IR 05000266/1997026

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-266/97-26 & 50-301/97-26
ML20217B541
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/19/1998
From: Mccormickbarge
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Patulski S
WISCONSIN ELECTRIC POWER CO.
References
50-266-97-26, 50-301-97-26, NUDOCS 9803260094
Download: ML20217B541 (3)


Text

UNITED STATES

,

  1. ga ta49fo,, NUCLEAR REGULATORY COMMISSION 8 g REGION lll
  • j.

, g 801 WARRENVILLE ROAD

  • \,*****,/

March 19, 1998 Mr. 8. A. Patulski Site Vice President Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 SUBJECT: NOTICE OF VIOL.ATION (NRC INSPECTION REPORT NO. 50-266/97026(DRP);

50-301/97026(DRP))

Dear Mr. Patuiski:

This will acknowledge receipt of your letter dated March 10,1998, in response to our letter dated February 10,1998, transmitting a Notice of Violation associated with inspection Report No. 50-266/97026(DRP); 50-301/97026(DRP). We have reviewed your corrective actions and have no further questions at this time. These corrective actions will be examitied during future inspections.

Sincerely,

/h. U - 0 m y ')

J. W. McCormick-Barger, Chief Reactor Projects Branch 7 ,

Docket No. 50-266 Docket No. 50-301 cc: R. 't. Grigg, President and Chief Operating Officer, WEPCO A. J. Cayla, Plant Manager B. D. Burks, P.E., Director Bureau of Field Operations -

Cheryl L. Parrino, Chairman ()

Wisconsin Public Service Commission State Liaison Officer 9003260094 980319 PDR ADOCK 05000266 G PDR p

hb

>

!

. :s .

M Mr. S. l Site Vice President

- Point Beach Nuclear Plant

- Wisconsin' Electric Power Company .

6610 Nuclear Road l '

Two Rivers, Wisconsin 54241 SUBJECT: ~ NOTICE OF VIOLATION (NRC INSPECTION REPORT NO. 50-266/97026(DRP); -

50-301/97026(DRP))

Dear Mr. Patuiski:

This will acknowledge receipt of your letter dated March 10,1998, in response to our

!

letter dated February 10,1998, transmitting a Notice of Violation associated with inspection Report No. 50-266/97026(DRP); 50-301/97026(DRP). We have reviewed your corrective actions and have no further questions at this time.. These corrective actions will be examined during future inspections.

Sincerely, s/ J. W. McCormick-Barger J. W. McCormick-Barger, Chief Reactor Projects Branch 7 Docket No. 50 266 i Docket No. 50-301 cc: R. R. Grigg, President and Chief Operating Officer, WEPCO A. J. Cayia, Plant Manager B. D. Burks, P.E., Director Bureau of Field Operations Cheryl L Parrino, Chairman Wisconsin Public Service i Commission c State Liaison Officer See Attached Distribution DOCUMENT NAME: G:\poin\ poi 97026.ty -

. To venelse a emov i f this document. Indosto in tie t er "C" = Casy wNhout sumohA mot T" * Copy with auch "N= . No copy OFFICE Rill - 6 Rlil NAME McC-Bargernmo.

DATE 03/A198 W 03/ L /98 OFFICIAL RECORD COPY

__

-i o

6-- Distribution:

Docket File SRI Point Beach PUBLIC IE-01 Rlli Enf. Coordinator A. B. Beach IEO(E-mail)

Deputy RA DRP Project Manager, NRR DRS (2) i

'

Rlli PRR DOCDESK (E-mail)

TSS GREENS I