IR 05000259/1986021
ML20212A359 | |
Person / Time | |
---|---|
Site: | Browns Ferry |
Issue date: | 07/18/1986 |
From: | Mcguire D, Thompson D, Tillman A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
To: | |
Shared Package | |
ML20212A335 | List: |
References | |
50-259-86-21, 50-260-86-21, 50-296-86-21, NUDOCS 8607280165 | |
Download: ML20212A359 (1) | |
Similar Documents at Browns Ferry | |
---|---|
Category:INSPECTION REPORT
MONTHYEARIR 05000259/19990041999-08-23023 August 1999
[Table view]Insp Repts 50-259/99-04,50-260/99-04 & 50-296/99-04 on 990613-0724.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000259/19990031999-07-0808 July 1999 Insp Repts 50-259/99-03,50-260/99-03 & 50-296/99-03 on 990502-0612.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance,Engineering,Plant Support & Licensee bi-annual Emergency Preparedness Exercise IR 05000259/19990021999-05-28028 May 1999 Insp Repts 50-259/99-02,50-260/99-02 & 50-296/99-02 on 990321-0501.Four Violation Noted & Being Treated as non-cited Violations.Major Areas Inspected:Aspects of Licensee Operation,Maint,Engineering & Plant Support IR 05000259/19990011999-04-15015 April 1999 Insp Repts 50-259/99-01,50-260/99-01 & 50-296/99-01 on 990207-0320.Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support.Also Insp,Licensee Emergency Preparedness & Security Programs IR 05000259/19980091999-03-0505 March 1999 Insp Repts 50-259/98-09,50-260/98-09 & 50-296/98-09 on 981227-990206.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support Re Plant Security IR 05000260/19980111999-01-30030 January 1999 Insp Repts 50-260/98-11 & 50-296/98-11 on 981116-1204. No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000259/19980081999-01-25025 January 1999 Insp Repts 50-259/98-08,50-260/98-08 & 50-296/98-08 on 981115-1226.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000259/19980071998-12-0909 December 1998 Insp Repts 50-259/98-07,50-260/98-07 & 50-296/98-07 on 981004-1114.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000259/19980061998-11-0202 November 1998 Insp Repts 50-259/98-06,50-260/98-06 & 50-296/98-06 on 980823-1023.Violation Noted.Major Areas Inspected:Operation, Maint,Engineering & Plant Support IR 05000259/19980121998-10-22022 October 1998 Partially Withheld Insp Repts 50-259/98-12,50-260/98-12 & 50-296/98-12 on 980928-1002.No Violations Noted.Major Areas Inspected:Plant Support,Physical Security Program for Power Reactors IR 05000259/19980051998-09-18018 September 1998 Insp Repts 50-259/98-05,50-260/98-05 & 50-296/98-05 on 980712-0822.No Violations Noted.Major Areas Inspected: Operations,Maint & Engineering IR 05000259/19980041998-08-0707 August 1998 Insp Repts 50-259/98-04,50-260/98-04 & 50-296/98-04 on 980524-0711.No Violations Noted.Major Areas Inspected: Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000259/19980031998-06-16016 June 1998 Insp Repts 50-259/98-03,50-260/98-03 & 50-296/98-03 on 980412-0523.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maint & Plant Support.Addl Rept Includes GL 89-01 Implementation of Motor Operated Valve ML18039A3481998-05-0505 May 1998 Insp Repts 50-259/98-02,50-260/98-02 & 50-296/98-02 on 980301-0411.Violations Noted.Major Areas Inspected: Operations,Engineering,Maint & Plant Support IR 05000259/19980011998-03-24024 March 1998 Insp Repts 50-259/98-01,50-260/98-01 & 50-296/98-01 on 980118-0228.No Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML18039A2531998-02-12012 February 1998 Insp Repts 50-259/97-12,50-260/97-12 & 50-296/97-12 on 971207-980117.Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML18039A2331998-01-0202 January 1998 Insp Repts 50-259/97-11,50-260/97-11 & 50-296/97-11 on 971026-1206.Violations & Deviations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML18038C0041997-11-24024 November 1997 Insp Repts 50-259/97-10,50-260/97-10 & 50-296/97-10. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint,Plant Support,Radiological Controls & Fire Protection ML18038B9791997-10-0808 October 1997 Insp Repts 50-259/97-09 50-260/97-09 & 50-296/97-09 on 970803-0913.Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML18038B9441997-08-29029 August 1997 Insp Repts 50-259/97-08,50-260/97-08 & 50-296/97-08 on 970622-0802.Violation Noted.Major Areas Inspected: Operations,Engineering,Maint & Plant Support IR 05000259/19970061997-07-21021 July 1997 Insp Repts 50-259/97-06,50-260/97-06 & 50-296/97-06 on 970602-06.Violations Noted.Major Areas Inspected.Observation & Evaluation of Biennial Emergency Preparedness Exercise ML18038B9181997-07-17017 July 1997 Insp Repts 50-259/97-07,50-260/97-07 & 50-296/97-07 on 970511-0621.Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000259/19960071996-07-19019 July 1996 Partially Withheld Insp Repts 50-259/96-07,50-260/96-07 & 50-296/96-07 on 960617-21 (Ref 10CFR73.21(c)(2)).Violations Noted.Major Areas Inspected:Aspects of Security Program for Power Reactors,Including Detection & Assessment Aids IR 05000259/19930371993-11-0303 November 1993 Partially Withheld Insp Repts 50-259/93-37,50-260/93-37 & 50-296/93-37 on 931004-08.Noncited Violation Identified. Major Areas Inspected:Security Program Plans,Alarm Station & Communication,Access Controls & Personnel IR 05000259/19930091993-05-26026 May 1993 Partially Withheld Insp Repts 50-259/93-09,50-260/93-09 & 50-296/93-09 on 930426-30 (Ref 10CFR73.21).Violation Noted But Not Cited.Major Areas Inspected:Physical Security Program for Power Reactors IR 05000259/19930061993-03-18018 March 1993 Insp Repts 50-259/93-06,50-260/93-06 & 50-296/93-06 on 930222-26.Non-cited Violations Noted.Major Areas Inspected: Mgt Support,Physical Barriers,Protected & Vital Areas,Access Control & Security Communications.Partially Withheld IR 05000259/19910141991-04-22022 April 1991 Insp Repts 50-259/91-14,50-260/91-14 & 50-296/91-14 on 910325-29.No Violations Noted.Major Areas Inspected:Valve Operators,Level Switches,Temp Elements,Level Transmitters, Flow Switches,Terminal Blocks & Junction Boxes IR 05000259/19910121991-04-16016 April 1991 Insp Repts 50-259/91-12,50-260/91-12 & 50-296/91-12 on 910315-20.No Violations Noted.Major Areas Inspected:Test Procedures,Test Preparation,Test Performance & Test Results of Primary Containment Integrated Leak Rate Test IR 05000259/19910021991-03-18018 March 1991 Insp Repts 50-259/91-02,50-260/91-02 & 50-296/91-02 on 910119-0215.Non-cited Violations Noted.Major Areas Inspected:Surveillance,Maint,Operational Safety,Mods,Post Mod Testing,Esfs Walkdown,Standby Liquid Control & Mgt IR 05000259/19910051991-02-22022 February 1991 Insp Repts 50-259/91-05,50-260/91-05 & 50-296/91-05 on 910129-0201.No Violations Noted.Major Areas Inspected: External Exposure,Dose Reduction Initiatives,Alara & Contamination Control IR 05000259/19900221990-12-10010 December 1990 Insp Repts 50-259/90-22,50-260/90-22 & 50-296/90-22 on 900625-29.No Violations Noted.Major Areas Inspected:Followup of BFN Implementation of EQ Program to Comply W/Requirements of 10CFR50.49 IR 05000259/19900201990-08-13013 August 1990 Insp Repts 50-259/90-20,50-260/90-20 & 50-296/90-20 on 900625-29 & 0709-13.No Violations or Deviations Noted.Major Areas Inspected:Corrective Action Program Implementation & Quality Verification Activities IR 05000266/19900121990-06-0808 June 1990 Enforcement Conference Repts 50-266/90-12 & 50-301/90-12 on 900525.Violations Noted.Major Areas Discussed:Licensee Apparent Recurrent High Radiation Area Barrier Violations & Weaknesses in Radiation Protection Program IR 05000259/19900121990-04-24024 April 1990 Partially Withheld Insp Repts 50-259/90-12,50-260/90-12 & 50-296/90-12 on 900404 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Personnel Access Control & Safeguards Contingency Plan Implementation IR 05000259/19900041990-03-0808 March 1990 Partially Withheld Insp Repts 50-259/90-04,50-260/90-04 & 50-296/90-04 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors,Including Mgt Support & Audits IR 05000269/19890391990-02-22022 February 1990 Insp Repts 50-269/89-39,50-270/89-39 & 50-287/89-39 on 891212-15 & 18-20.No Violations or Deviations Noted.Major Areas inspected:post-refueling Startup Tests of Unit 3 & Core Performance Surveillances on Units 1 & 2 IR 05000260/19890621990-02-13013 February 1990 Insp Rept 50-260/89-62 on 891109-1213.No Violations Noted. Major Areas Inspected:Design of CRD Housing Lateral Restraint,Design of Restraint Beam Assembly & Calculation of Equivalent Spring Constant K1 & K2 IR 05000260/19890421990-02-13013 February 1990 Insp Rept 50-260/89-42 on 891106-10.Major Areas Inspected: Responses to Open Items in Rept 50-260/89-32,util Final Resolution of Control Rod Drive Housing Upgrade Program & Potential Buckling of Reactor Vessel Skirt Support IR 05000260/19890591990-02-0606 February 1990 Insp Rept 50-260/89-59 on 891204-08.Open Items Noted Re Ampacity Calculations,Proper Cable Separation & Spec for Installation of Instrument Sense Lines.Major Areas Inspected:Electrical Issues in Nuclear Performance Plan IR 05000259/19890531990-01-18018 January 1990 Insp Repts 50-259/89-53,50-260/89-53 & 50-296/89-53 on 891115-1218.Violations & Deviations Noted.Major Areas Inspected:Surveillance Observations,Licensed Power Indication,Maint Observation & Restart Test Program IR 05000260/19890441989-12-0101 December 1989 Insp Rept 50-260/89-44 on 891016-27.Violations Noted.Major Areas Inspected:Design Criteria Documents,Implementing Procedures & Calculations Associated W/Ie Bulletin 79-14/ 79-02 Program for safety-related Piping at Plant IR 05000260/19890321989-11-0707 November 1989 Insp Rept 50-260/89-32 on 890605-0818.Major Areas Inspected: Review of Util Responses to Ten Open Items Identified in Insp Rept 50-260/89-30,design Calculations Re Primary Containment & Four Issues Under Seismic Design Program IR 05000259/19890451989-11-0101 November 1989 Partially Withheld Insp Repts 50-259/89-45,50-260/89-45 & 50-296/89-45 on 890918-22 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Mgt Effectiveness, Records & Repts & Security Contingency Plan IR 05000260/19890391989-10-10010 October 1989 Insp Rept 50-260/89-39 on 890814-16.Violation Noted.Major Areas Inspected:Final GE Part 21 Evaluation & Open Items Identified in Insp Rept 50-260/89-31 IR 05000260/19890361989-09-21021 September 1989 Insp Rept 50-260/89-36 on 890828-0901.No Violations Noted. Major Areas Inspected:Small Bore Piping & Instrument Tubing Program IR 05000260/19890301989-09-18018 September 1989 Insp Rept 50-260/89-30 on 890313-24.No Violations Noted. Major Areas Inspected:Essential Design Calculations Under Civil Calculation Review Program IR 05000260/19880391989-06-17017 June 1989 Insp Rept 50-260/88-39 on 881219-22.Six Out of Eight Open Items Reviewed Closed.Major Areas Inspected:Techniques, Procedures & Criteria Used for Generating New Amplified Response Spectra (Ars) & Util Responses to Open Items IR 05000260/19890211989-06-14014 June 1989 Insp Rept 50-260/89-21 on 890123-24.Two of Three Items Reviewed During Insp Considered Closed.Major Areas Inspected:Responses to Three Open Items Identified in Insp Rept 50-260/88-38,including CSG-14,CSG-23 & CSG-26 IR 05000260/19890151989-05-17017 May 1989 Insp Rept 50-260/89-15 on 890123-0203.Open Item Noted Re Calculations Associated W/Ie Bulletins 79-14 & 79-02 on safety-related Piping.Major Areas Inspected:Design Criteria Documents & Calculations for safety-related Piping IR 05000259/19890061989-05-0303 May 1989 Insp Repts 50-259/89-06,50-260/89-06 & 50-296/89-06 on 890130-0203 & 0214-0310.Violations & Deviations Noted.Major Areas Inspected:Adequacy of Testing,Calibr,Maint & Configuration Control of safety-related Instrumentation 1999-08-23 Category:NRC-GENERATED MONTHYEARIR 05000259/19990041999-08-23023 August 1999
[Table view]Insp Repts 50-259/99-04,50-260/99-04 & 50-296/99-04 on 990613-0724.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000259/19990031999-07-0808 July 1999 Insp Repts 50-259/99-03,50-260/99-03 & 50-296/99-03 on 990502-0612.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance,Engineering,Plant Support & Licensee bi-annual Emergency Preparedness Exercise IR 05000259/19990021999-05-28028 May 1999 Insp Repts 50-259/99-02,50-260/99-02 & 50-296/99-02 on 990321-0501.Four Violation Noted & Being Treated as non-cited Violations.Major Areas Inspected:Aspects of Licensee Operation,Maint,Engineering & Plant Support IR 05000259/19990011999-04-15015 April 1999 Insp Repts 50-259/99-01,50-260/99-01 & 50-296/99-01 on 990207-0320.Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support.Also Insp,Licensee Emergency Preparedness & Security Programs IR 05000259/19980091999-03-0505 March 1999 Insp Repts 50-259/98-09,50-260/98-09 & 50-296/98-09 on 981227-990206.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support Re Plant Security IR 05000260/19980111999-01-30030 January 1999 Insp Repts 50-260/98-11 & 50-296/98-11 on 981116-1204. No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000259/19980081999-01-25025 January 1999 Insp Repts 50-259/98-08,50-260/98-08 & 50-296/98-08 on 981115-1226.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000259/19980071998-12-0909 December 1998 Insp Repts 50-259/98-07,50-260/98-07 & 50-296/98-07 on 981004-1114.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000259/19980061998-11-0202 November 1998 Insp Repts 50-259/98-06,50-260/98-06 & 50-296/98-06 on 980823-1023.Violation Noted.Major Areas Inspected:Operation, Maint,Engineering & Plant Support IR 05000259/19980121998-10-22022 October 1998 Partially Withheld Insp Repts 50-259/98-12,50-260/98-12 & 50-296/98-12 on 980928-1002.No Violations Noted.Major Areas Inspected:Plant Support,Physical Security Program for Power Reactors IR 05000259/19980051998-09-18018 September 1998 Insp Repts 50-259/98-05,50-260/98-05 & 50-296/98-05 on 980712-0822.No Violations Noted.Major Areas Inspected: Operations,Maint & Engineering IR 05000259/19980041998-08-0707 August 1998 Insp Repts 50-259/98-04,50-260/98-04 & 50-296/98-04 on 980524-0711.No Violations Noted.Major Areas Inspected: Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000259/19980031998-06-16016 June 1998 Insp Repts 50-259/98-03,50-260/98-03 & 50-296/98-03 on 980412-0523.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maint & Plant Support.Addl Rept Includes GL 89-01 Implementation of Motor Operated Valve ML18039A3481998-05-0505 May 1998 Insp Repts 50-259/98-02,50-260/98-02 & 50-296/98-02 on 980301-0411.Violations Noted.Major Areas Inspected: Operations,Engineering,Maint & Plant Support IR 05000259/19980011998-03-24024 March 1998 Insp Repts 50-259/98-01,50-260/98-01 & 50-296/98-01 on 980118-0228.No Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML18039A2531998-02-12012 February 1998 Insp Repts 50-259/97-12,50-260/97-12 & 50-296/97-12 on 971207-980117.Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML18039A2331998-01-0202 January 1998 Insp Repts 50-259/97-11,50-260/97-11 & 50-296/97-11 on 971026-1206.Violations & Deviations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML18038C0041997-11-24024 November 1997 Insp Repts 50-259/97-10,50-260/97-10 & 50-296/97-10. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint,Plant Support,Radiological Controls & Fire Protection ML18038B9791997-10-0808 October 1997 Insp Repts 50-259/97-09 50-260/97-09 & 50-296/97-09 on 970803-0913.Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML18038B9441997-08-29029 August 1997 Insp Repts 50-259/97-08,50-260/97-08 & 50-296/97-08 on 970622-0802.Violation Noted.Major Areas Inspected: Operations,Engineering,Maint & Plant Support IR 05000259/19970061997-07-21021 July 1997 Insp Repts 50-259/97-06,50-260/97-06 & 50-296/97-06 on 970602-06.Violations Noted.Major Areas Inspected.Observation & Evaluation of Biennial Emergency Preparedness Exercise ML18038B9181997-07-17017 July 1997 Insp Repts 50-259/97-07,50-260/97-07 & 50-296/97-07 on 970511-0621.Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000259/19960071996-07-19019 July 1996 Partially Withheld Insp Repts 50-259/96-07,50-260/96-07 & 50-296/96-07 on 960617-21 (Ref 10CFR73.21(c)(2)).Violations Noted.Major Areas Inspected:Aspects of Security Program for Power Reactors,Including Detection & Assessment Aids IR 05000259/19930371993-11-0303 November 1993 Partially Withheld Insp Repts 50-259/93-37,50-260/93-37 & 50-296/93-37 on 931004-08.Noncited Violation Identified. Major Areas Inspected:Security Program Plans,Alarm Station & Communication,Access Controls & Personnel IR 05000259/19930091993-05-26026 May 1993 Partially Withheld Insp Repts 50-259/93-09,50-260/93-09 & 50-296/93-09 on 930426-30 (Ref 10CFR73.21).Violation Noted But Not Cited.Major Areas Inspected:Physical Security Program for Power Reactors IR 05000259/19930061993-03-18018 March 1993 Insp Repts 50-259/93-06,50-260/93-06 & 50-296/93-06 on 930222-26.Non-cited Violations Noted.Major Areas Inspected: Mgt Support,Physical Barriers,Protected & Vital Areas,Access Control & Security Communications.Partially Withheld IR 05000259/19910141991-04-22022 April 1991 Insp Repts 50-259/91-14,50-260/91-14 & 50-296/91-14 on 910325-29.No Violations Noted.Major Areas Inspected:Valve Operators,Level Switches,Temp Elements,Level Transmitters, Flow Switches,Terminal Blocks & Junction Boxes IR 05000259/19910121991-04-16016 April 1991 Insp Repts 50-259/91-12,50-260/91-12 & 50-296/91-12 on 910315-20.No Violations Noted.Major Areas Inspected:Test Procedures,Test Preparation,Test Performance & Test Results of Primary Containment Integrated Leak Rate Test IR 05000259/19910021991-03-18018 March 1991 Insp Repts 50-259/91-02,50-260/91-02 & 50-296/91-02 on 910119-0215.Non-cited Violations Noted.Major Areas Inspected:Surveillance,Maint,Operational Safety,Mods,Post Mod Testing,Esfs Walkdown,Standby Liquid Control & Mgt IR 05000259/19910051991-02-22022 February 1991 Insp Repts 50-259/91-05,50-260/91-05 & 50-296/91-05 on 910129-0201.No Violations Noted.Major Areas Inspected: External Exposure,Dose Reduction Initiatives,Alara & Contamination Control IR 05000259/19900221990-12-10010 December 1990 Insp Repts 50-259/90-22,50-260/90-22 & 50-296/90-22 on 900625-29.No Violations Noted.Major Areas Inspected:Followup of BFN Implementation of EQ Program to Comply W/Requirements of 10CFR50.49 IR 05000259/19900201990-08-13013 August 1990 Insp Repts 50-259/90-20,50-260/90-20 & 50-296/90-20 on 900625-29 & 0709-13.No Violations or Deviations Noted.Major Areas Inspected:Corrective Action Program Implementation & Quality Verification Activities IR 05000266/19900121990-06-0808 June 1990 Enforcement Conference Repts 50-266/90-12 & 50-301/90-12 on 900525.Violations Noted.Major Areas Discussed:Licensee Apparent Recurrent High Radiation Area Barrier Violations & Weaknesses in Radiation Protection Program IR 05000259/19900121990-04-24024 April 1990 Partially Withheld Insp Repts 50-259/90-12,50-260/90-12 & 50-296/90-12 on 900404 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Personnel Access Control & Safeguards Contingency Plan Implementation IR 05000259/19900041990-03-0808 March 1990 Partially Withheld Insp Repts 50-259/90-04,50-260/90-04 & 50-296/90-04 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors,Including Mgt Support & Audits IR 05000269/19890391990-02-22022 February 1990 Insp Repts 50-269/89-39,50-270/89-39 & 50-287/89-39 on 891212-15 & 18-20.No Violations or Deviations Noted.Major Areas inspected:post-refueling Startup Tests of Unit 3 & Core Performance Surveillances on Units 1 & 2 IR 05000260/19890621990-02-13013 February 1990 Insp Rept 50-260/89-62 on 891109-1213.No Violations Noted. Major Areas Inspected:Design of CRD Housing Lateral Restraint,Design of Restraint Beam Assembly & Calculation of Equivalent Spring Constant K1 & K2 IR 05000260/19890421990-02-13013 February 1990 Insp Rept 50-260/89-42 on 891106-10.Major Areas Inspected: Responses to Open Items in Rept 50-260/89-32,util Final Resolution of Control Rod Drive Housing Upgrade Program & Potential Buckling of Reactor Vessel Skirt Support IR 05000260/19890591990-02-0606 February 1990 Insp Rept 50-260/89-59 on 891204-08.Open Items Noted Re Ampacity Calculations,Proper Cable Separation & Spec for Installation of Instrument Sense Lines.Major Areas Inspected:Electrical Issues in Nuclear Performance Plan IR 05000259/19890531990-01-18018 January 1990 Insp Repts 50-259/89-53,50-260/89-53 & 50-296/89-53 on 891115-1218.Violations & Deviations Noted.Major Areas Inspected:Surveillance Observations,Licensed Power Indication,Maint Observation & Restart Test Program IR 05000260/19890441989-12-0101 December 1989 Insp Rept 50-260/89-44 on 891016-27.Violations Noted.Major Areas Inspected:Design Criteria Documents,Implementing Procedures & Calculations Associated W/Ie Bulletin 79-14/ 79-02 Program for safety-related Piping at Plant IR 05000260/19890321989-11-0707 November 1989 Insp Rept 50-260/89-32 on 890605-0818.Major Areas Inspected: Review of Util Responses to Ten Open Items Identified in Insp Rept 50-260/89-30,design Calculations Re Primary Containment & Four Issues Under Seismic Design Program IR 05000259/19890451989-11-0101 November 1989 Partially Withheld Insp Repts 50-259/89-45,50-260/89-45 & 50-296/89-45 on 890918-22 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Mgt Effectiveness, Records & Repts & Security Contingency Plan IR 05000260/19890391989-10-10010 October 1989 Insp Rept 50-260/89-39 on 890814-16.Violation Noted.Major Areas Inspected:Final GE Part 21 Evaluation & Open Items Identified in Insp Rept 50-260/89-31 IR 05000260/19890361989-09-21021 September 1989 Insp Rept 50-260/89-36 on 890828-0901.No Violations Noted. Major Areas Inspected:Small Bore Piping & Instrument Tubing Program IR 05000260/19890301989-09-18018 September 1989 Insp Rept 50-260/89-30 on 890313-24.No Violations Noted. Major Areas Inspected:Essential Design Calculations Under Civil Calculation Review Program IR 05000260/19880391989-06-17017 June 1989 Insp Rept 50-260/88-39 on 881219-22.Six Out of Eight Open Items Reviewed Closed.Major Areas Inspected:Techniques, Procedures & Criteria Used for Generating New Amplified Response Spectra (Ars) & Util Responses to Open Items IR 05000260/19890211989-06-14014 June 1989 Insp Rept 50-260/89-21 on 890123-24.Two of Three Items Reviewed During Insp Considered Closed.Major Areas Inspected:Responses to Three Open Items Identified in Insp Rept 50-260/88-38,including CSG-14,CSG-23 & CSG-26 IR 05000260/19890151989-05-17017 May 1989 Insp Rept 50-260/89-15 on 890123-0203.Open Item Noted Re Calculations Associated W/Ie Bulletins 79-14 & 79-02 on safety-related Piping.Major Areas Inspected:Design Criteria Documents & Calculations for safety-related Piping IR 05000259/19890061989-05-0303 May 1989 Insp Repts 50-259/89-06,50-260/89-06 & 50-296/89-06 on 890130-0203 & 0214-0310.Violations & Deviations Noted.Major Areas Inspected:Adequacy of Testing,Calibr,Maint & Configuration Control of safety-related Instrumentation 1999-08-23 Category:INSPECTION REPORT MONTHYEARIR 05000259/19990041999-08-23023 August 1999
[Table view]Insp Repts 50-259/99-04,50-260/99-04 & 50-296/99-04 on 990613-0724.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000259/19990031999-07-0808 July 1999 Insp Repts 50-259/99-03,50-260/99-03 & 50-296/99-03 on 990502-0612.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance,Engineering,Plant Support & Licensee bi-annual Emergency Preparedness Exercise IR 05000259/19990021999-05-28028 May 1999 Insp Repts 50-259/99-02,50-260/99-02 & 50-296/99-02 on 990321-0501.Four Violation Noted & Being Treated as non-cited Violations.Major Areas Inspected:Aspects of Licensee Operation,Maint,Engineering & Plant Support IR 05000259/19990011999-04-15015 April 1999 Insp Repts 50-259/99-01,50-260/99-01 & 50-296/99-01 on 990207-0320.Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support.Also Insp,Licensee Emergency Preparedness & Security Programs IR 05000259/19980091999-03-0505 March 1999 Insp Repts 50-259/98-09,50-260/98-09 & 50-296/98-09 on 981227-990206.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support Re Plant Security IR 05000260/19980111999-01-30030 January 1999 Insp Repts 50-260/98-11 & 50-296/98-11 on 981116-1204. No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000259/19980081999-01-25025 January 1999 Insp Repts 50-259/98-08,50-260/98-08 & 50-296/98-08 on 981115-1226.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000259/19980071998-12-0909 December 1998 Insp Repts 50-259/98-07,50-260/98-07 & 50-296/98-07 on 981004-1114.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000259/19980061998-11-0202 November 1998 Insp Repts 50-259/98-06,50-260/98-06 & 50-296/98-06 on 980823-1023.Violation Noted.Major Areas Inspected:Operation, Maint,Engineering & Plant Support IR 05000259/19980121998-10-22022 October 1998 Partially Withheld Insp Repts 50-259/98-12,50-260/98-12 & 50-296/98-12 on 980928-1002.No Violations Noted.Major Areas Inspected:Plant Support,Physical Security Program for Power Reactors IR 05000259/19980051998-09-18018 September 1998 Insp Repts 50-259/98-05,50-260/98-05 & 50-296/98-05 on 980712-0822.No Violations Noted.Major Areas Inspected: Operations,Maint & Engineering IR 05000259/19980041998-08-0707 August 1998 Insp Repts 50-259/98-04,50-260/98-04 & 50-296/98-04 on 980524-0711.No Violations Noted.Major Areas Inspected: Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000259/19980031998-06-16016 June 1998 Insp Repts 50-259/98-03,50-260/98-03 & 50-296/98-03 on 980412-0523.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maint & Plant Support.Addl Rept Includes GL 89-01 Implementation of Motor Operated Valve ML18039A3481998-05-0505 May 1998 Insp Repts 50-259/98-02,50-260/98-02 & 50-296/98-02 on 980301-0411.Violations Noted.Major Areas Inspected: Operations,Engineering,Maint & Plant Support IR 05000259/19980011998-03-24024 March 1998 Insp Repts 50-259/98-01,50-260/98-01 & 50-296/98-01 on 980118-0228.No Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML18039A2531998-02-12012 February 1998 Insp Repts 50-259/97-12,50-260/97-12 & 50-296/97-12 on 971207-980117.Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML18039A2331998-01-0202 January 1998 Insp Repts 50-259/97-11,50-260/97-11 & 50-296/97-11 on 971026-1206.Violations & Deviations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML18038C0041997-11-24024 November 1997 Insp Repts 50-259/97-10,50-260/97-10 & 50-296/97-10. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint,Plant Support,Radiological Controls & Fire Protection ML18038B9791997-10-0808 October 1997 Insp Repts 50-259/97-09 50-260/97-09 & 50-296/97-09 on 970803-0913.Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML18038B9441997-08-29029 August 1997 Insp Repts 50-259/97-08,50-260/97-08 & 50-296/97-08 on 970622-0802.Violation Noted.Major Areas Inspected: Operations,Engineering,Maint & Plant Support IR 05000259/19970061997-07-21021 July 1997 Insp Repts 50-259/97-06,50-260/97-06 & 50-296/97-06 on 970602-06.Violations Noted.Major Areas Inspected.Observation & Evaluation of Biennial Emergency Preparedness Exercise ML18038B9181997-07-17017 July 1997 Insp Repts 50-259/97-07,50-260/97-07 & 50-296/97-07 on 970511-0621.Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000259/19960071996-07-19019 July 1996 Partially Withheld Insp Repts 50-259/96-07,50-260/96-07 & 50-296/96-07 on 960617-21 (Ref 10CFR73.21(c)(2)).Violations Noted.Major Areas Inspected:Aspects of Security Program for Power Reactors,Including Detection & Assessment Aids IR 05000259/19930371993-11-0303 November 1993 Partially Withheld Insp Repts 50-259/93-37,50-260/93-37 & 50-296/93-37 on 931004-08.Noncited Violation Identified. Major Areas Inspected:Security Program Plans,Alarm Station & Communication,Access Controls & Personnel IR 05000259/19930091993-05-26026 May 1993 Partially Withheld Insp Repts 50-259/93-09,50-260/93-09 & 50-296/93-09 on 930426-30 (Ref 10CFR73.21).Violation Noted But Not Cited.Major Areas Inspected:Physical Security Program for Power Reactors IR 05000259/19930061993-03-18018 March 1993 Insp Repts 50-259/93-06,50-260/93-06 & 50-296/93-06 on 930222-26.Non-cited Violations Noted.Major Areas Inspected: Mgt Support,Physical Barriers,Protected & Vital Areas,Access Control & Security Communications.Partially Withheld IR 05000259/19910141991-04-22022 April 1991 Insp Repts 50-259/91-14,50-260/91-14 & 50-296/91-14 on 910325-29.No Violations Noted.Major Areas Inspected:Valve Operators,Level Switches,Temp Elements,Level Transmitters, Flow Switches,Terminal Blocks & Junction Boxes IR 05000259/19910121991-04-16016 April 1991 Insp Repts 50-259/91-12,50-260/91-12 & 50-296/91-12 on 910315-20.No Violations Noted.Major Areas Inspected:Test Procedures,Test Preparation,Test Performance & Test Results of Primary Containment Integrated Leak Rate Test IR 05000259/19910021991-03-18018 March 1991 Insp Repts 50-259/91-02,50-260/91-02 & 50-296/91-02 on 910119-0215.Non-cited Violations Noted.Major Areas Inspected:Surveillance,Maint,Operational Safety,Mods,Post Mod Testing,Esfs Walkdown,Standby Liquid Control & Mgt IR 05000259/19910051991-02-22022 February 1991 Insp Repts 50-259/91-05,50-260/91-05 & 50-296/91-05 on 910129-0201.No Violations Noted.Major Areas Inspected: External Exposure,Dose Reduction Initiatives,Alara & Contamination Control IR 05000259/19900221990-12-10010 December 1990 Insp Repts 50-259/90-22,50-260/90-22 & 50-296/90-22 on 900625-29.No Violations Noted.Major Areas Inspected:Followup of BFN Implementation of EQ Program to Comply W/Requirements of 10CFR50.49 IR 05000259/19900201990-08-13013 August 1990 Insp Repts 50-259/90-20,50-260/90-20 & 50-296/90-20 on 900625-29 & 0709-13.No Violations or Deviations Noted.Major Areas Inspected:Corrective Action Program Implementation & Quality Verification Activities IR 05000266/19900121990-06-0808 June 1990 Enforcement Conference Repts 50-266/90-12 & 50-301/90-12 on 900525.Violations Noted.Major Areas Discussed:Licensee Apparent Recurrent High Radiation Area Barrier Violations & Weaknesses in Radiation Protection Program IR 05000259/19900121990-04-24024 April 1990 Partially Withheld Insp Repts 50-259/90-12,50-260/90-12 & 50-296/90-12 on 900404 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Personnel Access Control & Safeguards Contingency Plan Implementation IR 05000259/19900041990-03-0808 March 1990 Partially Withheld Insp Repts 50-259/90-04,50-260/90-04 & 50-296/90-04 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors,Including Mgt Support & Audits IR 05000269/19890391990-02-22022 February 1990 Insp Repts 50-269/89-39,50-270/89-39 & 50-287/89-39 on 891212-15 & 18-20.No Violations or Deviations Noted.Major Areas inspected:post-refueling Startup Tests of Unit 3 & Core Performance Surveillances on Units 1 & 2 IR 05000260/19890621990-02-13013 February 1990 Insp Rept 50-260/89-62 on 891109-1213.No Violations Noted. Major Areas Inspected:Design of CRD Housing Lateral Restraint,Design of Restraint Beam Assembly & Calculation of Equivalent Spring Constant K1 & K2 IR 05000260/19890421990-02-13013 February 1990 Insp Rept 50-260/89-42 on 891106-10.Major Areas Inspected: Responses to Open Items in Rept 50-260/89-32,util Final Resolution of Control Rod Drive Housing Upgrade Program & Potential Buckling of Reactor Vessel Skirt Support IR 05000260/19890591990-02-0606 February 1990 Insp Rept 50-260/89-59 on 891204-08.Open Items Noted Re Ampacity Calculations,Proper Cable Separation & Spec for Installation of Instrument Sense Lines.Major Areas Inspected:Electrical Issues in Nuclear Performance Plan IR 05000259/19890531990-01-18018 January 1990 Insp Repts 50-259/89-53,50-260/89-53 & 50-296/89-53 on 891115-1218.Violations & Deviations Noted.Major Areas Inspected:Surveillance Observations,Licensed Power Indication,Maint Observation & Restart Test Program IR 05000260/19890441989-12-0101 December 1989 Insp Rept 50-260/89-44 on 891016-27.Violations Noted.Major Areas Inspected:Design Criteria Documents,Implementing Procedures & Calculations Associated W/Ie Bulletin 79-14/ 79-02 Program for safety-related Piping at Plant IR 05000260/19890321989-11-0707 November 1989 Insp Rept 50-260/89-32 on 890605-0818.Major Areas Inspected: Review of Util Responses to Ten Open Items Identified in Insp Rept 50-260/89-30,design Calculations Re Primary Containment & Four Issues Under Seismic Design Program IR 05000259/19890451989-11-0101 November 1989 Partially Withheld Insp Repts 50-259/89-45,50-260/89-45 & 50-296/89-45 on 890918-22 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Mgt Effectiveness, Records & Repts & Security Contingency Plan IR 05000260/19890391989-10-10010 October 1989 Insp Rept 50-260/89-39 on 890814-16.Violation Noted.Major Areas Inspected:Final GE Part 21 Evaluation & Open Items Identified in Insp Rept 50-260/89-31 IR 05000260/19890361989-09-21021 September 1989 Insp Rept 50-260/89-36 on 890828-0901.No Violations Noted. Major Areas Inspected:Small Bore Piping & Instrument Tubing Program IR 05000260/19890301989-09-18018 September 1989 Insp Rept 50-260/89-30 on 890313-24.No Violations Noted. Major Areas Inspected:Essential Design Calculations Under Civil Calculation Review Program IR 05000260/19880391989-06-17017 June 1989 Insp Rept 50-260/88-39 on 881219-22.Six Out of Eight Open Items Reviewed Closed.Major Areas Inspected:Techniques, Procedures & Criteria Used for Generating New Amplified Response Spectra (Ars) & Util Responses to Open Items IR 05000260/19890211989-06-14014 June 1989 Insp Rept 50-260/89-21 on 890123-24.Two of Three Items Reviewed During Insp Considered Closed.Major Areas Inspected:Responses to Three Open Items Identified in Insp Rept 50-260/88-38,including CSG-14,CSG-23 & CSG-26 IR 05000260/19890151989-05-17017 May 1989 Insp Rept 50-260/89-15 on 890123-0203.Open Item Noted Re Calculations Associated W/Ie Bulletins 79-14 & 79-02 on safety-related Piping.Major Areas Inspected:Design Criteria Documents & Calculations for safety-related Piping IR 05000259/19890061989-05-0303 May 1989 Insp Repts 50-259/89-06,50-260/89-06 & 50-296/89-06 on 890130-0203 & 0214-0310.Violations & Deviations Noted.Major Areas Inspected:Adequacy of Testing,Calibr,Maint & Configuration Control of safety-related Instrumentation 1999-08-23 Category:UTILITY MONTHYEARIR 05000259/19900201990-08-13013 August 1990
[Table view]Insp Repts 50-259/90-20,50-260/90-20 & 50-296/90-20 on 900625-29 & 0709-13.No Violations or Deviations Noted.Major Areas Inspected:Corrective Action Program Implementation & Quality Verification Activities IR 05000266/19900121990-06-0808 June 1990 Enforcement Conference Repts 50-266/90-12 & 50-301/90-12 on 900525.Violations Noted.Major Areas Discussed:Licensee Apparent Recurrent High Radiation Area Barrier Violations & Weaknesses in Radiation Protection Program IR 05000259/19900041990-03-0808 March 1990 Partially Withheld Insp Repts 50-259/90-04,50-260/90-04 & 50-296/90-04 (Ref 10CFR2.790(d) & 73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors,Including Mgt Support & Audits IR 05000269/19890391990-02-22022 February 1990 Insp Repts 50-269/89-39,50-270/89-39 & 50-287/89-39 on 891212-15 & 18-20.No Violations or Deviations Noted.Major Areas inspected:post-refueling Startup Tests of Unit 3 & Core Performance Surveillances on Units 1 & 2 IR 05000260/19890421990-02-13013 February 1990 Insp Rept 50-260/89-42 on 891106-10.Major Areas Inspected: Responses to Open Items in Rept 50-260/89-32,util Final Resolution of Control Rod Drive Housing Upgrade Program & Potential Buckling of Reactor Vessel Skirt Support IR 05000260/19890621990-02-13013 February 1990 Insp Rept 50-260/89-62 on 891109-1213.No Violations Noted. Major Areas Inspected:Design of CRD Housing Lateral Restraint,Design of Restraint Beam Assembly & Calculation of Equivalent Spring Constant K1 & K2 IR 05000260/19890591990-02-0606 February 1990 Insp Rept 50-260/89-59 on 891204-08.Open Items Noted Re Ampacity Calculations,Proper Cable Separation & Spec for Installation of Instrument Sense Lines.Major Areas Inspected:Electrical Issues in Nuclear Performance Plan IR 05000259/19890531990-01-18018 January 1990 Insp Repts 50-259/89-53,50-260/89-53 & 50-296/89-53 on 891115-1218.Violations & Deviations Noted.Major Areas Inspected:Surveillance Observations,Licensed Power Indication,Maint Observation & Restart Test Program IR 05000260/19890441989-12-0101 December 1989 Insp Rept 50-260/89-44 on 891016-27.Violations Noted.Major Areas Inspected:Design Criteria Documents,Implementing Procedures & Calculations Associated W/Ie Bulletin 79-14/ 79-02 Program for safety-related Piping at Plant IR 05000260/19890321989-11-0707 November 1989 Insp Rept 50-260/89-32 on 890605-0818.Major Areas Inspected: Review of Util Responses to Ten Open Items Identified in Insp Rept 50-260/89-30,design Calculations Re Primary Containment & Four Issues Under Seismic Design Program IR 05000259/19890451989-11-0101 November 1989 Partially Withheld Insp Repts 50-259/89-45,50-260/89-45 & 50-296/89-45 on 890918-22 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Mgt Effectiveness, Records & Repts & Security Contingency Plan IR 05000260/19890391989-10-10010 October 1989 Insp Rept 50-260/89-39 on 890814-16.Violation Noted.Major Areas Inspected:Final GE Part 21 Evaluation & Open Items Identified in Insp Rept 50-260/89-31 IR 05000260/19890361989-09-21021 September 1989 Insp Rept 50-260/89-36 on 890828-0901.No Violations Noted. Major Areas Inspected:Small Bore Piping & Instrument Tubing Program IR 05000260/19890301989-09-18018 September 1989 Insp Rept 50-260/89-30 on 890313-24.No Violations Noted. Major Areas Inspected:Essential Design Calculations Under Civil Calculation Review Program IR 05000260/19880391989-06-17017 June 1989 Insp Rept 50-260/88-39 on 881219-22.Six Out of Eight Open Items Reviewed Closed.Major Areas Inspected:Techniques, Procedures & Criteria Used for Generating New Amplified Response Spectra (Ars) & Util Responses to Open Items IR 05000260/19890211989-06-14014 June 1989 Insp Rept 50-260/89-21 on 890123-24.Two of Three Items Reviewed During Insp Considered Closed.Major Areas Inspected:Responses to Three Open Items Identified in Insp Rept 50-260/88-38,including CSG-14,CSG-23 & CSG-26 IR 05000260/19890151989-05-17017 May 1989 Insp Rept 50-260/89-15 on 890123-0203.Open Item Noted Re Calculations Associated W/Ie Bulletins 79-14 & 79-02 on safety-related Piping.Major Areas Inspected:Design Criteria Documents & Calculations for safety-related Piping IR 05000259/19880361989-04-0707 April 1989 Insp Repts 50-259/88-36,50-260/88-36 & 50-296/88-36 on 81208-31.Violations Noted.Major Areas Inspected:Plant Operations,Mgt Control Over Plant Activities & Work Control Process to Determine Readiness for Fuel Load IR 05000259/19880351989-03-17017 March 1989 Insp Repts 50-259/88-35,50-260/88-35 & 50-296/88-35 on 881201-31.No Violations or Deviations Noted.Unresolved Items Noted Re Surveillance Testing & Missed Surveillance.Major Areas Inspected:Ros,Nrc Bulletins & Open Items IR 05000259/19890011989-03-0909 March 1989 Partially Withheld Insp Repts 50-259/89-01,50-260/89-01 & 50-296/89-01 on 890109-10.No Violations Noted.Major Areas Inspected:Corrective Actions to Notice of Violation & Program for Control & Accounting of SNM IR 05000259/19880271989-02-13013 February 1989 Insp Repts 50-259/88-27,50-260/88-27 & 50-296/88-27 on 880823-890106.No Violations or Deviations Noted.Major Areas Inspected:Seismic Qualifications,Cleanliness Controls,Fire Protection,Surveillance Testing & Instrumentation IR 05000259/19880331989-02-13013 February 1989 Insp Repts 50-259/88-33,50-260/88-33 & 50-296/88-33 on 881101-30.Violation Noted.Major Areas Inspected:Operational Safety Verification,Mods,Surveillance Observations,Sys Return to Svc,Status of 10CFR21 Repts & ROs IR 05000259/19880321989-02-0101 February 1989 Corrected Insp Repts 50-259/88-32,50-260/88-32 & 50-296/88-32 on 881001-31.Violations Noted.Major Areas Inspected:Operational Safety Verification,Surveillance Observation,Mods,Sys Return to Svc & ROs IR 05000259/19880311988-10-24024 October 1988 Insp Repts 50-259/88-31,50-260/88-31 & 50-296/88-31 on 880719-22 & 0907-08.No Violations or Deviations Noted.Major Areas Inspected:Plant Regulatory Performance Improvement Program Action Item Implementation IR 05000259/19880211988-10-21021 October 1988 Insp Repts 50-259/88-21,50-260/88-21 & 50-296-88-21 on 880701-31.Violation & Unresolved Items Noted.Major Areas Inspected:Operational Safety,Maint Observations,Surveillance Testing Observations & Restart Test Program IR 05000259/19880291988-09-28028 September 1988 Partially Withheld Insp Repts 50-259/88-29,50-260/88-29 & 50-296/88-29 on 880912-16 (Ref 10CFR2.790 & 73.21). Violations Noted in Area of Key Control.Major Areas Inspected:Security Organization,Records & Repts IR 05000259/19880261988-09-20020 September 1988 Insp Repts 50-259/88-26,50-260/88-26 & 50-296/88-26 on 880829-0902.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness,Including Programmatic Elements of Emergency Detection & Classification & Training IR 05000259/19880221988-09-19019 September 1988 Insp Repts 50-259/88-22 & 50-260/88-22 & 50-296/88-22 on 880711-15.Violations Noted.Major Areas Inspected:Assessment of New Employee Concern ML20154K9111988-09-0909 September 1988 Insp Repts 50-259/88-16,50-260/88-16 & 50-296/88-16 on 880501-0611.Violations Noted.Major Areas Inspected: Operational Safety,Maint Observation,Surveillance Testing Observation,Restart Test Program & Q-list Concerns IR 05000259/19880231988-09-0202 September 1988 Insp Repts 50-259/88-23,50-260/88-23 & 50-296/88-23 on 880801-05.No Violations or Deviations Noted.Major Areas Inspected:Organization & Mgt Controls in Radiation Protection & Radwaste & Control of Radioactive Matls IR 05000259/19880191988-08-22022 August 1988 Insp Repts 50-259/88-19,50-260/88-19 & 50-296/88-19 on 880620-24.No Violations or Deviations Noted.Major Areas Inspected:Mark I Containment Long Term Program Mod,Ie Bulletins 79-02 & 79-14 IR 05000259/19880201988-07-29029 July 1988 Partially Withheld Insp Repts 50-259/88-20,50-260/88-20 & 50-296/88-20 on 880627-0701 (Ref 10CFR2.790 & 73.21).No Violations Identified.Major Areas Inspected:Security Program,Security Organization & Security Program Audit IR 05000259/19880121988-06-20020 June 1988 Insp Repts 50-259/88-12,50-260/88-12 & 50-296/88-12 on 880502-06.No Violations or Deviations Noted.Major Areas Inspected:Mark I Containment Program Mod & IE Bulletins 79-02 & 79-14 IR 05000259/19880141988-06-0303 June 1988 Health Physics Insp Repts 50-259/88-14,50-260/88-14 & 50-296/88-14 on 880509-13.No Violations or Deviations Noted. Major Areas Inspected:Followup on Previous Enforcement Issues,Organization & Mgt Controls & Training IR 05000259/19880101988-06-0303 June 1988 Insp Repts 50-259/88-10,50-260/88-10 & 50-296/88-10 on 880401-30.Violation Noted.Major Areas inspected:Q-list, Operational Safety,Maint Observation,Surveillance Testing Observation,Ros & Restart Test Program IR 05000259/19880151988-05-31031 May 1988 Insp Repts 50-259/88-15,50-260/88-15 & 50-296/88-15 on 880506-10.No Violations or Deviations Noted.Major Areas Inspected:Ultrasonic Exam of Unit 2 Reactor Vessel Shroud Access Covers Per NRC Info Notice 88-003 & Unit 3 LERs IR 05000259/19880051988-05-11011 May 1988 Insp Repts 50-259/88-05,50-260/88-05 & 50-296/88-05 on 880301-31.Violations Noted.Major Areas Inspected:Operational Safety,Maint Observation,Surveillance Testing Observation, ROs & Plant Operations Review Committee IR 05000259/19880091988-04-22022 April 1988 Insp Repts 50-259/88-09,50-260/88-09 & 50-296/88-09 on 880404-08.No Violations or Deviations Noted.Major Areas Inspected:Review & Evaluation of Licensee Emergency Response Program ML20151V2851988-04-12012 April 1988 Insp Repts 50-259/88-06,50-260/88-06 & 50-296/88-06 on 880314-21.Violation Noted.Major Areas Inspected:Ultrasonic Exam of Unit 2 Reactor Vessel Shroud Access & Inservice Insp Status for Unit 2 & 3 ML20151H8431988-04-11011 April 1988 Insp Repts 50-259/88-08,50-260/88-08 & 50-296/88-08 on 880322-24.No Violations Noted.Major Areas Inspected: Competence of Operators in Group 4 Accelerated Requalification Training Course to Perform License Duties ML20150E5301988-03-24024 March 1988 Insp Repts 50-259/88-02,50-260/88-02 & 50-296/88-02 on 880101-31.Violations Noted.Major Areas Inspected:Open Insp Item Followup,Operational Safety,Maint Observation,Restart Test Program,Maint Improvement & Mgt Meetings ML20148K7461988-03-22022 March 1988 Insp Repts 50-259/88-04,50-260/88-04 & 50-296/88-04. Violations Noted.Major Areas Inspected:Operational Safety, Maint Observation,Surveillance Testing Observation, Ros,Previous Enforcement Action & Restart Test Program IR 05000259/19870451988-03-0707 March 1988 Insp Repts 50-259/87-45,50-260/87-45 & 50-296/87-45 on 871130-1204.Major Areas Inspected:Program for Layup & Preservation of Equipment.Three Unresolved Items,Including Layup & Monitoring of Standby Liquid Control Sys,Identified ML20151U8781988-03-0404 March 1988 Partially Withheld Insp Repts 50-259/88-01,50-260/88-01, 50-296/88-01,50-327/88-01 & 50-328/88-01 on 880106,07 & 13. (Ref 10CFR2.790(d) & 73.21).Major Areas Inspected:Corrective Measures in Response to Unresolved Item ML20150B9431988-02-11011 February 1988 Insp Repts 50-259/87-46,50-260/87-46 & 50-296/87-46 on 871201-31.Violation Noted.Major Areas Inspected:Previous Enforcement matters,multi-plant Action Item,War Room Meeting,Emergency Procedures & Cold Weather Preparations IR 05000259/19870361988-01-15015 January 1988 Insp Repts 50-259/87-36,50-260/87-36 & 50-296/87-36 on 871026-30.Util Design Baseline & Verification Program Contains Essential Elements Needed to Achieve Intended Goals & Objectives.Concerns Re Implementation of Program Listed IR 05000259/19870441987-12-11011 December 1987 Partially Withheld Insp Repts 50-259/87-44,50-260/87-44 & 50-296/87-44 on 871116-20 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Testing & Maint & Physical barriers-protected Areas IR 05000259/19870421987-12-11011 December 1987 Insp Repts 50-259/87-42,50-260/87-42 & 50-296/87-42 During Nov 1987.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety,Maint Observation,Reportable Occurrences & Previous Enforcement Matters IR 05000259/19870391987-12-10010 December 1987 Insp Repts 50-259/87-39,50-260/87-39 & 50-296/87-39 on 871103-05.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness Exercise,Involving NRC Observation of Key Functions & Locations During Exercise IR 05000259/19870411987-12-0707 December 1987 Insp Repts 50-259/87-41,50-260/87-41 & 50-296/87-41 on 871102-06.Violations Noted.Major Areas Inspected:Licensee Actions on Previous Enforcement Matters & Previously Identified Insp Findings & Corrective Action Program 1990-08-13 Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS MONTHYEARIR 05000259/19990041999-08-23023 August 1999
[Table view]Insp Repts 50-259/99-04,50-260/99-04 & 50-296/99-04 on 990613-0724.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000259/19990031999-07-0808 July 1999 Insp Repts 50-259/99-03,50-260/99-03 & 50-296/99-03 on 990502-0612.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance,Engineering,Plant Support & Licensee bi-annual Emergency Preparedness Exercise IR 05000259/19990021999-05-28028 May 1999 Insp Repts 50-259/99-02,50-260/99-02 & 50-296/99-02 on 990321-0501.Four Violation Noted & Being Treated as non-cited Violations.Major Areas Inspected:Aspects of Licensee Operation,Maint,Engineering & Plant Support IR 05000259/19990011999-04-15015 April 1999 Insp Repts 50-259/99-01,50-260/99-01 & 50-296/99-01 on 990207-0320.Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support.Also Insp,Licensee Emergency Preparedness & Security Programs IR 05000259/19980091999-03-0505 March 1999 Insp Repts 50-259/98-09,50-260/98-09 & 50-296/98-09 on 981227-990206.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support Re Plant Security ML18039A7201999-03-0505 March 1999 Notice of Violation from Insp on 981115-1226.Violation Noted:During Period of 981202-07,Procedure 2/3-SR-2 Not Adequately Established or Maintained IR 05000260/19980111999-01-30030 January 1999 Insp Repts 50-260/98-11 & 50-296/98-11 on 981116-1204. No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000259/19980081999-01-25025 January 1999 Insp Repts 50-259/98-08,50-260/98-08 & 50-296/98-08 on 981115-1226.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML18039A6791999-01-25025 January 1999 Notice of Violation from Insp on 981115-1226.Violation Noted:As of 981104,written Procedures Not Adequately Maintained in That SI O-SI-4.2.A-12 Did Not Provide Adequate Instructions for Testing Heater Flow Switch Relay Contacts ML18039A6521998-12-24024 December 1998 Notice of Violation from Insp on 981004-1114.Violation Noted:On 981014,licensee Failed to Comply with TS 3.0.4 When Specified Condition in Applicability of TS 3.5.1 Was Entered Without Meeting LCO IR 05000259/19980071998-12-0909 December 1998 Insp Repts 50-259/98-07,50-260/98-07 & 50-296/98-07 on 981004-1114.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000259/19980061998-11-0202 November 1998 Insp Repts 50-259/98-06,50-260/98-06 & 50-296/98-06 on 980823-1023.Violation Noted.Major Areas Inspected:Operation, Maint,Engineering & Plant Support ML18039A6001998-11-0202 November 1998 Notice of Violation from Insp on 980823-1003.Violation Noted:Until 980828,written Procedures Not Adequately Maintained IR 05000259/19980121998-10-22022 October 1998 Partially Withheld Insp Repts 50-259/98-12,50-260/98-12 & 50-296/98-12 on 980928-1002.No Violations Noted.Major Areas Inspected:Plant Support,Physical Security Program for Power Reactors IR 05000259/19980051998-09-18018 September 1998 Insp Repts 50-259/98-05,50-260/98-05 & 50-296/98-05 on 980712-0822.No Violations Noted.Major Areas Inspected: Operations,Maint & Engineering IR 05000259/19980041998-08-0707 August 1998 Insp Repts 50-259/98-04,50-260/98-04 & 50-296/98-04 on 980524-0711.No Violations Noted.Major Areas Inspected: Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000259/19980031998-06-16016 June 1998 Insp Repts 50-259/98-03,50-260/98-03 & 50-296/98-03 on 980412-0523.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maint & Plant Support.Addl Rept Includes GL 89-01 Implementation of Motor Operated Valve ML18039A3751998-05-21021 May 1998 SALP Repts 50-259/98-99,50-260/98-99 & 50-296/98-99 for 960908-980418 ML18039A3471998-05-0505 May 1998 Notice of Violations from Insp on 980301-0411.Violations Noted:Written Procedures Not Implemented in That Model TDA-5A (or Equivalent) DOP Generator Not Used to Perform Testing ML18039A3481998-05-0505 May 1998 Insp Repts 50-259/98-02,50-260/98-02 & 50-296/98-02 on 980301-0411.Violations Noted.Major Areas Inspected: Operations,Engineering,Maint & Plant Support IR 05000259/19980011998-03-24024 March 1998 Insp Repts 50-259/98-01,50-260/98-01 & 50-296/98-01 on 980118-0228.No Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML18039A2531998-02-12012 February 1998 Insp Repts 50-259/97-12,50-260/97-12 & 50-296/97-12 on 971207-980117.Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML18039A2331998-01-0202 January 1998 Insp Repts 50-259/97-11,50-260/97-11 & 50-296/97-11 on 971026-1206.Violations & Deviations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML18039A2311998-01-0202 January 1998 Notice of Violation from Insp on 971026-1206.Violations Noted:On 971119,trend Rept Required by Procedure MMDP-5 & Site Std Prace SSP-6.51 Had Not Been Prepared IR 07100026/20120061998-01-0202 January 1998 Notice of Deviation from Insp on 971026-1206.Deviation Noted:On 971117:applicable Instructions for Certain Valves Were Not Revised to Incorporate Requirement ML18038C0031997-11-24024 November 1997 Notice of Violation from Insp on 970914-1025.Violation Noted:Between 970824-28,while in Condition Requiring Primary Containment Integrity,Inoperable Containment Isolation Valve 3-FCV-64-34 Not Restored to Operable Status within 4 Hours ML18038C0041997-11-24024 November 1997 Insp Repts 50-259/97-10,50-260/97-10 & 50-296/97-10. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint,Plant Support,Radiological Controls & Fire Protection ML18038B9791997-10-0808 October 1997 Insp Repts 50-259/97-09 50-260/97-09 & 50-296/97-09 on 970803-0913.Violations Noted.Major Areas Inspected: Licensee Operations,Engineering,Maint & Plant Support ML18038B9781997-10-0808 October 1997 Notice of Violation from Insp on 970903-0913.Violation Noted:Snubber Functional Testing Was Not Being Performed During Refueling Outage ML18038B9431997-08-29029 August 1997 Notice of Violation from Insp on 970622-0802.Violation Noted:On 960520,SE Was Not Prepared for Plant Mod Dcn S39677A Which Revised Load Limitation Notes on Drawings 0-45E732-1 & 0-45E732-3 (FSAR Figures 8.5-12A & 8.5-13A) ML18038B9441997-08-29029 August 1997 Insp Repts 50-259/97-08,50-260/97-08 & 50-296/97-08 on 970622-0802.Violation Noted.Major Areas Inspected: Operations,Engineering,Maint & Plant Support IR 05000259/19970061997-07-21021 July 1997 Insp Repts 50-259/97-06,50-260/97-06 & 50-296/97-06 on 970602-06.Violations Noted.Major Areas Inspected.Observation & Evaluation of Biennial Emergency Preparedness Exercise ML18038B9181997-07-17017 July 1997 Insp Repts 50-259/97-07,50-260/97-07 & 50-296/97-07 on 970511-0621.Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support PNO-II-97-014, on 970305,Unit 3 Experienced Loss of Offsite Power & Declared Notification of Unusual Event.Unit 2 Operating at 100 Percent During Event & Unaffected.Unit 1 in Long Term Shutdown Condition & Also Unaffected1997-03-0505 March 1997 PNO-II-97-014:on 970305,Unit 3 Experienced Loss of Offsite Power & Declared Notification of Unusual Event.Unit 2 Operating at 100 Percent During Event & Unaffected.Unit 1 in Long Term Shutdown Condition & Also Unaffected ML20138M0061997-01-13013 January 1997 EN-97-003:notice of Order Prohibiting Involvement in NRC- Licensed Activities (Effective Immediately) Issued to Jr Byrum.Action Based on NRC Investigation & Testimony Before DOL IR 05000260/19960991996-10-16016 October 1996 SALP Repts 50-260/96-99 & 50-296/96-99 for Period 950319- 960907 ML20129D2931996-07-19019 July 1996 Notice of Violation from Insp on 960617-20.Violation Noted: During Test,Two Members of Security Force Failed to Detect Firearm Visible on x-ray & Take Action to Neutralize Possibility of Threat After Identifying Part of Firearm IR 05000259/19960071996-07-19019 July 1996 Partially Withheld Insp Repts 50-259/96-07,50-260/96-07 & 50-296/96-07 on 960617-21 (Ref 10CFR73.21(c)(2)).Violations Noted.Major Areas Inspected:Aspects of Security Program for Power Reactors,Including Detection & Assessment Aids ML20205C6581996-02-14014 February 1996 Notice of Violation from Secretary of Labor Decision & Order .Violation Noted:On 930202 & 04,SWEC,discriminated Against D Harrison for Engaging in Protected Activities IR 05000259/19930371993-11-0303 November 1993 Partially Withheld Insp Repts 50-259/93-37,50-260/93-37 & 50-296/93-37 on 931004-08.Noncited Violation Identified. Major Areas Inspected:Security Program Plans,Alarm Station & Communication,Access Controls & Personnel IR 05000259/19930091993-05-26026 May 1993 Partially Withheld Insp Repts 50-259/93-09,50-260/93-09 & 50-296/93-09 on 930426-30 (Ref 10CFR73.21).Violation Noted But Not Cited.Major Areas Inspected:Physical Security Program for Power Reactors IR 05000259/19930061993-03-18018 March 1993 Insp Repts 50-259/93-06,50-260/93-06 & 50-296/93-06 on 930222-26.Non-cited Violations Noted.Major Areas Inspected: Mgt Support,Physical Barriers,Protected & Vital Areas,Access Control & Security Communications.Partially Withheld PNO-II-91-039, on 910625,licensee Mgt Completed Third Mgt Assessment After Completion of HPCI & RCIC Quick Start Testing1991-06-26026 June 1991 PNO-II-91-039:on 910625,licensee Mgt Completed Third Mgt Assessment After Completion of HPCI & RCIC Quick Start Testing IR 05000259/19910141991-04-22022 April 1991 Insp Repts 50-259/91-14,50-260/91-14 & 50-296/91-14 on 910325-29.No Violations Noted.Major Areas Inspected:Valve Operators,Level Switches,Temp Elements,Level Transmitters, Flow Switches,Terminal Blocks & Junction Boxes IR 05000259/19910121991-04-16016 April 1991 Insp Repts 50-259/91-12,50-260/91-12 & 50-296/91-12 on 910315-20.No Violations Noted.Major Areas Inspected:Test Procedures,Test Preparation,Test Performance & Test Results of Primary Containment Integrated Leak Rate Test IR 05000259/19910021991-03-18018 March 1991 Insp Repts 50-259/91-02,50-260/91-02 & 50-296/91-02 on 910119-0215.Non-cited Violations Noted.Major Areas Inspected:Surveillance,Maint,Operational Safety,Mods,Post Mod Testing,Esfs Walkdown,Standby Liquid Control & Mgt IR 05000259/19910051991-02-22022 February 1991 Insp Repts 50-259/91-05,50-260/91-05 & 50-296/91-05 on 910129-0201.No Violations Noted.Major Areas Inspected: External Exposure,Dose Reduction Initiatives,Alara & Contamination Control PNO-II-91-003, on 910221,Unit 2 Started Reloading Core.Unit Defueled to Allow Mods to Be Performed During Extended Shutdown.Nrc Monitoring Fuel Load w/24 H Coverage1991-02-21021 February 1991 PNO-II-91-003:on 910221,Unit 2 Started Reloading Core.Unit Defueled to Allow Mods to Be Performed During Extended Shutdown.Nrc Monitoring Fuel Load w/24 H Coverage IR 05000259/19900221990-12-10010 December 1990 Insp Repts 50-259/90-22,50-260/90-22 & 50-296/90-22 on 900625-29.No Violations Noted.Major Areas Inspected:Followup of BFN Implementation of EQ Program to Comply W/Requirements of 10CFR50.49 IR 05000259/19900201990-08-13013 August 1990 Insp Repts 50-259/90-20,50-260/90-20 & 50-296/90-20 on 900625-29 & 0709-13.No Violations or Deviations Noted.Major Areas Inspected:Corrective Action Program Implementation & Quality Verification Activities 1999-08-23 |
Inspection Report - Browns Ferry - 1986021 | |
---|---|
Text
I SAFEGUARDS 11NFORMATN p,os'o,*
NUCLEAR REGULATORY COMMISSION p
"
~*
REGION 11
,
hI)
,
101 MARIETTA STREET. N.W.
?
- I e
ATL ANTA, GEORGI A 30323
'
%. 7.. #
JUL 2 31986 Report Nos.
50-259, 50-260, and 50-296/86-21 Licensee:
Tennessee Valley Authority 6N38A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801 Docket Nos.
50-259, 50-260, and 50-296 License Nos.
DPR-33, DPR-52 and DPR-68 Facility Name:
Brown's Ferry Units 1, 2, and 3 Inspection Conducted:
June 16-20, 1986 Inspectors:
ad
-
11 h'
7 /[
D. H. Thomps'on, Physical Spcurity Specialist
/ Dat6 Signed hkbmZr)$44ut 9/ W F-d AT an, sical Secur7ty Inspector
' Date S1'gned Approved by:
)^
[/
D. R.'McGuife, Chief, Physical Security Section
/D5td Signed Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY Scope:
This routine, unannounced inspection was conducted by two inspectors and consisted of a review of the licensee's: security program audit; records and reports; testing and maintenance; physical barriers - vital areas; security systems power supply; alarm stations; and personnel training and qualifications general requirements.
Results:
The licensee was found to be in compliance with regulatory requirements within the seven areas inspected.