IR 05000266/1997017
| ML20236F050 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 06/22/1998 |
| From: | Caldwell J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Grigg R WISCONSIN ELECTRIC POWER CO. |
| References | |
| 50-266-97-17, 50-301-97-17, EA-97-618, NUDOCS 9807020004 | |
| Download: ML20236F050 (2) | |
Text
June 22, 1998
SUBJECT:
REVIEW OF THE RESPONSE TO NOTICE OF VIOLATION FOR POINT BEACH NUCLEAR PLANT (NRC INSPECTION REPORT NO. 50-266/97017(DRP);
L 50-301/97017(DRP))
Dear Mr. Grigg:
' This will acknowledge receipt of your letter dated December 12,1997,'in response to our letter j
dated September 17,1997, transmitting a Notice of Violation associated with inspection Repost i
No. 50 266/97017(DRP); 50-301/97017(DRP).
In your reply, you stated that while not disputing Violation 1, it was your view that the statement
at issue regarding the cross-connecting capability of the Point Beach component cooling water j
. (CCW) system was perhaps incomplete, but it was not inaccurate. We have carefully reviewed j
l
,
your response and the circumstances of this violation and have concluded that the statement Point Beach management made to us both verbally and in writing clearly related to the CCW.
'
- _
. system cross-connect capability through the flow path specified in your abnormal operating
'~
L procedures. Since it was later determined that this flow path was not available, we have
j:
concluded that our characterization of the violation was correct. Mr. John A. Grobe, Director,
'
Division of Reactor Safety, discussed this matter with you. We acknowledge your position that
.
the statement was also incomplete, in that there was another CCW system cross-connect
,
capability beyond that described in your abnormal operating procedures.. We also acknowledge
'
your belief that had it been necessary, the CCW system likely would have been made functional.
!
We have reviewed your corrective actions and have no further questions at this time.' These
,
l corrective actions will be examined during future inspections.
L
Sincerely,
,
j
!.
Original signed by
c James L. Caldwell O
!
Deputy Regional Administrator.
_
Docket No. 50-266 -
Docket No. 50-301
' See Attached Distribution
.
I
' DOCUMENT NAME: G:\\POIN\\ pol 97017.TY
.
d 1. -.
., m. __
.
<c. c.
_.
. v. co
=. _
,c..
OFFICE.
Rlli l6 Rill - _f Rlli l
Rl6 -
&
R)fil/l,
I i
,
NAME JMcB 91M[h JGrothW GGrantGFC, BChytoR M W 'JPMbil 06 %/98 U.
06/k/98
"
DATE 06/I/98- ~
06G /98 06/f /9$) / L
"
- OF:lCIAL RECORD COPY
' kMk S0002M o
_ _ _ _ - _ _ _ _ _ - - _ - _ _ _ - _ - _ _ _ - _ - - _ _
- _ _ _ _ _.
_ _ _ _ _ _ _ _ _ _ _ _ _.
____-_ _
_
= _.
_
l
.;*-
o -. '
L
' -
cc:
S. A. Patulski, Site Vice President M. B. Sellman, Chief Nuclear Officer l
. M. Reddeman, Plant Manager l
l J. H. O'Neill, Jr.
Shaw, Pittman, Potts & Trowbridge L
K. Duveneck, Town Chairman Town of Two Creeks B. D. Burks, P.E., Director
!
Bureau of Field Operations Cheryl L. Parrino, Chairman Wisconsin Public Service Commission S. Jenkins, Electric Division Wisconsin Public Service Commission
)
S: ate Liaison Officer Distribution:
J. Lieberman, OE f
- J. Goldberg, OGC B. Boger, NRR '
CAC (E-Mail)
Project Mgr., NRR C. Paperiello, Rlli J. Caldwell, Rlli B. Clayton, Rlil k
SRI Point Beach l
DRP J
-)
DRS (2)
l RillPRR
PUBLIC IE-01
Docket File f
'
GREENS
' IEO (E-Mail)
DOCDESK (E-Mail)
j
010044
_
_ _ - - _ _ _ _
_ - - _ _
_-
_ - - _
- - - _ - -