AND DEBRIEFS
On September 24, 2018, the inspectors discussed the proposed biennial exercise scenario with Mr. M. Ginn, Manager, Emergency Preparedness, and other members of the licensee staff.
On October 1, 2018, the inspectors discussed the proposed biennial exercise scenario with Ms. J. Berkely, Branch Chief, Technological Hazards Branch, FEMA Region IX, and other staff at FEMA Region IX.
On October 26, 2018, the inspectors discussed performance during the biennial emergency preparedness exercise with Ms. J. Berkely and other staff at FEMA Region IX.
On November 14, 2018, the inspectors presented the results of the inspection of the licensees biennial exercise with Ms. P. Gerfen, Station Director, and other members of the licensee staff.
On January 10, 2019, the inspectors presented the quarterly resident inspector inspection results to Mr. J. Welsch, Vice President Nuclear Generation and Chief Nuclear Officer, and other members of the licensee staff.
The inspectors verified no proprietary information was retained or documented in this report.
DOCUMENTS REVIEWED
71111.04: Equipment Alignment
Notification
50971726
Procedures
Number
Title
Revision
OP B-2:I
RHR System Alignment Verification for Plant Startup
OP D-1:II
Auxiliary Feedwater System - Alignment Verification for
Plant Startup
35B
OP J-6B:II
Diesel Generator 1-2 Make Available
OP J-6B:II-A
Diesel Generator 1-2 Alignment Checklist
71111.05: Fire Protection
Notifications
50951216
50873874
51003161
50994906
51000222
51000220
50382707
51008312
50654888
Procedure
Number
Title
Revision
OM8.ID4
Control of Flammable and Combustible Materials
Drawings
Number
Description
Revision
RA-15/16
Fire Drawing: Radiological Control Area & H Block Elev 100
Unit 2
RA-21/122
Fire Drawing: Radiological Control Area & H Block Elev 128 3
TB-14/16
Fire Drawing: Turbine Building Elev 85 Unit 2
TB-17/18
Fire Drawing: Turbine Building Elev 104 Units 1 and 2
71111.07: Heat Sink Performance
Procedure
Number
Title
Revision
MA1.ID22
Heat Exchanger Program
2B
71111.11: Licensed Operator Requalification Program and Licensed Operator
Performance
Procedures
Number
Title
Revision
JSIM-507
Evaluator Skills
OP AP-7
Degraded Condenser
OP B-1A:V
CVCS-Transfer Charging Pump
OP B-1A:XII
CVCS-Letdown System Establish Normal Letdown or
Change Flow
23A
TQ2.DC3
Licensed Operator Continuing Training Program
71111.12: Maintenance Effectiveness
Notifications
50998429
50998368
50998381
50998387
51000350
Procedures
Number
Title
Revision
AD9.DC2
Receipt Inspection and Acceptance Testing
7C
AD9.ID11
Supplier Evaluation Process
AD9.ID7
Receipt Inspection and Acceptance Testing
CF3.ID13
Replacement Part Evaluation and CITE
CF3.ID9
Design Change Notice
CF5.ID2
Control of Material in Storage
MA1.ID17
Maintenance Rule Monitoring Program
QCP 10.1
Receipt Inspection Program
QCP 10.2
Inspection Activities
QCP 10.22
Supplemental Verification Activities at Receipt
Drawing
Description
NCR-DC0-89-EN-N020
Other
Number
Description
Revision
DCM C-17
Hosgri Response Spectra
DCM S-3B
DCM T-6
Seismic Analysis
71111.13: Maintenance Risk Assessments and Emergent Work Control
Notification
5100915
Procedures
Number
Title
Revision
AD7.DC6
On-line Risk Management
AD7.ID14
Assessment of Integrated Risk
AD7.ID17
PRA Significant Component Management
OP O-36
Protected Equipment Postings
71111.15: Operability Determinations and Functionality Assessments
Notifications
51000174
50849449
51004042
51004045
51002982
51004043
51004046
51004041
51004044
51000614
51000651
51000637
51006288
51006426
Procedures
Number
Title
Revision
MP E-64.6A
Maintenance of ABB K-Line Circuit Breakers
45A
OM7.ID12
OP1.DC1
Administrative Program to Control the Return to Power After
2A
71111.19: Post-Maintenance Testing
Notifications
50992181
50992059
50954695
51000794
50823903
51004429
510004946
Work Orders
60112923
64197366
280662
206785
201570
64009658
64168537
Procedures
Number
Title
Revision
MP E-8.1
Centrifugal Charging Pump Motor Overhaul
MP I-1.4-6A
Hagan Remote/Manual Setpoint Station Acceptance Test
Procedure
MP M-17.9
Auxiliary Saltwater Pump Maintenance
OP H-1:1
Auxiliary Building Safeguards Ventilation (ABVS)
OP J-6B:IV
Manual Operations Emergency Diesel DG 1-1
STP M-21-RTS.1 Return Diesel Engine to Service Following Outage
Maintenance
STP M-4
Routine Surveillance Test of Auxiliary Building Safeguard Air
Filtration System
STP M-9A2
Diesel Emergency Generator Routine Surveillance Test
STP P-ASW-A21 Comprehensive Test of Auxiliary Saltwater Pump 2-1
STP V-2J3
Outside Containment Residual Heat Removal Isolation
Valves
STP V-3M2B
Exercising Valve RHR-HCV-637 RHR Heat Exchanger
Outlet Valve
Drawing
Number
Description
Revision
107710
Unit 2 Residual Heat Removal, Sheet 2
71111.22: Surveillance Testing
Notification
50971726
Work Orders
64197339
64198600
64198607
64181211
Procedures
Number
Title
Revision
CAP C-19:III
Boron Analysis
CAP E-1:IV
CVCS Influent Sampling
STP P-AFW-II
Routine Surveillance Testing of Turbine Driven AFW Pump
1-1
36B
STP R-1A
Exercising Full Length Control Rods
STP V-3R5
Exercising Steam Supply to AFW Stop Valve FCV-95
71114.01: Exercise Evaluation
Notifications
50877640
50877653
50880123
50880313
50881252
50904604
50934778
50935077
50946337
50946792
50955206
50959031
50959988
50967652
50981316
50982804
50986147
50993706
50997229
50997501
51002249
51002269
51002277
51002279
51002283
51002294
51002308
51002310
51002313
51002456
51002761
51002781
51002782
51002784
51002787
51002789
51002812
51003090
Procedures
Number
Title
Revision
EOP F-0
Critical Safety Function Status Trees
EP EF-1
Activation and Operation of the Technical Support Center,
August 27, 2018
EP EF-2
Activation and Operation of the Operational Support Center,
January 18, 2017
EP EF-3
Activation and Operation of the Emergency Operations
Facility, October 18, 2018
EP G-1
Emergency Classification and Emergency Plan Activation,
August 27, 2018
EP G-3
Emergency Notification of Offsite Agencies, August 27, 2018 60
EP G-4
Assembly and Accountability, January 19, 2017
EP G-5
Evacuation of Non-Essential Personnel, October 22, 2018
EP R-2
Release of Airborne Radioactive Materials Initial
Assessment, August 27, 2018
EP RB-10
Protective Action Recommendations, August 27, 2018
EP RB-17
Operating Instructions for Quickdose, August 27, 2018
EP RB-2
Emergency Exposure Guide, February 7, 2011
EP RB-3
Stable Iodine Thyroid Blocking, October 11, 2016
EP RB-8
Instructions for Field Monitoring Teams, March 12, 2018
Other
Number
Description
Date
Diablo Canyon Nuclear Power Plant Emergency Plan
September
2018
EP G-2,
11
Shift Phone Talker Checklist
August 6,
2018
EP G-3,
Instructions for Making Notification Phone Calls
August 14,
2018
71114.04: Emergency Action Level and Emergency Plan Changes
Notifications
50962681
50994795
Procedures
Number
Title
Revision
EP EF-1
Activation and Operation of the Technical Support Center
TS3.ID2
Licensing Basis Impact Evaluations, June 27, 2017
Other
Number
Description
Revision /
Date
Emergency Plan Section 1 (Revision 4.08) and Appendix
A (Revision 4.08)
June 13, 2018
Emergency Plan Section 4 (Revision 4.17) and Section 6
(Revision 4.19), Appendices D (Revisions 5.01 and 5.02),
F (Revision 4.06), and G (Revision 4.02)
September 26,
2018
Emergency Plan Section 6 (Revision 4.18) and Section 7
(Revision 4.21)
May 17, 2018
EP-CALC-DCPP-
1602
Containment Radiation EAL Threshold Values
PG&E Letter DCL-
18-010
Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL-
DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-26,
Materials License No. SNM-2511; Diablo Canyon
Independent Spent Fuel Storage Installation; Emergency
Plan Implementing Procedure Update
February 26,
2018
PG&E Letter DCL-
18-029
Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL-
DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-26,
Materials License No. SNM-2511; Diablo Canyon
Independent Spent Fuel Storage Installation; Emergency
Plan Implementing Procedure Update
April 11, 2018
PG&E Letter DCL-
18-041
Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL-
DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-26,
Materials License No. SNM-2511; Diablo Canyon
Independent Spent Fuel Storage Installation; Emergency
Plan and Emergency Plan Implementing Procedure
Update
May 17, 2018
PG&E Letter DCL-
18-044
Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL-
DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-26,
Materials License No. SNM-2511; Diablo Canyon
Independent Spent Fuel Storage Installation; Emergency
Plan Update
June 13, 2018
Other
Number
Description
Revision /
Date
PG&E Letter DCL-
18-056
Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL-
DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-26,
Materials License No. SNM-2511; Diablo Canyon
Independent Spent Fuel Storage Installation; Emergency
Plan Implementing Procedure Update
July 25, 2018
PG&E Letter DCL-
18-063
Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL-
DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-26,
Materials License No. SNM-2511; Diablo Canyon
Independent Spent Fuel Storage Installation; Emergency
Plan Implementing Procedure Update
August 23,
2018
PG&E Letter DCL-
18-074
Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL-
DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-26,
Materials License No. SNM-2511; Diablo Canyon
Independent Spent Fuel Storage Installation; Emergency
Plan Update
September 26,
2018
PG&E Letter DCL-
18-082
Docket No. 50-275, OL-DPR-80; Docket No. 50-323, OL-
DPR-82; Diablo Canyon Units 1 and 2; Docket No. 72-26,
Materials License No. SNM-2511; Diablo Canyon
Independent Spent Fuel Storage Installation; Emergency
Plan Implementing Procedure Update
October 15,
2018
Tracking Number:
2018-02
Update the Low Population Zone (LPZ) Definition
February 19,
2018
Tracking Number:
2018-09
Revise E-Plan Sections 7.1.1.3 and 7.1.4.3
March 7, 2018
Tracking Number:
2018-10
Revise E-Plan Sections 6.6.2.1, 6.6.2.2, and 6.6.7
March 7, 2018
Tracking Number:
2018-12
Revise E-Plan Section 7.7.8
March 7, 2018
Tracking Number:
2018-34
Document Conversion of DCL-16-099 Attachment 3 into
Emergency Plan Appendix D Format
June 18, 2018
Tracking Number:
2018-40
Changes Made to CS1.3 and CG1.2
July 10, 2018
Tracking Number:
2018-50
Document the Changes to Emergency Plan Appendix F
Rev. 4.06
June 9, 2018
Tracking Number:
2018-61
Add a HEPA Filter on the TSC Normal Ventilation System
and a Radiation Shield Assembly
July 17, 2018
Tracking Number:
2018-75
Update RM-14/14R Table R-1 Values
August 9,
2018
71114.06: Drill Evaluation
Procedures
Number
Title
Revision
EOP E-O
Reactor Trip or Safety Injection
R18-3
Simulator Event Sequence
TQ2.DC3
Licensed Operator Training Program
71151: Performance Indicator Verification
Notifications
50948620
50949924
50950208
50955950
50956892
50960063
50964200
50966964
50971951
50973193
50975431
50977094
50985644
50987750
50987962
50990683
50990684
Procedures
Number
Title
Revision
AWP EP-001
Emergency Preparedness Performance Indicators, April 24,
2017
AWP O-001
NRC Performance Indicators: RCS Specific Activity
CAP D-6
Specific Activity Determination in Liquid Samples
CY2.ID1
Radioactive Effluent Controls Program
EP G-1
Emergency Classification and Emergency Plan Activation
43, 44, 45
EP G-3
Emergency Notification of Offsite Agencies
58, 59, 60
EP MT-43
Early Warning System Testing and Maintenance, May 15,
2018
EP RB-10
Protective Action Recommendations
20, 21
STP R.10C
Reactor Coolant System Water Inventory Balance
XI1.ID5
Collection and Submittal of NRC Performance Indicators
Other
Number
Description
Revision /
Date
Diablo Canyon Power Plant Alert and Notification System
Design Report, Early Warning System, Revision 4
July 2016
RCS Dose Equivalent Iodine Quarterly Reports
Performance
Indicator
Program 2017
and 2018
RCS Leakage Cycle 21 Data Units 1 and 2
January 16,
2017 through
November 13,
2018
DEPI PEG-08
Drill and Exercise Performance Indicator (DEPI)
Performance Evaluation Guide (PEG)
Lesson Plan:
Lesson Plan:
ECA00-A
Loss of All AC
Lesson Plan:
R176S4
EAL Evaluations
1A
71153: Follow-up of Events and Notices of Enforcement Discretion
Notifications
51007073
51007071
51006634
51003229
51002995
50996028
50996398
51006869
51006288
Procedures
Number
Title
Revision
OM7.ID1
Problem Identification and Resolution
OP1.DC1
Administrative Program to Control the Return to Power After
2A
OP1.DC31
Dissemination of Operations Information
Request for Information for
Resident Inspection at
Diablo Canyon Power Plant -
4th Quarter 2018
Please provide the following documents (use date range of document request unless
otherwise noted):
1. Summary listing of all root and apparent cause evaluations performed on this system
2. Summary listing of all condition reports written on this system, sorted by category type
3. Summary listing of OE screening and dispositioning reviews
4. Summary listing of all corrective maintenance work orders, with description of work,
performed on this system
5. List of all work orders, with description of work, planned within the next 6 months (from
start of applicable quarter).
6. List of maintenance rule functional failure assessments - regardless of the result -
performed on this system for previous two years. Include condition report numbers for
each item on the list
7. Summary list of system design calculations
8. Summary list of fire impairments associated with this system
9. List of completed engineering changes and planned engineering changes (within the
next six months of start of applicable quarter) associated with this system.
10. Schedule of system surveillance and work activities for the planned quarter of interest.
11. Summary listing of temporary and permanent modifications associated with the system
completed within the last two years
2. Summary listing of 50.59 screenings and evaluations related to the system
13. Maintenance rule scoping and basis documents
14. Maintenance rule expert panel meeting minutes for meetings related to system
15. Current UA hours and UR data tracking documents (system health report)
4th Quarter 2018
System: Auxiliary Feedwater
IMS Upload Date Requested By: September 25, 2018
Date Range of Document Request: October 1, 2016 - Current
SUNSI Review
ADAMS:
Non-Publicly Available
Non-Sensitive
Keyword:
By: MSH
Yes No
Publicly Available
Sensitive
OFFICE
SRI:DRP/A
RI:DRP/A
C:DRS/EB1
C:DRS/EB2
C:DRS/OB
C:DRS/PSB2
NAME
CNewport
JReynoso
VGaddy
JDrake
GWerner
HGepford
SIGNATURE
/RA/
/RA/
/RA/
/RA/
/RA/
/RA/
DATE
01/16/19
01/16/19
01/16/19
01/16/19
01/21/19
01/17/19
OFFICE
C:DRS/IPAT
SPE:DRP/A
BC:DRP/A
NAME
RKellar
RAlexander
MHaire
SIGNATURE
/RA/
/RA/
/RA/
DATE
01/16/19
01/22/19
01/28/19