Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/98-06 & 50-323/98-06 Issued on 980414.Tactical Response Capabilities Will Be Reviewed During Future Insp
ML16342E106
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/02/1998
From: Murray B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
References
50-275-98-06, 50-275-98-6, 50-323-98-06, 50-323-98-6, NUDOCS 9806040406
Download: ML16342E106 (12)


Text

CATEGORY 2 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9806040406 DOC.DATE: 98/06/02 NOTARIZED: NO DOCKET AUTH.NAME FACZL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific Ga 05000275 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga 05000323 AUTHOR AFFILIATION MURKILY,B.

Region 4 (Post 820201)

RECIP.NAME

-"'.RECIPIENT AFFILIATION RUEGER,G.M.

Pacific Gas 8 Electric Co.

SUBJECT: Ack receipt of 980514 ltr informing NRC of steps taken to correct violations noted in insp repts 50-275/98-06

50-323/98-06 issued on 980414.Tactical response capabilities will be reviewed during future insp.

DISTRIBUTION CODE: IE04D COPIES RECEIVED: LTR /

ENCL SIZE:

TITLE: Safeguards Inspection Rpt/NOV Response M(

0 DKT)-Publicly Ava lable NOTES:

RECIPIENT ID CODE/NAME PD4-2 PD ZNTERNAL: ACRS NRR/DRPM/PE RB NUDOCS-ABSTRACT RGN4 FZLE

COPIES LTTR ENCL

1

1

1

1

1 RECZP IENT ID CODE/NAME BLOOM,S FILE CENTE OCS FULLTEXT OE DIR Cg&Z.ES LTTR ENCL

.1

1 1,

1

0 R

TERNAL: NOAC

1 NRC PDR

1 D

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR

ENCL

p

k III

~R RECII~

~G

"o

+

+c n

C O

C O~

Cy

~O

+>>*<<+

UKITEOSTATES NUCLEAR REGULATORY COMMISSION

SUBJECT:

RESPONSE TO NRC INSPECTION REPORT 50-275/98-06; 50-323/9846

Dear Mr. Rueger.

Thank you for your letter of May 14, 1998, in response to our April 14, 1998, letter which I

requested confirmation of your commitment to ensure that the performance demonstrated during lII the September 1996 Operational Safeguards Response Evaluation willbe maintained.

We have reviewed your reply and find it responsive to our concerns.

We willreview your tactical response capabilities during a future inspection.

Sincerely,

'PV INAui Blaine Murray, Chief Plant Support Branch Division of Reactor Safety Docket Nos.: 50-275; 50-323 License Nos.: DPR-80; DPR-82 CC:

Dr. Richard Ferguson Energy Chair Sierra Club California 1100 lith Street, Suite 311 Sacramento, California 95814 9806040466 980602 PDR ADOCK 05000275

PDR

I

-2-Pacific Gas and Electric Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, California 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408 Mr. Truman BurnsWlr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm. 4102 San Francisco, California 94102 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P.O. Box 942732 Sacramento, California 94234 Christopher J. Warner, Esq.

Pacific Gas and Electric Company P.O. Box 7442 San Francisco, California 94120 Robert P. Powers, Vice President and Plant Manager Diablo Canyon Power Plant P.O. Box 56 Avila Beach, California 93424 Managing Editor Telegram-Tribune 1321 Johnson Avenue P.O. Box 112 San Luis Obispo, California 93406 Robert R. Wellington, Esq.

Legal Counsel Diablo Canyon Independent Safety Committee 857 Cass Street, Suite D Monterey, California 93940

Pacific Gas and Electric D

DCD (IE04)

Regional Administrator Diablo Canyon Resident Inspector DRS Director DRS Deputy Director DRP Director DRS-PSB Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

~ WCFO File MIS System RIV File-3-DOCUMENT NAME: R:h DC>DC806AK.TWD To receive cop of document, indicate in box: "C""-Cop without enctosures

"E" = Cop with enciosures "N"~ No cop RIV:PSB E

TWDexter:nh 06/f /98 C:DRStiPSB BMurray

98 OFFICIALRECORD COPY

Pacific Gas and Electric e'

DST B

CSMIF5X)P Regional Administrator Diablo Canyon Resident Inspector DRS Director DRS Deputy Director DRP Director DRS-PSB Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File MIS System RIVFile-3-DOCUMENT NAME: R:5 DC(DC806AK.TWD To receive co ot document, Ind!cate in box: "C" = Cop without enctosures

"E" = Cop with enctosures "N"~ No cop RIV:PSB E

TWDexternh 06/J/98 C:DRS>PSB BMurray

98 OFFICIALRECORD COPY

REGULATORY SERVICES ID'805545504i HUH Oi'98 8429 N0.001 P.02 Pacific Gas arttt Sectile Conqrany Diabto Canyon Paver Plant P.O. Box 56 Avita Beach. CA93424 805/545%NO Robert P. Pottrers Yice PresMent-Diablo Qazz Operations and Plant tlhna'ger May 14, 1998-PGB E Letter DCL-95472 U.S. Nuclear Regulatory Commission ATTN: Document Control Bask Washington, DQ 20555 Docket No. 50-275, OL-DPR<0 Docket No. 50-323, OL-DPR42 Diablo Canyon Units 1 and 2 NRC s ection Re 0-5/S ~ 50D 3/9846 P

sica Securit P o ram

Dear Commissioners and Staff:

ln the above inspection report, the NRC requested PGSE confirm a regulatory commitment to ensure that the performance demonstrated during the September 1996 Operational Safeguards Response Evaluation (OSRE) be maintained.

This letter provides the commitment confirmation 'and clarification.

Diablo Canyon Power Plant (DCPP) has reviewed the current tactical response plan, Subsequent to the OSRE, modified exercises were conducted to validate that an effective tactical response capability has been maintained.

Through testing and drill exercises, lt was determined that DCPP has maintained tactical response capabilities as demonstrated and tested during the OSRE.

To ensure that consistent application of the tactical response plan is maintained, PG&E has issued additional guidelines on staffing for tactical responses.

Any significant change to the tactical response plan willbe validated prior to implementation, Additionally, any changes that affect the security plan willbe reviewed under the criteria of 10 CFR 50.54(p) and submitted to the NRC for approval as required.

Robert P. Powers cc:

Steven D. Bloom Blaine Murray David L Praulx WEC/2246