IR 05000275/1998010

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-275/98-10 & 50-323/98-10 on 980510-0620 & NOV Re Failure to Follow Maint Procedure Resulting in Performing Maint on Incorrect Auxiliary Feedwater Pump
ML16343A597
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/17/1998
From: Wong H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342E179 List:
References
50-275-98-10, 50-323-98-10, NUDOCS 9807270004
Download: ML16343A597 (10)


Text

CATEGORY 2 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

"I ACCESSION NBR:9807270004 DOC.DATE: 98/07/17 NOTARIZED: NO DOCKET

~

~

~

FACIL:50-275 Diablo Canyon Nuclear -Power Plant, Unit 1, Pacific Ga 05000275 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga 05000323 AUTH.NAME AUTHOR AFFILIATION WONG,H.J.

Region 4 (Post 820201)

RECIP.NAME RECIPIENT AFFILIATION RUEGER,G.M.

Pacific Gas

&. Electric Co.

SUBJECT:

Forwards insp repts 50-275/98-10

& 50-323/98-10 on 980510-0620 Sc NOV'.

DISTRIBUTION CODE: IEOIF COPIES RECEIVED:LTR 3 ENCLi SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS AEOD MENTER DRPM/WE B NUDOCS -ABSTRACT OGC/HDS3 TERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL

1

2

1

1

1

1

1

1'

RECIPIENT ID CODE/NAME BLOOM,S AEOD/SPD/RAB DEDRO NRR/DRCH/HOHB NRR/DRPM/PERB OE DIR RGN4 FILE

NOAC NUDOCS FULLTEXT COPIES LTTR ENCL

1

1

1

1

1

1

1

1

1 D

ILOADeo~0M NRC FLOPPY E

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.

TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRZBUTZON LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083

\\

TOTAL NUMBER OF COPIES REQUIRED:

LTTR

ENCL

~Pg ASCII~

(4 lp O~

I Cj

P+/p +>>*++

UNITEDSTATES NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

SUBJECT:

NRC INSPECTION REPORT 50-275/98-10; 50-323/98-10 AND NOTICE OF VIOLATION

Dear Mr. Rueger:

From May 10 through June 20, 1998, a routine inspection was conducted at your Diablo Canyon Nuclear Power Plant, Units 1 and 2 reactor facilities. The enclosed report presents the scope and results of that inspection.

During the 6-week period covered by this inspection report, your conduct of activities at the Diablo Canyon Nuclear Power Plant facilitywas generally characterized by safety-conscious operations, generally sound engineering and maintenance practices, and good radiation protection support.

Based on the results of this inspection, one violation of NRC requirements was identified. This violation involved your staffs identification of the failure to follow a maintenance procedure resulting in performing maintenance on an incorrect auxiliary feedwater pump.

Removing oil from the wrong pump resulted in two auxiliary feedwater pumps being inoperable simultaneously, which was a potentially risk significant configuration. This violation is not being considered for enforcement discretion because of the inadequate immediate actions by your staff upon discovery.

Those actions were inadequate in that personnel failed to notify the control room in a timely manner so that action could be taken to prevent automatic start of the turbine-driven auxiliary feedwater pump, and personnel continued to work on the wrong component without work authorization or a clearance.

The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances surrounding the violation are described in detail in the enclosed report. The NRC has concluded that information regarding the reason for the violation, the corrective actions taken and planned to correct the violation and prevent recurrence is already adequately addressed in this inspection report. Therefore, you are not required to respond to this letter unless the.

description therein does not accurately reflect your corrective actions or your position.

In that case, or ifyou choose to provide additional information, you should followthe instructions in the enclosed Notice.

9807270004 980717 PDR ADGCK 05000275

PDR

~5 c/

Pacific Gas and Electric Company-2-In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its enclosures, and your response willbe placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we willbe pleased to discuss them with you.

)

Sincerely,

-.- Howard J: Wong,.Chief-.----

Reactor Project Branch E Division of Reactor Projects Docket Nos.

50-275 50-323 License Nos.: DPR-80 DPR-82 Enclosures:

1.

Notice of Violation 2.

NRC Inspection Report 50-275/98-10; 50-323/98-10 cc w/enclosures:

Dr. Richard Ferguson Energy Chair Sierra Club California 1100 11th Street, Suite 311 Sacramento, California 95814 Ms. Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, California 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, California 93408

Pacific Gas and Electric Company-3-Mr. Truman Burns>Mr. Robert Kinosian California Public Utilities Commission 505 Van Ness, Rm. 4102 San Francisco, California 94102 Robert R. Wellington, Esq.

Legal Counsel Diablo Canyon Independent Safety Committee 857 Cass Street, Suite D Monterey, California 93940 Mr. Steve Hsu Radiologic Health Branch State Department of Health Services P.O. Box 942732 Sacramento, California 94234 Christopher J. Warner, Esq, Pacific Gas and Electric Company P.O. Box 7442 San Francisco, California 94120 Robert P. Powers, Vice President and Plant Manager Diablo Canyon Power Plant P.O. Box 56 Avila Beach, California 93424 Managing Editor Telegram-Tribune 1321 Johnson Avenue P.O. Box 112 San Luis Obispo, California 93406

Pacific Gas and Electric Company E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator DRP Director Branch Chief (DRP/E, WCFO)

Senior Project Inspector (DRP/E, WCFO)

Branch Chief (DRP/TSS)

WCFO File Resident Inspector DRS-PSB MIS System RIV File DOCUMENT NAME: R:i DC810RP.DLP To receive cop of document, Indicate In box: "C"-"Cop without enclosures

"E" = Copy with enclosures "N" = No cop RIV:SRI:DRP/E DLProulx:jb*

07/ /98 C:DRP/E MJWong 07/

OFFICIALRECORD COPY

  • concurred in previous revision (unavailable to review final version)

Ci <'

ma rt.gw c'e'c

~4 ow

/t ) /ppO'M