IR 05000259/1986026
| ML18031B097 | |
| Person / Time | |
|---|---|
| Site: | 03015165, Browns Ferry |
| Issue date: | 12/12/1986 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | White S TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML18031B098 | List: |
| References | |
| NUDOCS 8612230316 | |
| Preceding documents: |
|
| Download: ML18031B097 (3) | |
Text
Tennessee Valley Authority TN:
Mr. S. A. White Manager of Nuclear Power 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Gentlemen:
~ K~A(,
SUBJECT:
N IN TION REPORT NOS. 50-259/86-26, 50-260/86-26)
50-296/86-26, AND 41-08165-09/86-01 Thank you for your response of October 16, 1986, to our Notices of Yiolation issued on September 16, 1986, concerning.activities conducted at your Browns Ferry and Power Operations Training Center facilities.
We have evaluated your response and found that, it meets the requirements of
CFR 2.201.
We will examine the implementation of your corrective actions during future inspections.
After careful review of the bases for your denial of Item D in the Notice and the additional example of the violation described in Inspection Report
.
No. 50-259/260/296/85-25, we have concluded that we agree with your position that the Technical Specification 6.3.A requirement that procedures be adhered to is
the more appropriate reference for the Notice of Yiolation and we have changed our records accordingly.
A revised Notice of Yiolation is enclosed.
The corrective actions specified in your response are acceptable and no written response to this Notice is required.
The NRC position, with respect to the t
f'nd ngs otherwise remai ns unchanged.
In regard to your claim of licensee identification of the violation, Paragraph 3 of the inspe
'
ction re ort describes why credit for licensee identification is not appropriate in this case.
Your response also appropriately identified that your Technical S
f t
3 D does not address what protective measures are required for high radiation areas in which the intensity of radiation is exactly 1000 peci ica ion millirem
'per hour.
You should therefore take action to ensure that this deficiency in your Technical Specification i s corrected.
We appreciate your cooperation in this matter.
Sincerely, Enclosure:
~
~
~
Revised Notice of violation cc w/encl:
(See page 2)
J.
Nelson Grace Regional Administrator g212 g>122'Bg<pp 050 p>p 03ig 86 o02gq
@gal
~1V c )
r, 0,
Tennessee Valley Authority w/encl:
H.
P.
Pomrehn, Site Director
~ Browns Ferry Nuclear Plant
~
. L. Lewis, Plant Manager R. L. Gridley, Director gNuclear Safety and Licensing
'A.
W. Cantrell, Acting Director Nuclear Engineering
.. J.
May, Site Licensing Manager cc w/encl:
gi.
G. Zech, RII PH.
R. Denton, NRR v
. L. Thompson, NRR P.
M., Taylor, IE v'
B. Hayes, OI
$.
R. Connelly, OIA V. J. Clark, NRR
. Grotenhuis, NRR P. Barr, RII RC Resident Inspector NRC Document Control Desk State of Alabama RI I RII RII RII RII R
RI I
~a~o, Z
RWed langton CHos DCollins JPSt hr
rr GZech GJen ns 11/lq/86 11/(q /86 11//f /86 11~/86 11/~/86 11@ /86 1Q ( /86 11/4(/86