IR 05000275/2018403

From kanterella
Jump to navigation Jump to search
NRC Security Baseline Inspection Report 05000275/2018403 and 05000323/2018403
ML18330A296
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/26/2018
From: Jim Larsen
Plant Support Branch-1
To: Welsch J
Pacific Gas & Electric Co
References
IR 2018403
Download: ML18330A296 (9)


Text

November 26, 2018

SUBJECT:

DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC SECURITY BASELINE INSPECTION REPORT 05000275/2018403 and 05000323/2018403

Dear Mr. James Welsch:

On November 8, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Diablo Canyon Power Plant, Units 1 and 2. The NRC inspectors discussed the results of this inspection with Mr. J. Nimick, Senior Director Engineering, Technical and Emergency Services, and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

If you choose to provide a response to this report that contains Security-Related Information, please mark your entire response Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390 (d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

James R. Larsen, Chief

Plant Support Branch 1

Division of Reactor Safety

Docket Nos.: 50-275 and 50-323 License Nos.: Nos. DPR-80 and DPR-82

Enclosure:

NRC Inspection Report 05000275/2018403 and 05000323/2018403

Inspection Report

Docket Numbers:

50-275 and 50-323

License Numbers:

DPR-80 and DPR-82

Report Numbers:

05000275/2018403 and 05000323/2018403

Enterprise Identifier:

I-2018-403-0001

Licensee:

Pacific Gas and Electric Company

Facility:

Diablo Canyon Power Plant, Units 1 and 2

Location:

Avila Beach, California

Inspection Dates:

November 5 - 8, 2018

Inspectors:

C. Newport, Senior Resident Inspector

J. Buchanan, Physical Security Inspector

Approved By:

James R. Larsen

Chief, Plant Support Branch 1

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Baseline Security Inspection at Diablo Canyon Power Plant, Units and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

NRC-Identified

and self-revealed findings, violations, and additional items are summarized in the table below.

List of Findings and Violations

No findings or violations of more than minor significance were identified during the inspection.

Additional Tracking Items

No Additional Items

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, "Security Inspection Program for Commercial Nuclear Power Reactors." The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program. The following elements were evaluated:

Tier I: all requirements Tier II: all requirements Tier III: all requirements

71130.14 - Review of Power Reactor Target Sets

Review of Events and Logs (1 Sample, Section 02.01)

The inspectors reviewed licensee event reports, safeguards log entries, and corrective action program entries since the last inspection that concern the target set identification and development program.

Target Set Identification and Development Process Review (6 Samples, Section 02.02)

The inspectors assessed the licensee's documentation and maintenance of the process used to develop and identify complete and accurate target sets as required by 10 CFR Part 73 by reviewing applicable portions of procedures and samples of records and conducting interviews with responsible personnel and plant employees.

Verification of Target Sets Changes (1 Sample, Section 02.03)

The inspectors reviewed changes to the licensees documented target sets since the last inspection. The inspectors verified that any design modifications and procedure or configuration changes that have occurred were appropriately documented in target sets.

Verification of Complete and Accurate Target Sets (2 Samples, Section 02.04)

The inspectors interviewed licensee personnel, reviewed a sample of target sets for reactor operation and for modes other than operation, and walked down applicable portions of the target sets. The inspectors reviewed assumptions used in the licensees development of its target sets.

Physical Protection Program Review (1 Sample, Section 02.05)

The inspectors verified that the licensee performed a review of target sets for accuracy, completeness, and applicability at least every 24 months and as otherwise required, documented the results and recommendations, and entered findings in the site corrective action program.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicator submittals listed below for the period from October 2017 through September 2018.

(1) Protected Area Security Equipment Performance Index.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

On November 8, 2018, the inspectors presented the Baseline Security Inspection results to Mr. J. Nimick, Senior Director Engineering, Technical and Emergency Services, and other members of the licensee staff. The inspectors verified no proprietary information was retained or documented in this report.

DOCUMENTS REVIEWED

71130.02 - Access Control

Notifications

50838143

50878495

50924082

50937114

50941164

50950549

50951399

50951972

50954812

50956779

50948971

50957255

50957577

50959703

50962227

50964616

50972372

50974689

50978618

50984527

50987377

50987668

50991859

50993635

50992511

50993247

50997003

50997004

51001873

51003705

51003714

51003807

51003808

Security Incident Reports

2018-000248

Procedures

Number

Title

Revision

or Date

SP 401

Security Access Control and Personnel Identification

SP 402

Intake Protected Area Access Control

SP 402A

Independent Spent Fuel Storage Installation Protected

Area Access Control

SP 405

Incoming Package and Material Control

40/41

SP 407

Protected Area Vehicle Control

SP 412

Visitor Check-in and Log-out Process

SP 418

Hand Geometry System

SP 501

Lock and Key Control

Miscellaneous

Documents

Number

Title

Revision

or Date

N/A

2018 Security Audit FileNet #173460008

8/14/18

N/A

Diablo Canyon Nuclear Power Plant, Physical Security

Plan

N/A

Pre-Inspection Self-Assessment; 71130.02 Access

Control

10/16/18

71130.14 - Review of Power Reactor Target Sets

Notifications

50842230

50873170

50892547

50901263

50905255

50912935

50942192

50944029

50944070

50946087

50946844

50946846

50974580

50975707

50975708

50976555

50982924

50982926

50985630

50989141

50995717

50997352

50998366

50999400

Security Incident Reports

2017-000255

2017-000268

2017-000401

2018-000070

2018-000105

Procedures

Number

Title

Revision

AWP SP-007

Critical Digital Asset Determination

OM11.ID6

Target Set Identification, Development, and

Maintenance Program (10CFR2.390)

OM11.ID7

Safety/Security Interface Program

1A

CS1.ID1

Cyber Security Assessment Team (CSAT)

Miscellaneous

Documents

Number

Title

Revision

N/A

Diablo Canyon Nuclear Power Plant, Physical Security

Plan

71151 - Performance Indicator Verification

Security Incident Reports

2018-000058

2018-000059

2018-000064

2018-000067

2018-000095

2018-000110

2018-000113

2018-000180

2018-000181

2018-000187

2018-000191

2018-000205

2018-000210

2018-000214

2018-000219

2018-000222

2018-000230

2018-000231

2018-000236

2018-000239

2018-000249

Procedures

Number

Title

Revision

AWP 5-0001

Security Data for Nuclear Regulatory Commission

Performance Indicators

XI1-DC1

Collection and Submittal of NRC Performance Indicators 12A

Miscellaneous

Documents

Number

Title

or Date

N/A

Protected Area Performance Indicators

CY 2017

N/A

Protected Area Performance Indicators

CY 2018

N/A

Safeguards Event Log

CY 2018

ML18330A296

SUNSI Review

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

By: JLB

Yes No

Publicly Available

Sensitive

NRC-002

OFFICE

PSI:PSB1

SRI:PSB1

C:PSB1

C:PBA

C:PSB1

NAME

JBuchanan

CNewport

JLarsen

MHaire

JLarsen

SIGNATURE

/RA/

/RA/

/RA/

/RA/

/RA/

DATE

11/14/18

11/14/18

11/19/18

11/19/18

11/26/18