V. S. NUCLEAR REGULATORY COMMISSION
REGION III
Reports No. 50-266/88019(ORSS); 50-301/88017(DRSS)
Docket Nos. 50-266; 50-301 License. No. DPR-24; DPR-27 Licensee: Wisconsin Electric Power Company 231 West Michigan Milwaukee, WI 53201 facility Name:
Point Beach Nuclear Plant, Units 1 and 2 Inspection Conducted:
August 29 through September 2 and 6-8, 1988 (on-site)
September 12-22, 1988 (Region III)
Date of Previous Security Inspection:
March 21-31, 1988 Type of Inspection:
Unannounced Routine Security Inspection Inspector:
Mu)
////e[68 I
I TThri stof fer Date D
ysical Security Inspector i
- /* 8 Approved By:
mes reed, Chief Date
.
afeguards Section Inspection Sumary Inspection between August 29 and September 22, 1988, on-site and in-office (Reports No. 50-266/8e019(DR55); No. 50-301/88017(DR55))
Areas Inspected:
Security Plan and Implementing Procedures; Records and Reports; Physical Barriers - Vital Areas; and licensee action on previous inspection findings.
Results:
One of three previous inspection findings was closed.
The remaining two findings which involved management effectiveness and aspects of an intrusion detection system will continue to be monitored.
Two violations were identified during this inspection and are described below:
Physical Barriers - Vital Areas:
A penetration of a Vital Area Barrier had not been protected, listed or evaluated.
Security Plan / Implementation Procedure _s:
Required security plan changes were not made or reported to the Comission.
(Details:
UNCLASSIFIED )
Enelesure Cenuin8 7. 53111O SAyrcv C 3 M N N iCk0500g[