Text
U.
S.
NUCLEAR REGULATORY COMMISSION REGION V
Report Nos.
50-275/89-11 and 50-323/89-11 Docket Nos.
50-275 and 50-323 License No.
DPR 80 and
Licensee:
Pacific Gas and Electric Company 77 Beale Street Room 1451 San Francisco, California 94106 Facility Name:
Diablo Canyon Nuclear Power Plant Units 1 and
D e
gned
'3l bi Date S gned Meeting at:
Diablo Canyo Site, San Luis Obispo County, California
/~
Meeting Conducted:
March 3,+
89eport Prepared by: J./
.
C ew
, Senior Reactor Inspector (
S.
A. Richards, Chief Engineering Section Approved by:
~summer:
M.
M. Mendonca, Chief ProjectsSection I M.
M. Mendonca, Chief ProjectsSection I Date Signed Date Signed Mana ement Meetin on March
1989 Re ort Nos.
50-275/89-11 and 50-323/89-11)
A management meeting was held on March 3, 1989, to discuss configuration management and system engineering efforts.
~ 903290@35 S903 1 3 PDI~
ADQCK 05000275 PDC
DETAILS 1.
Attendees Pacific Gas and Electric Com an R.
C. Anderson, Manager, Nuclear Engineering and Construction Services B. Lew, Director, Nuclear Regulatory Affairs M. R. Tresler, Project Engineer J.
W. Blakley, Senior Engineer, Nuclear Regulatory Affairs United State Nuclear Re ulator Commission J.
L. Crews, Senior Reactor Engineer M. M. Mendonca, Chief, ProjectsSection I
S. A. Richards, Chief, Engineering Section 2.
~Ni fli The meeting began at approximately 9:30 a.m. in the Region V conference room.
Messrs.
Tresler and Anderson started by presenting a set of slides (attached)
to discuss the licensee's configuration management program (CMP).
Mr. Crews indicated that there was to be a regulatory conference, April 18-20, 1989,. related
.to engineeriag work, which could be useful to the licensee.
Further, Mr. Crews outlined three points that have been of emphasis in this area:
1.
Improved quality of engineering work; 2.
Thorough, documented understanding of design basis; and 3.
Pro-active engineering involvement in the plant operations.
Messrs.
Anderson and Tresler indicated that these points are being addressed not only in the nuclear industry but also in the utility industry as a whole.
Mr. Crews then asked how the licensee planned to address these issues.
Mr. Tresler indicated that assuring a proper relationship between the plant and engineering organizations was a primary concern and to assure a
sound relationship required that engineering resolve plant problems in a timely, comprehensive manner.
Mr. Crews indicated that from current inspection findings the plant/engineering relationship required improvement.
Mr. Tresler indicated that personnel changes of engineering management into the plant engineering organization and the rotation of plant systems engineers and design engineers was serving to improve the understanding and relytionship between the plant and the engineering organizations.
Mr. Tresler then indicated that the design basis documents (DBDs) are established with the plant users in mind; that there were quarterly checkoffs between the system and design engineers that included system walkdowns; and that to date the feedback on the DBDs had been goo Nr. Nendonca indicated that the recent problems with the auxiliary saltwater system (ASW) and component cooling water system (CCW) were not indicative of well managed engineering and plant efforts.
Mr. Tresler responded that the problems came up in 1983 and that an evaluation was being made to address the issues and root causes of the problems.
Nr. Mendonca questioned the verification requirements for CNP, and Nr.
Tresler indicated that the effort was a multi-disciplined effort that followed the INPO guidelines.
The discussions then centered on the slides (attached as previously stated).
Mr. Richards indicated that the li'censee's presentation indicated a great deal of confidence that the design engineers understood and could retrieve the design bases, which was affirmed by Messrs.
Tresler and Anderson.
Mr. Crews requested that the licensee provide a description of their progress and a schedule to implement CMP to completion of the DBDs.
Nr.
Tresler indicated that he would provide this by letter to Region Y in about three weeks.
Messrs.
Lew and Tresler indicated that PGI5E management were committed to a timely, accurate, complete CM NRC/PGS.E MANAGEMENTMEETING REGION V WALNUT CREEK, CA MARCH 3, 1989 AGENDA OPENING REMARKS INTRODUCTORY REMARKS III.
CONFIGURATION MANAGEMENT PROGRAM NRC R.
C. ANDERSON M. R. TRESLER IV.
CLOSING REMARKS NRC
CONFIGURATION MANAGEMENT PROGRAM ORIGIN
~ 1981-1984:
EXTENSIVE UPGRADES
~ INCREASED ATTENTION AND.SENSITIVITYTO CONFIGURATION MANAGEMENT BY NUCLEAR INDUSTRY GROUPS
~ PG&E ACTIONS HAVE PARALLELED INDUSTRY TREND
~ 1985-1987:
GENERAL IMPROVEMENTS REPLACEMENT PARTS, PROCEDURES, AND SAFETY REVIEWS
~ FALL 1987:
CONFIGURATION MANAGEMENT TASK FORCE FORMED
~ 1987:
QA AUDITS/SURVEILLANCES SIMILAR TO NRC'S SSFI AND SSOMI EFFORTS
~ ACTIVE PARTICIPANT IN INDUSTRY FORUMS ADDRESSING THIS ISSUE
~ FORMAL PROGRAM BEGAN IN FALL 1988
CONF IGURATION MANAGEMENT ENHANCEMENT PROGRAM.
~ PROGRAM ENHANCEMENTS TO MAINTAIN PLANT CONFIGURATION AND DESIGN BASES a DESIGN BASES DOCUMENTATION ENHANCEMENT-IMMEDIATEACTION TASK I-DCM REVISION/P REPARATION TASK II m OVERSIGHT AND CONTINUED REVIEW
CONFIGURATION MANAGEMENT PROGRAM ENHANCEMENTS*
~ ISSUE CM POLICY DOCUMENT
~ REVIEW INTERFACE PROCEDURES
~ CONSOL)DATE DESIGN DELEGATIONS
~ IDENTIFY DB FOR CHANGES IN DCNs
~ INCLUDE TEST AND ACCEPTANCE CRITERIA IN DCNs
~ REVIEW OF DCNs BY ALL APPROPRIATE SITE GROUPS
~ IMPROVE INSTRUMENT SETPOINT CONTROL REVIEW SELECTED GENERIC MAINTENANCE PROCEDURES 9 REVIEW SPECIFICATIONS
~ REVIEW VENDOR MANUALS e IMPROVE DESIGN CHANGE STATUS TRACKING
{CONVERT TO PIMS)
- EXCLUDINGDESIGN BASES DOCUMENTATION
INSTRUMENT SETPOINT CONTROL IKC AND ELECTRICAL
~ REVIEW PLANT/ENGINEERING PROCEDURES
~ REVIEW SETPOINT CLASSIFICATION CRITERIA
~ REVISE CLASS I SETPOINTS TO PROVIDE PROCESS VARIABLERANGES e EXPAND ENGINEERING CONTROL TO INCLUDE NON-SAFETY'ELATED SETPOINTS THAT:
-CHALLENGE SAFETY SYSTEMS-AFFECT PLANT AVAILABILITY INCLUDE HVAC SETPOINTS IN IKC SETPOI NT DOCUMENT REVISE SETPOINT DOCUMENT TO INCLUDE SETPOINT SOURCE DB DOCUMENT
CONFIGURATION MANAGEMENT PROGRAM ENHANCEMENTS COMPLETED WORK I988 S
N D
!989 J
F.
M A
M J
J A
S
N D
ISSUE CM POLICY DOCUMENT REVIEW INTERFACE PROCEDURES IDENTIFY DB FOR CHANGES IN DCNS INCLUDE TEST
ACCEPTANCE CRI TER IA IN DCNS REVIEW OF DCNS BY ALL SITE GROUPS
CONFIGURATION MANAGEMENT PROGRAM ENHANCEMENTS l988 l989 REMAINING WORK S
N D
J F
M A
M J
J A
S
N D
CONSOL'IDATE DESIGN DELEGATIONS IMPROVE INSTRUMENT SETPOINT VARIABLE RANGES/PROC/INTERFACE IMPROVE INSTRUMENT SETPOINT CLASSIFICATION/CHALLENGE OF I BY II 5 HVAC REVIEW MAINTENANCE PROCEDURES REVIEW SPECI F ICATIONS REVIEW VENDOR MANUALS IMPROVE DESIGN CHANGE STATUS TRACKING
< PHASE
OF
PHASES
~ DESIGN BASIS DOCUMENT SOURCE REFERENCE GUIDE-Sources of Design Basis Information-Access-Use/Limitations-Coritrolled Document TRAINING-Class Room '- System Engineers-Video Tape SYSTEM ENGINEER/DESIGN ENGINEER MATRIX
DESIGN BASIS DOCUMENT SOURCE REFERENCE GUIDE
~ PURPOSE AND SCOPE
~ Q-LIST
~ DESIGN CRITERIA MEMORANDA
~ CALCULATIONS/ANALYSES o NECS ENGINEERING FILES
~ WESTINGHOUSE DESIGN REQUIREMENTS MISCELLANEOUS CONTROLLED DOCUMENTS
+ DRAWINGS
~ MANUFACTURER'S DOCUMENTS 6 DESIGN CONSIDERATIONS MATRIX e ACCESSING DESIGN BASIS INFORMATION
DESIGN BASES TRAINING SCHEDULE WEEK
LESSONS SUB JECT INSTRUCTOR TDBD1 TDBD2 TDBD3 TDBD4 TDBD5 TDBD6 TDBD7 TDBD8 P IP IN8 HJThailer HELB TPLee AFYV RSBreed ALARA INSTR. CLASS MMeleis DCTateosian 4 KV EQ BDSmith BDSmith INSTR. SETPTS.
DCTateosian
DESIGN BASES TRAINING SCHEDULE WEEK 2 LESSONS SUB JECT INSTRUCTOR TDBD9 TDBD10 TDBD11 TDBD12 TDBD13 F LOODIN6 MISSILES RPHills SLi SISIP WEllis CIVIL/STRUCT.
SBhat tacharya H EAVY LOADS WE I Iis TDBD)4 TDBD15 EQUIP.
SQ MRKhan FIRE PROTECT.
PKao
DESIGN BASES TRAINING GROUPS SCHEDULED
~ SYSTEM ENGINEERS (MARCH 6-17, 1989)
~ START U P EN GINE EBS
~ MECHANICALMAINTENANCEENGINEERS
~ ELECTRICAL MAINTENANCEENGINEERS
~ IS.C MAINTENANCEENGINEERS
~ OTHERS AS APPROPRIATE
DEVELOP WRITERS GUIDE PILOT DCM PROGRAM-Auxiliary Feedwater System-4 kv System (inc. EDG)
-Nuclear Instrumentation Sys.
1989 SCOPE-21 DCMs Scheduled
~ 1990-91 SCOPE-63 DCMs Scheduled TOTAL SCOPE-84 DCMs
DCM ENHANCEMENT WRITERS GUIDE e SCOPE-SAFETY RELATED SYSTEMS/IMPORTANT TO ENVIRONMENTALQUALITY-SYSTEMS WHICH CAN CHALLENGE SAFETY SYSTEMS/IMPACT AVAILABILITY-SAFETY RELATED TOPICAL DESIGN. CONSIDERATIONS
~ METHODOLOGY-PERFORMED BY NECS ENGINEERING-DOCUMENT RETREIVAL AND REVIEW-DOCUMENT DCM PREPARATION-COUPLING DESIGN BASIS TO SOURCE-ASSURE DOCUMENTATION COMPATABILITY-IDENTIFY MISSING INFORMATION/OPEN ITEMS-REVIEW SURVEILLANCE PROCEDURE-P LANT PARTICIPATION-NSSS REVIEW/APPROVAL-COOR DINATION/REVIEW
ENHANCED DESIGN CRITERIA MEMORANDA FORMAT 1.0 INTRODUCTION 1.1 PURPOSE 1.2 FUNCTION 2.0 DESCRIPTION 2.1 BOU N DARIES 2.2 MODE REQUIREMENTS 2.3 INTERFACES 2.4 SCHEMATICS AND DRAWINGS 3.0 LICENSE REQUIREMENTS, CODES AND STANDARDS 4.0 DESIGN BASIS 4. 1 CLASS IF I CATION 4.2 CHEMISTRY AND MATERIALS 4.3 SYSTEM AND MAJOR EQUIPMENT 4.4 NATURAL PHENOMENA REQUIREMENTS 4.6 RELATED DESIGN CRITERIA MEMORANDA 6.0 REFERENCES 5.1 TECHNICAL SP ECIFICATIONS 5.2 FSAR 5.3 SERs 5.4 SURVEILLANCE PROCEDURES 6.5 PLANT SYSTEM DESCRIPTIONS 6.0 DEF INITIONS 7.0 OPEN ITEMS
TYPICAL DCM ENHANCEMENT PROCESS ENGINEERING I
I 3.
IDENTIFY OPEN ITEMS/AR'S I
CLOSE OPEN ITEMS I
I I
I I
REVIEW SURVEILLANCE PROC DOCUMENT COLLECTIONI REVI SE/
I AND I
~ PREPARE RFYIEM I
DCM I
I I
I
,
I Dl SC IPLINE CHIEF CO-ORD ENGR/PE lh APPVL APPVL ISSUE DCM DCPP MESTINGHOUSE ESTABLISH DOCUMENT FILE I
I DCPP I
REVIEW DCM I
I I
I I
QW I
I I
REVIEW I
DCM I
I I
I I
I I
RESOLVE COMMENTS
)
~ CLOSURE OF OPEN ITEMS MAY NOT BE POSSIBLE IN ALL AREAS
PILOT AFW DCM LESSONS LEARNED DB INFORMATION EXISTS
IN NECS ENGINEERING FILES DCM FORMAT IS APPROPRIATE FOR SYSTEM DBD PRESENTATION
~ REVIEWS BY PLANT PERSONNEL BENEF ICIAL
~ PLANT VIEWS ENHANCED DCMs AS BENEFICIAL
~ DESIGN OPEN ITEMS (2 ARs)
-CALCULATIONINCONSISTENCIES {5)
-DCM INCONSISTENCY (1)
e OPERATIONS OPEN ITEMS (4 ARs)
-ISI TESTING {7)
-PLANT SYSTEM DESCRIPTION REVISION (1)
-STP FUNCTIONALITY/OPERABILITY{9)
-STP PUMP TEST REVISION (1)
CONFIGURATION MANAGEMENTPROGRAM SUMMARY
~
MANAGEMENT COMMITMENTAND FUNDING FOR PROGRAM IN PLACE
~
IMPLEMENTATIONOF FINAL PROGRAM WILL EVOLVE BASED UPON PROGRAM RESULTS, INDUSTRY EFFORTS, AND DIRECTION
~
SCHEDULE Ml'LESTONES OF DESIGN BASIS IN DCN P ROGRAMMATIC IMPROVEMENTS COMPLETED IN 1989 3989:
21 DCMs SCHEDULED 1990/1991:
63 DCMs SCHEDULE
~
CONFIGURATION MANAGEMENTTASK FORCE WILL REMAIN ACTIVE:
MONITOR EFFECTIVENESS OF PROGRAM AMD RECOMMEND F.URTHER IMPROVEMENTS STUDY FEASIBILITYAND BENEFIT OF ADDING FUNCTIONAL DESIGN BASIS INFORMATION AT THE COMPONENT LEVEL IN PIMS LEAD A TECHNICAL REVIEW OF A SAMPLE OF OP ERATING P ROCEDU RES
CONFIGURATION MANAGEMENTPROGRAM TASKS COMPLETED TO DATE CONFIGURATION MANAGEMENTPOLICY
~ REVISED PROCEDURE C1 e INCLUDE DEFINITION OF DESIGN BASIS IN DCN I
I i
I
~ INCLUDE TEST AND ACCEPTANCE CRITERIA IN DCN
'I
~ DRAFT WRITERS GUIDE DESIGN BASES DOCUMENT SOURCE REFERENCE GUIDE
~ DRAFT OF THREE PILOT DCMs
~ REVIEW SURVEILLANCE PROCEDURES ASSOCIATED WITH PILOT PROGRAM
~ SYSTEM/DESIGN ENGINEER MATRIX
'
0