Insp Repts 50-275/91-35 & 50-323/91-35 on 911015-18.No Violations Noted.Major Areas Inspected:Licensee Implementation of Program for Conducting Periodic Evaluations of Public Health & Safety Issues
ML16341G354
Person / Time
Site: Diablo Canyon  
Issue date: 10/31/1991
From: Chaney H, Yuhas G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML16341G353 List:
References
50-275-91-35, 50-323-91-35, NUDOCS 9111200153
Download: ML16341G354 (6)


Text

U.S.

NUCLEAR REGULATORY COMMISSION

REGION V

Report Nos.:

50-275/91-35 and 50-323/91-35 License Nos.:

DPR-80 and DPR-82 Licensee:

Pacific Gas 8 Electric Company San Francisco, California 94106 Facility Name:

Diablo Canyon Power Plant (DCPP) Units

8

Inspection at:

DCPP site, San Luis Obispo County, California Inspection Conducted:

October 15-18, 1991 Inspected by:

ney, endor a

a son pecaa as o

Pffft a

e agne Approved by:

a,

>e, Reactor iological Protection Branch

~Summer:

Los(R a

e

>gne Areas Ins ected:

A special unannounced inspection to determine if the licensee as implemented a program for conducting periodic evaluations of public health and safety issues resulting from changes in population distribution, or industrial, military, and transportation hazards on or near reactor sites.

NRC Temporary Instruction 2515/112 was used.

Results:

The licensee's formal program for the annual evaluation of each part

'oOO~e inal Safety Analysis Report Update (FSARU) is considered satisfactory.

In addition, licensee managers are extensively involved (due to the licensee's formal "Governmental

- Key Contact" program) in local community activities.

No anomalies in the descriptions presented in Chapter 2 of the FSARU and the surrounding environs were. identified.

91 1 12001 e3 91 1031 PDR ADOCK 05000m~75 G

PDR

~

'

DETAILS 1.

Persons

.Contacted:

2.

Licensee

"J.

Townsend, Vice President, Plant Operations

"M. Rapp, Chairman, On-site Review Group

"D. Taggart, Director, Quality Performance and Assessment

"D. Mikt ush, Manager, Operations Services

~J.

Shoulders, NECS On-site Project Engineer

"R. Flohaug, Sr. Supervisor, Quality Assurance (QA)

"D. Oatley, Manager, Support Services

"T. Grebel, Supervisor, Regulatory Compliance

"B. Giffin, Manager, Maintenance Services

"M. Angus, Manager, Technical Services

~K. Dinnel, QA Auditor

  • R. Grey, Director, Radiation Protection Section

"M. Somervi lie, Sr.

Engineer, Radiation Protection Section

  • J. Boots, Director, Cfiemistry Section
  • R. Kohout, Director, Safety/Health

Emergency Services

~M. Barkhuff, Director, Quality Control

  • J. Griffin, Sr.

Engineer, Regulatory Compliance C. Voss, Supervisor, Automotive and Land Services J. Marrick, Supervising Biologist C. Miller, Engineer, Radiation Protection and Radwaste

  • Denotes personnel that were at the exit meeting held on October 18, 1991.

Additional licensee personnel were contacted during the inspection and are not reflected in the above listing.

Near Site Environmental Chan es The licensee owns or controls all property (excluding coastal waters)

within a radius of approximately 2 miles of Diablo Canyon Power Plant (DCPP).

DCPP is somewhat protected by a mountain range that effectively separates it from any non-PG8E commercial activities.

The licensee's programs for monitoring and documenting changes in the environs sur rounding the licensee's facility were examined.

The following licensee documents were examined:

Nuclear Plant Administrative Procedures (NPAP) A-30/NPG-4.4, R-l,

"Final Safety Analysis Report (FSAR) Update Change Requests."

NPAP A-31/NPG-4.8, R-l, "The Annual Final Safety Analysis Report Update Revision."

Chapter 2 of the DCPP Safety Analysis Report, dated October 16, 1974.

Chapter 2 of the DCPP Units 1

2 FSAR Update.

PG8E's Los Padres Division, "Governmental - Key Contact - Program Overview, 1991 ~"

~

'

'i i-2-Memorandum From:

Technical and Ecological Services; To: Nuclear Operations Support; Subject:

Land Use Census, dated October 3, 1990.

Nonconformance Report Nos.

DC0-87-TN-N028, Subject:

Propane. Storage Tank, dated March 27, 1987.

In addition to the annual DCPP Technical Specification 3. 12. 1/4. 12.2 required land use census (encompassing the sixteen meteorological sectors within five miles of DCPP), the licensee is actively involved in the full-time control of their coastal properties.

Cattle grazing and agricultural activities are conducted on a portion of the licensee's property located southeast of DCPP.

The inspector 'determined that the licensee's gA Department routinely reviews design changes for agreement with the descriptions contained in the FSARU.

The inspector noted that during a 1987 audit (86259T) of a design change package dealing with the Auxiliary Saltwater System (ASW),

gA engineers identified that a propane storage tank (for the site cafeteria)

was installed in proximity to electrical conduit boxes associated with the ASW.

The propane tank had been installed without the initiation of a design change notice or a safety evaluation being made.

Corrective actions included the removal of the propane tank and creation of a procedure providing guidance on siting and modification of plant facilities.

8ased on a physical survey of areas surrounding DCPP the NRC inspector determined that Chapter 2 of the current FSARU accurately reflects the populations and hazardous conditions surrounding DCPP.

The licensee's methods appear to be adequate for the evaluation of public health and safety issues resulting from changes in population distribution or in industrial, military, or transportation hazards that could occur in or around DCPP.

3.

~Fit N

t.i The inspectors met with the licensee representatives identified in Section l.of this report on October 18, 1991.

The scope and findings of this inspection were discussed.