MONTHYEARIR 05000275/20230042024-02-0909 February 2024 Integrated Inspection Report 05000275/2023004 and 05000323/2023004 IR 05000275/20230112024-01-12012 January 2024 NRC License Renewal Phase 1 Inspection Report 05000275/2023011 IR 05000275/20230032023-11-13013 November 2023 Integrated Inspection Report 05000275/2023003 and 05000323/2023003 IR 05000275/20240152023-10-10010 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (050002752024015 and 050003232024015) IR 05000275/20243012023-08-24024 August 2023 Notification of NRC Initial Operator Licensing Examination 05000275/2024301; 05000323/2024301 IR 05000275/20230052023-08-22022 August 2023 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2023005 and 05000323/2023005) - Mid Cycle Letter IR 05000275/20230022023-08-14014 August 2023 Quarterly Integrated Inspection Report 05000275/2023002 and 05000323/2023002- August 7, 2023 IR 05000275/20213012023-08-0909 August 2023 Errata for Diablo Canyon Power Plant, Units 1 and 2 - NRC Examination Report 050002752021301 and 050003232021301 IR 05000275/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000275/2023402, and 05000323/2023402 IR 05000275/20233012023-07-25025 July 2023 NRC Initial Operator Licensing Examination Approval 05000275/2023301, 05000323/2023301 IR 05000275/20230102023-05-11011 May 2023 NRC Inspection Report 05000275 2023010 and 05000323 2023010 IR 05000275/20230012023-05-0909 May 2023 Integrated Inspection Report 05000275/2023001 and 05000323/2023001 IR 05000275/20234032023-03-10010 March 2023 NRC Security Baseline Inspection Report 05000275/2023403, 05000323/2023403 (Full Report) IR 05000275/20220062023-03-0101 March 2023 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2022006 and 05000323/2022006) IR 05000275/20220042023-02-0202 February 2023 Integrated Inspection Report 05000275/2022004 and 05000323/2022004 IR 05000275/20220102023-01-27027 January 2023 Biennial Problem Identification and Resolution Inspection Report 05000275/2022010 and 05000323/2022010 IR 05000275/20224022022-10-26026 October 2022 Security Baseline Inspection Report 05000275/2022402 and 05000323/ 2022402 IR 05000275/20220032022-10-24024 October 2022 Integrated Inspection Report 05000275/2022003 and 05000323/2022003 and Exercise of Enforcement Discretion IR 05000275/20220052022-08-23023 August 2022 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2022005 and 05000323/2022005) IR 05000275/20220022022-08-10010 August 2022 Integrated Inspection Report 05000275/2022002 and 05000323/2022002 IR 05000275/20220112022-08-0909 August 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000275/2022011 and 05000323/2022011 IR 05000275/20224012022-08-0303 August 2022 NRC Security Inspection Report 05000275/2022401, 05000323/2022401 ML22143A8812022-05-26026 May 2022 Revised Integrated Inspection Report 05000275/2022001 and 05000323/2022001 ML22118A9362022-05-0505 May 2022 Integrated Inspection Report 05000275/2022001 and 05000323/2022001 IR 05000275/20220012022-05-0505 May 2022 Integrated Inspection Report 05000275/2022001 and 05000323/2022001 IR 05000323/20214202022-03-31031 March 2022 Security Inspection Report 05000275 and 05000323/2021420 IR 05000275/20210062022-03-0202 March 2022 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2021006 and 05000323/2021006) IR 05000275/20210042022-02-0303 February 2022 Integrated Inspection Report 05000275/2021004 and 05000323/2021004 IR 05000275/20214042022-01-13013 January 2022 Public - Security Baseline Inspection Report 05000275/2021404 and 05000323/2021404 IR 05000275/20210032021-11-0303 November 2021 Integrated Inspection Report 05000275/2021003 and 05000323/2021003 IR 05000275/20210112021-09-10010 September 2021 Design Basis Assurance Inspection (Programs) Report 05000275/2021011 and 05000323/2021011 IR 05000275/20214052021-08-0505 August 2021 Security Baseline Inspection Report 05000275/2021405 and 05000323/2021405 IR 07200026/20214012021-08-0303 August 2021 Diablo Canon Nuclear Power Plant, Security Baseline Inspection Report 07200026/2021401 IR 05000275/20210022021-08-0202 August 2021 Integrated Inspection Report 05000275/2021002 and 05000323/2021002 IR 05000275/20210122021-07-28028 July 2021 Temporary Instruction 2515/194 Report 05000275/2021012 and 05000323/2021012 IR 05000275/20214012021-07-0101 July 2021 Security Baseline Inspection Report 05000275/2021401 and 05000323/2021401 IR 05000275/20210012021-05-0707 May 2021 DC IR 2021-001-drk, Diablo Canyon Power Plant Units 1 & 2 - Integrated Inspection Report 05000275/2021001, 05000323/2021001, & Independent Spent Fuel Storage Installation Inspection Report 07200026/2021001 DCL-21-036, One Hundred Eighty Day Steam Generator Report for Diablo Canyon Power Plant Unit 1 Twenty-Second Refueling Outage2021-04-22022 April 2021 One Hundred Eighty Day Steam Generator Report for Diablo Canyon Power Plant Unit 1 Twenty-Second Refueling Outage ML21102A0702021-04-12012 April 2021 Notification of NRC Design Bases Assurance Inspection (Programs) (05000275/2021011 and 05000323/2021011) and Initial Request for Information IR 05000275/20214032021-03-31031 March 2021 Cyber Security Inspection Report 05000275/2021403 and 05000323/2021403 IR 05000275/20210102021-03-11011 March 2021 Triennial Fire Protection Inspection Report 05000275/2021010 and 05000323/2021010 IR 05000275/20200062021-03-0303 March 2021 DC 2020 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 & 2 (Report 05000275/2020006 & 05000323/2020006) IR 05000275/20200042021-01-26026 January 2021 Integrated Inspection Report 05000275/2020004 and 05000323/2020004 IR 05000275/20204112020-12-22022 December 2020 Security Baseline Inspection Report 05000275/2020411 and 05000323/2020411 IR 05000275/20204102020-12-15015 December 2020 NRC Security Inspection Report 05000275/2020410 and 05000323/2020410 IR 05000275/20200102020-10-30030 October 2020 Biennial Problem Identification and Resolution Inspection Report 05000275/2020010 and 05000323/2020010 IR 05000275/20200032020-10-29029 October 2020 Integrated Inspection Report 05000275/2020003 and 05000323/2020003 IR 05000275/20200052020-09-0101 September 2020 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2020005 and 05000323/2020005) IR 05000275/20200022020-07-22022 July 2020 Integrated Inspection Report 05000275/2020002 and 05000323/2020002 IR 05000275/20200012020-04-16016 April 2020 Integrated Inspection Report 05000275/2020001 and 05000323/2020001 2024-02-09
[Table view] Category:Letter
MONTHYEARIR 05000275/20230042024-02-0909 February 2024 Integrated Inspection Report 05000275/2023004 and 05000323/2023004 ML24002B1802024-01-29029 January 2024 LRA Audit Plan DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel ML24018A0152024-01-29029 January 2024 License Renewal Application Review Schedule Letter ML24017A2492024-01-24024 January 2024 Letter to Neil Peyron, Chairman, Tule River Tribe, Re. Diablo Canyon ML24024A1752024-01-24024 January 2024 Letter to Tribal Council San Luis Obispo County Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24003A8902024-01-24024 January 2024 Letter to P. Gerfen - Diablo Canyon Notice of Intent to Conduct Scoping and Prepare an Environmental Impact Statement ML24012A1582024-01-24024 January 2024 Letter to Hon. Violet Sage Walker, Chairwoman Northern Chumash Tribal Council on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0062024-01-24024 January 2024 Achp Scoping Letter for Diablo Canyon License Renewal ML24012A0552024-01-24024 January 2024 Letter to J. Polanco, Shpo, on Request to Initiate Section 106 Consultation and Scooping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1562024-01-24024 January 2024 Letter to Hon. Gabe Frausto, Coastal Band of Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1652024-01-24024 January 2024 Letter to Hon. Mona Olivas Tucker, Yak Tityu Tityu Yak Tilhini Northern Chumas Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1612024-01-24024 January 2024 Letter Hon. Gary Pierce, Salian Tribe of Monterey and San Luis Obispo Counties on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0362024-01-24024 January 2024 Request to Initiate Section 106 Consultation and Scoping Process for the Environmental Review License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000275/20230112024-01-12012 January 2024 NRC License Renewal Phase 1 Inspection Report 05000275/2023011 DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel ML23326A0122023-12-21021 December 2023 12-21-23 Letter to the Honorable Byron Donalds from Chair Hanson Responds to Letter Regarding 2.206 Petition to Close Diablo Canyon Nuclear Power Plant, Unit 1 ML23341A0042023-12-19019 December 2023 LRA Acceptance Letter ML23352A2342023-12-18018 December 2023 Notification of Age-Related Degradation Inspection (05000275/2024014 and 05000323/2024014) and Request for Information DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update ML23355A0952023-12-0808 December 2023 License Renewal Application Online Reference Portal DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 ML23291A2702023-11-28028 November 2023 Letter to Nakia Zavalla, Shpo, the Santa Ynez Band of Chumash Indians; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23320A2442023-11-28028 November 2023 Letter to Kerri Vera, Director of Department of Environmental Protection, Tule River Tribe; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23325A1382023-11-27027 November 2023 ISFSI Tribal Letter to San Luis Obispo County Chumash Indians ML23325A1322023-11-27027 November 2023 ISFSI Tribal Letter to Salian Tribe of Montgomery, San Luis Obispo ML23325A1332023-11-27027 November 2023 ISFSI Tribal Letter to Yak Tityu Tityu Northern Chumash Indians ML23307A0062023-11-27027 November 2023 ISFSI Tribal Letter to Northern Chumash Tribal Council ML24003A7242023-11-27027 November 2023 Independent Safety Committee; Diab Lo Canyon Nuclear Power Plant Operations, Thirty-Third Annual Report on the Safety ML23325A1292023-11-27027 November 2023 ISFSI Tribal Letter to Coastal Band of Chumash ML23320A1502023-11-17017 November 2023 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, & Opportunity for Hearing (Exigent Circumstances) (EPID L-2023-LLA-0155) - LTR DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System ML23296A0982023-11-15015 November 2023 Notification and Request for Consultation Regarding Pacific Gas and Electric Diablo Canyon Independent Spent Fuel Storage Installation Material License Renewal Request (Docket Number: 72-26) DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML23293A1052023-11-14014 November 2023 Receipt and Availability of License Renewal Application IR 05000275/20230032023-11-13013 November 2023 Integrated Inspection Report 05000275/2023003 and 05000323/2023003 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application ML23318A2102023-10-31031 October 2023 Independent Safety Committee; Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System IR 05000275/20240152023-10-10010 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (050002752024015 and 050003232024015) 2024-02-09
[Table view] |
Text
ber 26, 2018
SUBJECT:
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC SECURITY BASELINE INSPECTION REPORT 05000275/2018403 and 05000323/2018403
Dear Mr. James Welsch:
On November 8, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Diablo Canyon Power Plant, Units 1 and 2. The NRC inspectors discussed the results of this inspection with Mr. J. Nimick, Senior Director Engineering, Technical and Emergency Services, and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter, and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
If you choose to provide a response to this report that contains Security-Related Information, please mark your entire response Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390 (d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
James R. Larsen, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos.: 50-275 and 50-323 License Nos.: Nos. DPR-80 and DPR-82
Enclosure:
NRC Inspection Report 05000275/2018403 and 05000323/2018403
Inspection Report
Docket Numbers: 50-275 and 50-323 License Numbers: DPR-80 and DPR-82 Report Numbers: 05000275/2018403 and 05000323/2018403 Enterprise Identifier: I-2018-403-0001 Licensee: Pacific Gas and Electric Company Facility: Diablo Canyon Power Plant, Units 1 and 2 Location: Avila Beach, California Inspection Dates: November 5 - 8, 2018 Inspectors: C. Newport, Senior Resident Inspector J. Buchanan, Physical Security Inspector Approved By: James R. Larsen Chief, Plant Support Branch 1 Division of Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Baseline Security Inspection at Diablo Canyon Power Plant, Units and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
NRC-Identified
and self-revealed findings, violations, and additional items are summarized in the table below.
List of Findings and Violations No findings or violations of more than minor significance were identified during the inspection.
Additional Tracking Items No Additional Items
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, "Security Inspection Program for Commercial Nuclear Power Reactors." The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.02 - Access Control
Main article: IP 71130.02
The inspectors evaluated the access control program. The following elements were evaluated:
Tier I: all requirements Tier II: all requirements Tier III: all requirements
71130.14 - Review of Power Reactor Target Sets
Main article: IP 71130.14
Review of Events and Logs (1 Sample, Section 02.01)
The inspectors reviewed licensee event reports, safeguards log entries, and corrective action program entries since the last inspection that concern the target set identification and development program.
Target Set Identification and Development Process Review (6 Samples, Section 02.02)
The inspectors assessed the licensee's documentation and maintenance of the process used to develop and identify complete and accurate target sets as required by 10 CFR Part 73 by reviewing applicable portions of procedures and samples of records and conducting interviews with responsible personnel and plant employees.
Verification of Target Sets Changes (1 Sample, Section 02.03)
The inspectors reviewed changes to the licensees documented target sets since the last inspection. The inspectors verified that any design modifications and procedure or configuration changes that have occurred were appropriately documented in target sets.
Verification of Complete and Accurate Target Sets (2 Samples, Section 02.04)
The inspectors interviewed licensee personnel, reviewed a sample of target sets for reactor operation and for modes other than operation, and walked down applicable portions of the target sets. The inspectors reviewed assumptions used in the licensees development of its target sets.
Physical Protection Program Review (1 Sample, Section 02.05)
The inspectors verified that the licensee performed a review of target sets for accuracy, completeness, and applicability at least every 24 months and as otherwise required, documented the results and recommendations, and entered findings in the site corrective action program.
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification
The inspectors verified licensee performance indicator submittals listed below for the period from October 2017 through September 2018.
- (1) Protected Area Security Equipment Performance Index.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
On November 8, 2018, the inspectors presented the Baseline Security Inspection results to Mr. J. Nimick, Senior Director Engineering, Technical and Emergency Services, and other members of the licensee staff. The inspectors verified no proprietary information was retained or documented in this report.
DOCUMENTS REVIEWED
71130.02 - Access Control
Notifications
50838143 50878495 50924082 50937114 50941164
50950549 50951399 50951972 50954812 50956779
50948971 50957255 50957577 50959703 50962227
50964616 50972372 50974689 50978618 50984527
50987377 50987668 50991859 50993635 50992511
50993247 50997003 50997004 51001873 51003705
51003714 51003807 51003808
Security Incident Reports
2018-000248
Procedures Revision
Number Title or Date
SP 401 Security Access Control and Personnel Identification 48
SP 402 Intake Protected Area Access Control 17
SP 402A Independent Spent Fuel Storage Installation Protected 6
Area Access Control
SP 405 Incoming Package and Material Control 40/41
SP 407 Protected Area Vehicle Control 26
SP 412 Visitor Check-in and Log-out Process 40
SP 418 Hand Geometry System 9
SP 501 Lock and Key Control 21
Miscellaneous
Documents Revision
Number Title or Date
N/A 2018 Security Audit FileNet #173460008 8/14/18
N/A Diablo Canyon Nuclear Power Plant, Physical Security 13
Plan
N/A Pre-Inspection Self-Assessment; 71130.02 Access 10/16/18
Control
71130.14 - Review of Power Reactor Target Sets
Notifications
50842230 50873170 50892547 50901263 50905255
50912935 50942192 50944029 50944070 50946087
50946844 50946846 50974580 50975707 50975708
50976555 50982924 50982926 50985630 50989141
50995717 50997352 50998366 50999400
Security Incident Reports
2017-000255 2017-000268 2017-000401 2018-000070 2018-000105
Procedures Revision
Number Title
AWP SP-007 Critical Digital Asset Determination 5
OM11.ID6 Target Set Identification, Development, and 4
Maintenance Program (10CFR2.390)
OM11.ID7 Safety/Security Interface Program 1A
CS1.ID1 Cyber Security Assessment Team (CSAT) 0
Miscellaneous
Documents Revision
Number Title
N/A Diablo Canyon Nuclear Power Plant, Physical Security 13
Plan
71151 - Performance Indicator Verification
Security Incident Reports
2018-000058 2018-000059 2018-000064 2018-000067 2018-000095
2018-000110 2018-000113 2018-000180 2018-000181 2018-000187
2018-000191 2018-000205 2018-000210 2018-000214 2018-000219
2018-000222 2018-000230 2018-000231 2018-000236 2018-000239
2018-000249
Procedures Revision
Number Title
AWP 5-0001 Security Data for Nuclear Regulatory Commission 6
Performance Indicators
XI1-DC1 Collection and Submittal of NRC Performance Indicators 12A
Miscellaneous
Documents
Number Title or Date
N/A Protected Area Performance Indicators CY 2017
N/A Protected Area Performance Indicators CY 2018
N/A Safeguards Event Log CY 2018
ML18330A296
SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: JLB Yes No Publicly Available Sensitive NRC-002
OFFICE PSI:PSB1 SRI:PSB1 C:PSB1 C:PBA C:PSB1
NAME JBuchanan CNewport JLarsen MHaire JLarsen
SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/
DATE 11/14/18 11/14/18 11/19/18 11/19/18 11/26/18