IR 05000266/1997016
| ML20217N129 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 04/03/1998 |
| From: | Mccormickbarge NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Patulski S WISCONSIN ELECTRIC POWER CO. |
| References | |
| 50-266-97-16, 50-301-97-16, NUDOCS 9804090009 | |
| Download: ML20217N129 (1) | |
Text
!
t-
?
3-F
Mr. S. A. Patulski Site Vice President Point Beach Nuclear Plant 6610 Nuclear Road -
Two Rivers, WI 54241 SUBJECT:
NOTICE OF VIOLATION (NRC INSPECTION REPORT NO. 50-266/97016(DRP);
50-301/97016(DRP))
This will acknowledge receipt of your letters dated November 14,1997, and March 19,
' 1998, in response to our letter dated October 17,1997, transmitting a Notice of Violation associated with inspection Report No. 50-266/97016(DRP); 50-301/97016(DRP). We have reviewed your corrective act$ons and have no further questions at this time. These corrective J
actions will be examined during future inspections.
j O
Sincerely,
/s/J. W. McCormick-Barger J. W. McCormick-Barger, Chief Reactor Projects Branch 7 Docket Nos.: 50-266; 50-301 cc:
R. R. Grigg, President and Chief Operating Officer, WEPCO A. J. Cayia, Plant Manager B. D. Burks, P.E., Director Bureau of Field Operations Cheryl L. Parrino, Ch' airman Wisconsin Public Sepice
'
Commission State Liaison Officerj l ()
Distribution:
Docket File SRI Point Beach PUBLIC IE-01 Rlli Enf. Coordinator A. B. Beach DRP Deputy RA DRS (2)
Project Manager, NRR GREENS Rill PRR TSS DOCUMENT NAME: G:\\poin\\ poi 97016.ty.
.
To enceive e espy of title clocument. Insllcate in the box:"C" = Copy without enclosure "f"= Copy with enclosure *N* = No copy OFFICE lilli l
lt l
NAME-JMcB;dp l Ih)$h -
DATE 04/3 /98 1"
'
s'
0FFICIAL RECORO COPY J
,
9904090009 990403
' PDR ADOCK 05000266 0-PDR
L