Requalification Program Evaluation Repts 50-272/90-21OL & 50-311/90-21OL on 900813.Exam Results:Individual Passed Simulator Portion of Exam & Issued License
ML18095A450
Person / Time
Site: Salem  
Issue date: 08/23/1990
From: Eselgroth P, David Silk
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML18095A449 List:
References
50-272-90-21OL, 50-311-90-21OL, NUDOCS 9009100124
Download: ML18095A450 (3)


Text

.,.,

U.S. NUCLEAR REGULATORY COMMISSION REGION I OPERATOR LICENSING REQUALIFICATION PROGRAM EVALUATION REPORT EXAMINATION REPORT NO /90-2l(OL)

50-311/90-21 ( OL)

FACILITY DOCKET NO /311 FACILITY LICENSE N DPR-70/75 LICENSEE:

Public Service Electric and Gas Company P; 0. Box 236 Hancocks Bridge, New Jersey 08038 FACILITY:

Salem Generating Station, Units 1 and 2 EXAMINATION DATES:

August 13, 1990 CHIEF EXAMINER: ~

11/ ~

'iidM:Silk, Senior Operations Engineer APPROVED BY:

SUMMARY:

Peter Eselgrotn, Operations Bran Section of Reactor Safety c,l :> h,,

~

A simulator retake examination was administered to a reactor operator (RO) who had previously passed the written and walk-through portions of the initial license examinatio The individual passed the simulator portion of the examination and was issued a licens *

9009100124 900825 PDR ADOCK 05000272 V

PNU

  • DETAILS TYPE OF EXAMINATIONS:

Initial EXAMINATION RESULTS:

I I

I I

I I

I I

1. 0 I RO I

SRO I

TOTAL I

I Pass/Fail IPass/Fa i 1 IPass/Fa i 1 I

I I

I

..

I Written I

N/A I

N/A I

N/A I

I I

I I

Simulator I

1/0 I

N/A I

1/0 I

I I

I I

Walk-through I

N/A I

N/A I

N/A I

I I

I I

Overa 11 I

1/0 I

N/A I

1/0 I

I I

I I

CHIEF EXAMINER ON SITE:

David M. Silk, Senior Operations Engineer

..

PRE-EXAMINATION ACTIVITIES:

The reference material requested for this examination consisted only of the Simulator Malfunction Boo Based on the malfunction book, the chief examiner developed and outlined the scenarios in the regional offic A week prior to the administration of the simulator scenarios, the chief examiner visited the licensee's training center and utilized the facility's

  • reference material to document anticipated plant and candidate responses to the proposed malfunction Later in the day, tlie NRC and licensee training personnel dry-ran the scenarios to ensure proper simulator performance and validation of the examinatio Licensee personnel signed a pre-examination security agreement prior to dry-running the scenario.0 GENERIC ISSUES:

There were no operator candidate or simulator deficiencies noted during the performance of two simulator scenario.0 EXIT MEETING:

NRC Personnel:

David Silk, Senior Operations Engineer PSE&G Personnel:

Jim Lloyd, Principal Training Supervisor, Salem Greg Mecchi, Plant Operations Training

\\

,

Appreciation was expressed for the cooperation and support of the licensee's training personnel who were involved in the examination development and administration as well as the two operations personnel that were used to complete a crew compliment in which to examine the retake candidat Based on the performance of two simulator scenarios, the NRC stated that the simulator performed well and that no generic deficiencies on the part of the candidate were observed.