Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-275/91-29 & 50-323/91-29.Concurs C/A Described in Paragraph A.3 of Ltr
ML16342C282
Person / Time
Site: Diablo Canyon  
Issue date: 02/03/1992
From: Yuhas G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 9202110165
Download: ML16342C282 (4)


Text

UNITED STATES NUCLEAR REGULATORYCOMMISSION

REGION V

1450 MARIALANE WALNUTCREEK, CALIFORNIA94596-5368 fQ m $ $9UR Docket Nos.

50-275 and 50-323 Pacific Gas and Electric Company 77 Beale Street, Room 1451 San Francisco, California 94106 Attention:

Mr. G.'.

Rueger, Senior Vice President Nuclear Power Generation Thank you for your letter dated December 30, 1991, in r'esponse to our Notice of Violation (Notice) and Inspection Repor't 50-275/91-29 and 50-323/91-29, informing us of the steps you have taken to correct the items we brought to your attention.

In your response you state that you believe the exemption expressed in 10 CFR 20. 203(f)(3)(vii ) applies= and that you should not have been required to label the High Integrity Container (HIC) identified in violation A. 1 of our Notice.

Since the HIC was not attached to the resin transfer system at the time of the observation and was located outside the auxiliary building at the 115 foot level in a radioactive material, storage area, we do not agree the exemption would be applicable.

Me concur with the corrective actions described in paragraph A.3 of your December 30, 1991, letter.

Your corrective actions will be verified during a future inspection.

Should you have any questions regarding this matter, we would be glad to discuss them with you.

Your cooperation with us is appreciated.

Sincerely, Q. P.

G.

P.

as, Chief Reactor Radi ol ogi cal Protection Branch 92021i01b5 920203 PDR ADOCK 05000275 Q

PDR i LQ(p

Docket Nos.

50-275 and 50-323 Pacific Gas and Electric Company 77 Beale Street, Room 1451 San Francisco, California 94106

'ttention:

Mr.

G.

M. Ruegei, Senior Vice President Nuclear Power Generation Thank you for your letter dated December 30,- 1991, in response to our Notice of Violation (Notice) and Inspection Report 50-275/91-29 and 50-323/91-29,'nforming us of the steps you have taken to correct the items we brought to your attention.

I'n your response you state that you believe the exemption expressed in, 10 CFR-20.203(f)(3)(vii) applies and that you should not have been required to label the High Integrity Container (HIC) identified in violation A. 1 of our Notice, Since the HIC was not attached to the resin transfer system at the time of the observation and was located outside the auxiliary building at the 115 foot level in a radioactive material storage area, we do not agree the exemption would be applicable.

We concur with the corrective actions described in paragraph A.3 of your December 30, 1991, letter.

Your corrective actions will be verified during a future inspection.,

N Should you have any questions regarding this matter, we would be glad to discuss them with you..

Your cooperation with us is appreciated.

Sincerely, G.

P.

Yuhas, Chief Reactor Radiological Protection Branch bcc w/copy of letter dated December 30, 1991:

Docket File Resident Inspector Project Inspector G.

Cook B. Faulkenberry J. Martin bcc w/o copy of letter dated December 30, 1991:

M. Smith J. Zollicoffer MCilli"r GYuhas a /s /i-~

</-" 8 YE

/

NO

]

E

/

NO

]

E

/

NO ]