Forwards Insp Repts 50-275/89-14 & 50-323/89-14 on 890423-0603.No Violations Noted
ML16342C226
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/19/1989
From: Mendonca M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16341F224 List:
References
NUDOCS 8907070247
Download: ML16342C226 (6)


Text

gc CPLKRA,TED D)ST'%BUD ON DKMON STRA,T10N SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:.8907070247 DOC.DATE: 89/06/19 NOTARIZED: NO DOCKET I ACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific Ga 05000275 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga 05000323 AUTH.NAME'UTHOR AFFILIATION MENDONCA,M.M.

Region 5, Ofc of the Director RECIP.NAME

, RECIPIENT AFFILIATION SHIFFER,J.D.

Pacific Gas

& Electric Co.

SUBJECT: Forwards Insp Repts 50-275/89-14 6 50-323/89-14 on 890423-0603.No violations noted.

DISTRIBUTION CODE:

IEOID COPIES RECEIVED:LTR i ENCL I SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

RECIPIENT ID CODE/NAME PD5 PD INTERNAL: ACRS AEOD/DE1IB DEDRO NRR/DEST DIR NRR/DOEA DIR 11 NRR/DREP/RPB

NUDOCS-ABSTRACT OGC/HDS2 RES MORISSEAUED TERNAL: LPDR NSIC COPIES LTTR ENCL

1

2

1

1

1

1

2

1

1

1

1

1 RECIPIENT ID CODE/NAME ROOD,H AEOD AEOD/TPAD NRR SHANKMAN,S NRR/DLPQ/PEB NRR/DREP/EPB

NRR/PMAS/ILRB12 OE LIEBERMANgJ RE(~0&~

0 2 RGN5 FILE

NRC PDR COPIES LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1 h

NOZE IO ALL RIDS" RECIECEPIS:

PIZASE HELP US 'IO REDUCE HASTE.'XÃjlRCZ '%HE DOCQKÃ1'XKI'.RDLDESK, RXN Pl-37 (EXT. 20079) m ELXMZNAXBVDUR MMB HKH DIPI%GBIOTICH LISTS FOR DXXMENTS VXJ DGNIT NEEDf D

S TOTAL NUMBER OF COPIES REQUIRED:

LTTR

ENCL 25,

~ '

~gS RELY(

Cy no Cy

+4**+

Docket Nos.

50-275 an UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION V

1460 MARIALANE, SUITE 210 WALNUTCREEK, CALIFORNIASl696-6368 JUN i g igeg d 50 323 Pacific Gas and Electric Company 77 Beale Street, Room 1451 San Francisco, California 94106 Attention:

Mr. J. -D. Shiffer, Vice President Nuclear Power Generation Gentlemen:

Subject:

NRC Inspection of Diablo Canyon Units 1 and 2 This refers to'he routine inspection conducted by Mr. K. E. Johnston during the period of April 23, 1989 through June 3, 1989.

The report also documents a meeting with Quality Assurance personnel on June 13, 1989.

This inspection examined your activities as authorized by NRC License Nos.

DPR-80 and DPR-82.

At the conclusion of the inspection, discussions on June 16, 1989 of the inspection findings were held with Mr. J.

D. Townsend, and other members of your staff.

Areas examined during this inspection are described in the enclosed inspection report.

Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observ'ations by the inspectors.

No violations of NRC requirements were identified within the scope of this inspection.

In accordance with 10 CFR 2.790 (a),

a copy of this letter and the enclosures will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, 8907070247 8906%9 PDR ADOCK 05000275

f..

M.

M. Mendonca, Acting Chief Reactor Projects Branch

Enclosure:

Inspection Report Nos. 50-275/89-14 and 50-323/89-14

REGION V==

A~/

KEJohnston MMendonca