Category:Letter
MONTHYEARIR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 ML24009A2432024-01-25025 January 2024 Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24009A2712024-01-24024 January 2024 Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML23354A0052024-01-0808 January 2024 Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000261/20230032023-11-0707 November 2023 Integrated Inspection Report 05000261 2023003 and 07200060 2023001 ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23235A0552023-08-23023 August 2023 Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) IR 05000261/20230022023-08-0707 August 2023 Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 Cyber Security Inspection Report 05000261/2023402 ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23047A4512023-02-21021 February 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22339A1362022-12-0101 December 2022 2023 Requalification Program Inspection - H.B. Robinson Nuclear Plant ML22322A1322022-11-18018 November 2022 301, NRC Operator License Examination Report & Cover Letter Merged ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000261/20220032022-11-0303 November 2022 Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final IR 05000261/20214042022-08-10010 August 2022 Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 IR 05000261/20220022022-08-0909 August 2022 Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion ML22213A0682022-08-0505 August 2022 Request for Withholding Information from Public Disclosure for H. B. Robinson Steam Electric Plant, Unit 2 ML22193A2122022-08-0404 August 2022 Request of Alternatives to ASME Code Section XI Subsection IWE Requirements for Containment Inspections ML22159A2952022-08-0303 August 2022 Issuance of Amendment No. 271 Regarding Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves IR 05000261/20220112022-07-19019 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 ML22167A1702022-07-14014 July 2022 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22125A1942022-05-12012 May 2022 Request for Withholding Information from Public Disclosure for H.B. Robinson Steam Electric Plant, Unit 2 IR 05000261/20220012022-05-0202 May 2022 Integrated Inspection Report 05000261/2022001 IR 05000261/20224012022-04-19019 April 2022 Security Baseline Inspection Report 05000261/2022401 ML22098A2262022-04-11011 April 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22083A0032022-03-29029 March 2022 Closeout of Bulletin 2012 01, Design Vulnerability in Electric Power System IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) 2024-01-08
[Table view] Category:License-Operator
MONTHYEARML22350A1022022-12-16016 December 2022 301 Exam Administrative Items (Normal release)(ADAMS-2B) IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) ML22031A2542022-01-25025 January 2022 301 Corporate Notification Letter ML21260A1402021-09-15015 September 2021 Operator Licensing Examination Approval 05000261/2021301 ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19252A1532019-09-0909 September 2019 Operator Licensing Examination Approval 05000261/2019301 ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19116A1212019-04-26026 April 2019 301 Retake Exam Administrative Items ADAMS-2D - Normal Release ML19115A3112019-04-25025 April 2019 302 Retake ADAMS-2A Submission Normal Release ML19115A3182019-04-25025 April 2019 302 Retake ADAMS-2B Final Exam Items Normal Release ML19115A3322019-04-25025 April 2019 302 Retake ADAMS-2D Submission Normal Release ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 IR 05000261/20183012018-06-0707 June 2018 NRC Operator License Re-Take Examination Report 05000261/2018301 ML18107A2052018-04-12012 April 2018 Retake Examination Approval Letter 05000261/2018301 ML17354B2702017-12-20020 December 2017 05000261/2017301 as Given SRO Written Exam with References and Key - Delay Release 2 Yrs ML17354B2672017-12-20020 December 2017 05000261/17301 as Given RO Written Exam with References and Key - Delay Release 2 Yrs ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16209A5732016-07-26026 July 2016 Operator Licensing Operating (Retake) Examination Approval Letter 05000261/2016-302 ML16125A0792016-04-27027 April 2016 (14) Robinson 2016-301 General Correspondence ML16124A9382016-04-27027 April 2016 (2) Robinson 2016-301 Draft RO Written Exam ML16124A8182016-04-27027 April 2016 (3) Robinson 2016-301 Draft SRO Written Exam ML16125A0692016-04-27027 April 2016 (12) Robinson 2016-301 Final Administrative JPMs ML16125A0752016-04-27027 April 2016 (15) Robinson 2016-301 Other Documents for Retention ML16125A0742016-04-27027 April 2016 (13) Robinson 2016-301 Post Exam Comments ML16125A0392016-04-27027 April 2016 (10) Robinson 2016-301 Final Simulator Scenarios ML16124A7782016-04-27027 April 2016 (4) Robinson 2016-301 Draft Simulator Scenarios ML16124B0592016-04-27027 April 2016 (7) Robinson 2016-301 Final Administrative Documents ML16124A0872016-04-27027 April 2016 (5) Robinson 2016-301 Draft Simulator and in Plant JPMs ML16125A0812016-04-27027 April 2016 (1) Robinson 2016-301 Draft Administrative Documents ML16125A0662016-04-27027 April 2016 (11) Robinson 2016-301 Final Simulator and in Plant JPMs ML16125A0352016-04-27027 April 2016 (6) Robinson 2016-301 Draft Administrative JPMs ML16061A4572016-03-0101 March 2016 301 SRO As-Given Written Exam ML16061A4532016-03-0101 March 2016 301 RO As-Given Written Exam ML16046A0082016-02-12012 February 2016 Operating Licensing Written Examination Approval 05000261/2016301 RNP-RA/15-0093, Reactor and Senior Reactor Operator Initial Examination Outlines2015-11-0404 November 2015 Reactor and Senior Reactor Operator Initial Examination Outlines ML15258A4712015-09-15015 September 2015 Initial Exam 2011-301 Draft Administrative Documents ML15251A4352015-09-0303 September 2015 Notification of Licensed Operator Initial Examination 05000261/2016301 ML15245A5512015-09-0202 September 2015 Initial Exam 2011-301 Draft Admin Jpm'S ML15245A5862015-09-0202 September 2015 Initial Exam 2011-301 Draft Admin Jpm'S ML15223B3262015-05-21021 May 2015 Initial Exam 2011-301 Draft Sim IN-Plant JPMs ML15224B3952015-05-21021 May 2015 Initial Exam 2011-301 Final Sim IN-Plant JPMs ML15224B4102015-05-21021 May 2015 Initial Exam 2011-301 Final Simulator Scenarios ML15224B4172015-05-21021 May 2015 Initial Exam 2011-301 Draft RO Written Exam ML15224B4192015-05-21021 May 2015 Initial Exam 2011-301 Draft SRO Written Exam ML15245A5612015-05-21021 May 2015 Initial Exam 2011-301 Final Admin Jpm'S ML15167A3672014-10-29029 October 2014 Initial Exam 2014-301 Final Admin Jpm'S ML15167A3712014-10-29029 October 2014 Initial Exam 2014-301 Post Exam Comments 2022-09-23
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML22350A1022022-12-16016 December 2022 301 Exam Administrative Items (Normal release)(ADAMS-2B) IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) ML22031A2542022-01-25025 January 2022 301 Corporate Notification Letter ML21260A1402021-09-15015 September 2021 Operator Licensing Examination Approval 05000261/2021301 ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML19252A1532019-09-0909 September 2019 Operator Licensing Examination Approval 05000261/2019301 RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19116A1212019-04-26026 April 2019 301 Retake Exam Administrative Items ADAMS-2D - Normal Release ML19115A3112019-04-25025 April 2019 302 Retake ADAMS-2A Submission Normal Release ML19115A3182019-04-25025 April 2019 302 Retake ADAMS-2B Final Exam Items Normal Release ML19115A3322019-04-25025 April 2019 302 Retake ADAMS-2D Submission Normal Release IR 05000261/20183012018-06-0707 June 2018 NRC Operator License Re-Take Examination Report 05000261/2018301 ML18107A2052018-04-12012 April 2018 Retake Examination Approval Letter 05000261/2018301 ML17354B2672017-12-20020 December 2017 05000261/17301 as Given RO Written Exam with References and Key - Delay Release 2 Yrs ML17354B2702017-12-20020 December 2017 05000261/2017301 as Given SRO Written Exam with References and Key - Delay Release 2 Yrs ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16125A0792016-04-27027 April 2016 (14) Robinson 2016-301 General Correspondence ML16124A8182016-04-27027 April 2016 (3) Robinson 2016-301 Draft SRO Written Exam ML16124A9382016-04-27027 April 2016 (2) Robinson 2016-301 Draft RO Written Exam ML16125A0352016-04-27027 April 2016 (6) Robinson 2016-301 Draft Administrative JPMs ML16125A0662016-04-27027 April 2016 (11) Robinson 2016-301 Final Simulator and in Plant JPMs ML16125A0812016-04-27027 April 2016 (1) Robinson 2016-301 Draft Administrative Documents ML16124A0872016-04-27027 April 2016 (5) Robinson 2016-301 Draft Simulator and in Plant JPMs ML16124B0592016-04-27027 April 2016 (7) Robinson 2016-301 Final Administrative Documents ML16124A7782016-04-27027 April 2016 (4) Robinson 2016-301 Draft Simulator Scenarios ML16125A0392016-04-27027 April 2016 (10) Robinson 2016-301 Final Simulator Scenarios ML16125A0742016-04-27027 April 2016 (13) Robinson 2016-301 Post Exam Comments ML16125A0752016-04-27027 April 2016 (15) Robinson 2016-301 Other Documents for Retention ML16125A0692016-04-27027 April 2016 (12) Robinson 2016-301 Final Administrative JPMs ML16061A4532016-03-0101 March 2016 301 RO As-Given Written Exam ML16061A4572016-03-0101 March 2016 301 SRO As-Given Written Exam ML16046A0082016-02-12012 February 2016 Operating Licensing Written Examination Approval 05000261/2016301 ML15258A4712015-09-15015 September 2015 Initial Exam 2011-301 Draft Administrative Documents ML15245A5862015-09-0202 September 2015 Initial Exam 2011-301 Draft Admin Jpm'S ML15245A5512015-09-0202 September 2015 Initial Exam 2011-301 Draft Admin Jpm'S ML15224B3952015-05-21021 May 2015 Initial Exam 2011-301 Final Sim IN-Plant JPMs ML15223B3262015-05-21021 May 2015 Initial Exam 2011-301 Draft Sim IN-Plant JPMs ML15245A5612015-05-21021 May 2015 Initial Exam 2011-301 Final Admin Jpm'S ML15224B4192015-05-21021 May 2015 Initial Exam 2011-301 Draft SRO Written Exam ML15224B4172015-05-21021 May 2015 Initial Exam 2011-301 Draft RO Written Exam ML15224B4102015-05-21021 May 2015 Initial Exam 2011-301 Final Simulator Scenarios ML15167A3712014-10-29029 October 2014 Initial Exam 2014-301 Post Exam Comments ML15167A1182014-10-29029 October 2014 Initial Examination 2014-301 Draft RO Written Examination ML15167A3672014-10-29029 October 2014 Initial Exam 2014-301 Final Admin Jpm'S ML15167A3642014-10-29029 October 2014 Initial Exam 2014-301 Final Sim in Plant Jpm'S ML15167A1222014-10-29029 October 2014 Initial Exam 2014-301 Draft SRO Written Examination ML15167A1342014-10-29029 October 2014 Initial Exam 2014-301 Draft Admin Jpm'S ML15167A1372014-10-29029 October 2014 Initial Exam 2014-301 Draft Admin Documents ML15167A1412014-10-29029 October 2014 Initial Exam 2014-301 Draft Simulator Scenarios 2022-09-23
[Table view] |
Text
rch 29, 2007
SUBJECT:
REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS -
H. B. ROBINSON NUCLEAR PLANT 05000261/2007301 (RE-ADMINISTRATION OF WRITTEN EXAM)
Dear Mr. Walt:
In a telephone conversation on March 26, 2007, between Mr. Rick Moore, Sr. Nuclear Operations Training Instructor, and Mr. Mark A. Bates, Sr. Operations Engineer, arrangements were made for the administration of licensing examinations at the Robinson Nuclear Plant during the week of June 11, 2007.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG 1021, Operator Licensing Examination Standards for Power Reactors, Revision 9. The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by March 28, 2007. The written examinations, as well as the supporting reference materials identified in NUREG 1021, ES-201, Attachment 2, Reference Material Guidelines For Initial Licensing Examinations, will be due by May 1, 2007. Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the outlines and examinations before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations, it will be necessary for your staff to provide adequate space and accommodations available on the dates noted above in accordance with NUREG 1021, ES-402, Administering Initial Written Examinations.
Appendix E of NUREG 1021, Policies and Guidelines For Taking NRC Examinations, contains a number of NRC policies and guidelines that will be in effect while the written examinations are being administered.
CP&L 2 This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on June 30, 2009. The public reporting burden for this collection of information is estimated to average 350 hours0.00405 days <br />0.0972 hours <br />5.787037e-4 weeks <br />1.33175e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www/nrc.gov/readingrm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Moore has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Mark A. Bates at (404) 562-4612, (Internet E-mail: mab7@nrc.gov), or me at (404) 562-4607, (Internet E-mail: rch@nrc.gov).
Sincerely,
\\RA\\
Robert C. Haag, Chief Operations Branch Division of Reactor Safety Docket No.: 50-261 License No.: DPR-23 cc: (See next page)
CP&L 3 cc contd:
William G. Noll Beverly Hall, Chief Radiation Director, Site Operations Protection Section Carolina Power & Light Company N. C. Department of Environment, H. B. Robinson Steam Electric Plant Health and Natural Resources Electronic Mail Distribution Electronic Mail Distribution Ernest J. Kapopoulos, Jr. David T. Conley Plant General Manager Associate General Counsel - Legal Dept.
Carolina Power & Light Company Progress Energy Service Company, LLC H. B. Robinson Steam Electric Plant Electronic Mail Distribution Electronic Mail Distribution John H. O'Neill, Jr.
Chris L. Burton, Manager Shaw, Pittman, Potts & Trowbridge Performance Evaluation and 2300 N. Street, NW Regulatory Affairs CPB 9 Washington, DC 20037-1128 Electronic Mail Distribution Chairman of the North Carolina C. T. Baucom, Supervisor Utilities Commission Licensing/Regulatory Programs c/o Sam Watson, Staff Attorney Carolina Power & Light Company Electronic Mail Distribution H. B. Robinson Steam Electric Plant Electronic Mail Distribution Robert P. Gruber Executive Director J. F. Lucas, Manager Public Staff - NCUC Support Services - Nuclear 4326 Mail Service Center Carolina Power & Light Company Raleigh, NC 27699-4326 H. B. Robinson Steam Electric Plant Electronic Mail Distribution Public Service Commission State of South Carolina Henry J. Porter, Director P. O. Box 11649 Div. of Radioactive Waste Mgmt. Columbia, SC 29211 Dept. of Health and Environmental Control Mr. Gregg Ludlam, Training Manager Electronic Mail Distribution H. B. Robinson Steam Electric Plant Unit 2 Progress Energy Carolinas, Inc.
R. Mike Gandy 3581 West Entrance Road Division of Radioactive Waste Mgmt. Hartsville, SC 29550 S. C. Department of Health and Environmental Control Electronic Mail Distribution
ML070890177 OFFICE RII:DRS RII:DRS RII:DRP SIGNATURE MAB7 RCH RXM1 NAME MBates RHaag RMusser DATE 3/28/2007 3/28/2007 3/28/2007 April 5, 2007 April 5, 2007 April 5, 2007 April 5, 2007 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO