IR 05000259/1986038
ML20207T958 | |
Person / Time | |
---|---|
Site: | Browns Ferry |
Issue date: | 03/02/1987 |
From: | Zech G NRC OFFICE OF SPECIAL PROJECTS |
To: | White S TENNESSEE VALLEY AUTHORITY |
References | |
NUDOCS 8703240443 | |
Download: ML20207T958 (2) | |
Similar Documents at Browns Ferry | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML18039A9011999-10-15015 October 1999
[Table view]Forwards RAI Re 990423 Submittal of Proposed risk-informed ISI Program for Plant,Unit 3.Response Requested by 991101 ML20217E0711999-10-14014 October 1999 Grants Approval for Util to Submit Original,One Signed Paper Copy & Six CD-ROM Copies of Updates to FSAR as Listed,Per 10CFR50.4(c),in Response to ML20217D3261999-10-0808 October 1999 Responds to Re Event Concerning Spent Fuel Pool Water Temperature Being Undetected for Approx Two Days at Browns Ferry Unit 3 ML18039A8881999-10-0808 October 1999 Provides Licensee Supplemental Response to NRC 980713 RAI Re GL 87-02,Suppl 1, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors ML18039A8851999-10-0808 October 1999 Responds to Ltr of 990903 Re Event Last Year at Browns Ferry Unit 3,where Rise in Spent Fuel Pool Water Temp Went Undetected for Approx Two Days.Record Copy ML20217F7751999-10-0808 October 1999 Confirms 991006 Telcon Between T Abney of Licensee Staff & a Belisle of NRC Re Meeting to Be Conducted on 991109 in Atlanta,Ga to Discuss Various Maintenance Issues ML20217B5481999-10-0101 October 1999 Requests Exception to 10CFR50.4(c) Requirement to Provide Total of Twelve Paper Copies When Submitting Revs to BFN UFSAR IR 05000259/19990051999-10-0101 October 1999 Forwards Insp Repts 50-259/99-05,50-260/99-05 & 50-296/99-05 on 990725-0904.No Violations Noted.Conduct of Activities at Browns Ferry Nuclear Facility Generally Characterized by safety-conscious Operations & Sound Engineering ML20212M1481999-09-28028 September 1999 Refers to Management Meeting Conducted on 990927 at Region II for Presentation of Recent Plant Performance.List of Attendees & Copy of Presentation Handout Encl ML18039A8731999-09-23023 September 1999 Forwards Suppl to Ser,Approving Amends 259 & 218 to Licenses DPR-52 & DPR-68 Re Approval of 14-day Allowable Outage Time for Emergency Diesel Generators.Suppl Issued to Correct Error Contained in Original SER ML20212F7751999-09-22022 September 1999 Requests Operator & Senior Operator License Renewals for Listed Individuals and Licenses ML20212D3651999-09-20020 September 1999 Forwards SE Accepting Licensee 990430 Proposed Rev to Plant, Unit 3 Matl Surveillance Program ML18039A8721999-09-10010 September 1999 Informs of Licensee Decision to Withdraw Proposed Plant risk-informed Inservice Insp Program,Originally Transmitted in Util .Licensee Expects to Resubmit Revised Program within Approx 6 Wks ML20211Q5731999-09-0909 September 1999 Submits Response to Administrative Ltr 99-03 Re Preparation & Scheduling of Operator Licensing Exams.Completed NRC Form 536,operator Licensing Exam Data,Which Provides Plant Current Schedules for Specific Info Requested Encl ML20211G6491999-08-26026 August 1999 Confirms Telcon with T Abney on 990824 Re Mgt Meeting Which Has Been re-scheduled from 990830-0927.Purpose of Meeting to Discuss BFN Status & Performance ML18039A8581999-08-23023 August 1999 Forwards Insp Repts 50-259/99-04,50-260/99-04 & 50-296/99-04 on 990613-0724 at Browns Ferry Npp.Four Violations Identified & Being Treated as non-cited Violations ML18039A8411999-08-12012 August 1999 Informs of Completion of Acceptance Review of Proposed risk- Based ISI Program for Browns Ferry Unit 3.Determined Application Suitable for Further Evaluation.Suggests That 981023 Application Be Withdrawn & New Application Prepared ML20210Q6931999-08-0909 August 1999 Forwards Updated Changes to Distribution Lists for Browns Ferry & Bellefonte Nuclear Plants ML18039A8371999-08-0606 August 1999 Forwards BFN Unit 2 Cycle 10 ASME Section XI NIS-1 & NIS-2 Data Repts, for NRC Review.Corrected Inservice Insp Summary Rept for Unit 3 Cycle 8 Operation,Included in Rept ML20210Q4421999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006. Authorized Representative of Facility Must Submit Ltr with List of Individuals to Take exam,30 Days Before Exam Date ML18039A8341999-08-0303 August 1999 Discusses Info Provided by TE Abney on 990330 Re Reanalysis of Control Room,Site Boundary & Low Population Zone Doses. Forwards Safety Evaluation,Which Supplements 980811 Safety Evaluation,Supporting New Dose Caluculations ML20210N1051999-08-0202 August 1999 Forwards SE Accepting Licensee 990326 Request for Relief from ASME B&PV Code,Section XI Requirements.Request for Relief 3-ISI-7,pertains to Second 10-year Interval ISI for Plant,Unit 3 ML18039A8291999-08-0202 August 1999 Forwards Amends 259 & 218 to Licenses DPR-52 & DPR-68, Respectively.Amends Change TS Completion Time for Required Action 3.8.1.B.4 from Existing 7 to 14 Days ML20210G8991999-07-28028 July 1999 Discusses 990726 Open Mgt Meeting for Discussion on Plant Engineering Status & Performance.List of Attendees & Presentation Handout Encl 05000296/LER-1999-004, Forwards LER 99-004-00 Re Inoperability of Two Divisions of Plant CSS Due to Personnel Error During Surveillance Testing.Event Reported Per 10CFR50.73(a)(2)(i)(B)1999-07-26026 July 1999 Forwards LER 99-004-00 Re Inoperability of Two Divisions of Plant CSS Due to Personnel Error During Surveillance Testing.Event Reported Per 10CFR50.73(a)(2)(i)(B) ML20210F3031999-07-22022 July 1999 Submits Rept Re Impact of Changes or Errors in Methodology Used to Demonstrate Compliance with ECCS Requirements of 10CFR50.46.One Reportable non-significant Error Was Found During Time Period of 980601-990630 ML20210G8051999-07-22022 July 1999 Discusses DOL Case DC Smith Vs TVA Investigation.Oi Concluded That There Was Not Sufficient Evidence Developed During Investigation to Substantiate Discrimination.Nrc Providing Results of OI Investigation to Parties ML20209J0251999-07-16016 July 1999 Forwards SE Which Constitutes Staff Review & Approval of TVA Ampacity Derating Test & Analyses for Thermo-Lag Fire Barrier Configurations as Required in App K of Draft Temporary Instruction, Fpfi, ML20210B2671999-07-14014 July 1999 Confirms 990702 Telcon Between T Abney of Licensee Staff & Author Re Mgt Meeting Scheduled for 990830 at Licensee Request in Atlanta,Ga to Discuss Browns Ferry Nuclear Plant Status & Performance ML18039A8131999-07-0808 July 1999 Forwards Insp Repts 50-259/99-03,50-260/99-03 & 50-296/99-03 on 990502-0612.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20209E3421999-07-0707 July 1999 Confirms Arrangements Made During 990628 Telephone Conversation to Hold Meeting on 990726 in Atlanta,Ga to Discuss Plant Engineering Status & Performance ML20209E5511999-07-0707 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1 & Suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2.This Closes TACs MA1180,MA1181 & MA1179 ML20196J3531999-06-30030 June 1999 Responds to Re Boeing Rocket Booster Mfg Facility Being Constructed in Decatur,Al.Nrc Has No Unique Emergency Planning Concerns Re Proximity of Boeing Facility to BFN 05000260/LER-1999-004, Forwards LER 99-004-00 Re Esfas That Occurred When RPS Motor Generator Tripped.Rept Is Submitted IAW Provisions of 10CFR50.73(a)(2)(iv) as Event of Condition That Resulted in Automatic Actuation of ESF1999-06-28028 June 1999 Forwards LER 99-004-00 Re Esfas That Occurred When RPS Motor Generator Tripped.Rept Is Submitted IAW Provisions of 10CFR50.73(a)(2)(iv) as Event of Condition That Resulted in Automatic Actuation of ESF ML20196G9111999-06-28028 June 1999 Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits ML18039A8111999-06-25025 June 1999 Requests Permanent Relief from Inservice Insp Requirements of 10CFR50.55a(g) for Volumetric Exam of Bfn,Unit 3 Circumferential RPV Welds,Per GL 98-05 ML20196F8741999-06-23023 June 1999 Forwards Safety Evaluation Accepting Util Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves 05000260/LER-1999-003, Forwards LER 99-003-00,re Automatic Reactor Scram Due to Turbine Trip.Rept Numbered 99-001 Should Be Deleted & Replaced with Encl Rept as Result of Error Noted in 990614 Rept1999-06-22022 June 1999 Forwards LER 99-003-00,re Automatic Reactor Scram Due to Turbine Trip.Rept Numbered 99-001 Should Be Deleted & Replaced with Encl Rept as Result of Error Noted in 990614 Rept ML20196F8131999-06-22022 June 1999 Forwards Rev 24 to Security Personnel Training & Qualification Plan,Per 10CFR50.54(p).Rev Withheld ML18039A8031999-06-18018 June 1999 Responds to NRC Staff Verbal Request Re TS Change TS-376, Originally Submitted on 970312, & Proposed Changes to TS to Extend Current 7-day AOT for EDGs to 14 Days ML18039A7931999-06-0101 June 1999 Provides Summary of Major Activities Performed at BFN During Scheduled Unit 2 Cycle 10 Refueling Outage ML20195D3321999-06-0101 June 1999 Informs That Cb Fisher,License OP-5525-4,can No Longer Maintain License at Plant Because of Physical Condition That Causes Licensee to Fail to Meet Requirements of 10CFR55.21 ML18039A7941999-05-28028 May 1999 Forwards Insp Repts 50-259/99-02,50-260/99-02 & 50-296/99-02 on 990321-0501.Four Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML18039A7891999-05-24024 May 1999 Informs That Oscillation Power Range Monitor Module Has Been Enabled for Current Cycle of Operation Following Unit 2 Cycle 10 Refueling Outage Which Was Completed on 990509 ML20195B9361999-05-24024 May 1999 Informs That Do Elkins,License SOP-3392-6,no Longer Needs to Maintain License as Position Does Not Require License ML18039A7911999-05-24024 May 1999 Informs That by Meeting Test Criteria Established by Test Based on Ansi/Ans 3.5-1985 (License Amends 254 & 214) power- Uprate Simulation Acceptable for Operator Training ML18039A7811999-05-21021 May 1999 Forwards SER Authorizing Util 970122 & 980612 Second 10-year Interval Inservice Insp Plan for Browns Ferry Nuclear Plant, Unit 3 & Associated Requests for Relief 3-ISI-3 & 3-ISI-6 ML20206U6551999-05-14014 May 1999 Informs That ML Meek & Wd Dawson Will No Longer Need to Maintain SRO Licenses at Plant,Due to Termination of Employment,Effective 990521 ML20206Q8421999-05-10010 May 1999 Forwards Medical Info on DM Olive,License SOP-20540-2,in Response to NRC 990428 Telcon.Encl Withheld from Public Disclosure IAW 10CFR2.790(a)(6) 05000296/LER-1999-003, Forwards LER 99-003-00,providing Details Re Plant HPCI Sys Being Declared Inoperable Due to Loose Electrical Connection.Ltr Contains No Commitments1999-05-0606 May 1999 Forwards LER 99-003-00,providing Details Re Plant HPCI Sys Being Declared Inoperable Due to Loose Electrical Connection.Ltr Contains No Commitments 1999-09-09 Category:NRC TO UTILITY MONTHYEARML20062E6601990-11-13013 November 1990
[Table view]Confirms Arrangements for 901119 Mgt Meeting at Plant Site to Discuss Unit 2 Restart & Project Plan & Separation of Units 1 & 3 from Unit 2.Proposed Meeting Agenda Encl ML20217A5361990-11-13013 November 1990 Confirms Arrangements for 901119 Mgt Meeting at Plant Site to Discuss Shutdown from Outside Control Room Test to Be Conducted in Startup Test Program ML20062D5421990-11-0707 November 1990 Forwards List of Unimplemented Generic Safety Issues at Facilities,Per Generic Ltr 90-04 IR 05000259/19890271990-11-0202 November 1990 Advises That Corrective Actions for Conditions Described in LER 89-09 Adequate,Per Insp Repts 50-259/89-27,50-260/89-27 & 50-296/89-27 ML18033B5471990-11-0101 November 1990 Ack Receipt of 901016 Response to Violations Noted in Insp Repts 50-259/90-25,50-260/90-25 & 50-296/90-25 ML18033B5251990-10-15015 October 1990 Forwards Insp Repts 50-259/90-28,50-260/90-28 & 50-296/90-28 on 900917-21.No Violations or Deviations Noted ML20062B2371990-10-12012 October 1990 Requests That Analyses of Liquid Samples Spiked W/ Radionuclides Be Completed as Soon as Practicable,But No Later than 60 Days from Receipt of Samples.Results Should Be Sent to DM Collins at Listed Address ML18033B5191990-09-27027 September 1990 Requests Addl Info Re Tech Spec Amend Concerning Reactor Protection Sys Circuit Protector Trip Level Setpoints.Info Should Be Provided by 901024 ML20059M8281990-09-14014 September 1990 Confirms Conversation Between P Carier,Pj Kellogg on 900910 Re Management Meeting Scheduled for 900921 IR 05000259/19900181990-08-30030 August 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-259/90-18, 50-260/90-18 & 50-296/90-18 IR 05000260/19890421990-08-22022 August 1990 Forwards SER Re Util Responses to Open Item CSG-9 Documented in Insp Rept 50-260/89-42 Re HVAC Ductworks & Supports for Plant.New Amplified Spectra Impact Evaluation Meets Restart Requirements for Unit IR 05000259/19900071990-08-20020 August 1990 Forwards 900709 SALP Presentation Slides Re SALP Insp Repts 50-259/90-07,50-260/90-07 & 50-296/90-07.Progress in Each Area of SALP Will Be Monitored by Ongoing Insp Program Supporting Unit 2 Startup ML18033B4951990-08-17017 August 1990 Forwards Summary of 900710-11 Meetings W/Util Re Primary Containment Isolation at Plant & Requests That Util Formally Respond within 30 Days to NRC Recommendations During Exit Meeting ML20058Q1191990-08-13013 August 1990 Forwards Insp Repts 50-259/90-20,50-260/90-20 & 50-296/90-20 on 900625-29 & 0709-13.No Violations or Deviations Noted ML20058N8001990-08-13013 August 1990 Requests Provision of Listed Info Prior to Restart of Units 1 & 3.Performance of PRA for Unit 2 in Manner That Takes Into Account Dependencies to Equipment Located in Other Two Units Also Requested ML20058Q1901990-08-13013 August 1990 Ack Receipt of 900705 & 0802 Ltrs,Transmitting Objectives & Scenario Package,Respectively,For Exercise Scheduled for Wk of 900917 ML18033B4661990-08-0303 August 1990 Forwards Listing of Outstanding Util Submittals Required to Support Resolution of Remaining Licensing Actions Necessary for Restart of Unit 2 ML20056A6101990-08-0202 August 1990 Advises of Closure of NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Box Bow, Per Util ML18033B4581990-07-31031 July 1990 Forwards Safety Evaluation Re Util Assessment of Mgt Problems & Corrective Actions Described in Facility Nuclear Performance Plan,Vol 3,Rev 2.Corrective Actions Implemented by Util Consistent W/Commitments Made by Subj Plan ML20055H8851990-07-25025 July 1990 Considers 900425 Request for Approval to Eliminate Site Local Recovery Ctrs Withdrawn.Review Terminated IR 05000259/19900141990-07-25025 July 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-259/90-14, 50-260/90-14 & 50-296/90-14.Implementation of Corrective Actions Will Be Examined During Future Insps ML18033B4461990-07-13013 July 1990 Forwards Insp Repts 50-259/90-19,50-260/90-19 & 50-296/90-19 on 900604-14.No Violations or Deviations Identified ML18033B4261990-07-0202 July 1990 Forwards Insp Repts 50-259/90-21,50-260/90-21 & 50-296/90-21 on 900618-22.No Violations or Deviations Noted ML20044B1191990-06-22022 June 1990 Confirms 900709 Mgt Meeting at Site to Review Results of SALP Program for Facility for Period 890103-0331 ML18033B4061990-06-20020 June 1990 Ack Receipt of 900604 Response to Violations Noted in Insp Repts 50-259/90-08,50-260/90-08 & 50-296/90-08 ML18033B4011990-06-14014 June 1990 Forwards Insp Repts 50-259/90-14,50-260/90-14 & 50-296/90-14 on 900416-0518 & Notice of Violation ML18033B3731990-06-14014 June 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Stated in 900502 Notice of Violation & Proposed Imposition of Civil Penalty & Payment of Civil Penalty in Amount of $18,750 ML20059M8551990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl IR 05000259/19900051990-06-12012 June 1990 Ack Receipt of 900518 Response Re Violations Noted in Insp Repts 50-259/90-05,50-260/90-05 & 50-296/90-05. Implementation of Corrective Actions Will Be Examined During Future Insps IR 05000259/19890161990-06-12012 June 1990 Ack Receipt of Responding to Violations Noted in Insp Repts 50-259/89-16,50-260/89-16 & 50-296/89-16 ML20055C7691990-06-12012 June 1990 Advises That 900615 SALP Meeting Cancelled Until Later Date IR 05000259/19890531990-06-0101 June 1990 Ack Receipt of Denying Violation B & Admitting Violation a as Different Violation Per Insp Repts 50-259/89-53,50-260/89-53 & 50-296/89-53.Violation B Occurred as Originally Stated Based on Encl Evaluation ML20043E2841990-05-31031 May 1990 Confirms 900615 Mgt Meeting to Review Results of SALP Program for Plant ML20043C0391990-05-30030 May 1990 Forwards Safety Evaluation Requesting Util Revise Procedures Generation Package ML18033B2931990-05-0404 May 1990 Forwards Insp Repts 50-259/90-08,50-260/90-08 & 50-296/90-08 on 900316-0416 & Notice of Violation IR 05000259/19890561990-05-0303 May 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in Insp Repts 50-259/89-56, 50-260/89-56 & 50-296/89-56.Implementation of Actions Will Be Examined During Future Insps IR 05000259/19890551990-05-0202 May 1990 Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $18,750,per Insp Repts 50-259/89-55, 50-260/89-55 & 50-296/89-55.Violation Involves Failure to Perform Adequate Inventory ML18033B2861990-04-26026 April 1990 Forwards Insp Repts 50-259/90-09,50-260/90-09 & 50-296/90-09 on 900326-30.No Violations or Deviations Noted IR 05000259/19890571990-04-26026 April 1990 Ack Receipt of Re Violations Noted in Insp Repts 50-259/89-57,50-260/89-57 & 50-296/89-57.Corrective Actions Incomplete ML20034C4571990-04-26026 April 1990 Forwards Insp Repts 50-259/90-12,50-260/90-12 & 50-296/90-12 on 900404 & Notice of Violation.Notice of Violation Withheld (Ref 10CFR2.790(d) & 73.21) ML18033B2781990-04-25025 April 1990 Advises That 880624 & 890201 & 0804 Applications for Amends to Licenses Denied,Per Failure to Respond to NRC Request for Addl Info ML20042E1291990-04-0505 April 1990 Forwards Summary of 900329 Meeting Re Util Radiological Safety Program & NRC Insp & Enforcement Program.Viewgraphs Encl ML18033B2381990-03-26026 March 1990 Forwards Insp Repts 50-259/89-56,50-260/89-56 & 50-296/89-56 on 891211-900209 & Notice of Violation.Util Attention Invited to Weaknesses Identified in Areas Including Deficiency Tagging,Communications & Drawing Discrepancies ML20042D7051990-03-23023 March 1990 Advises of Operator & Senior Operator Exams Scheduled for Wk of 900625.All Completed Application Info Should Be Submitted at Least 30 Days Before First Exam Dates in Order to Review Training & Experience of Candidates ML18033B2291990-03-20020 March 1990 Forwards Insp Repts 50-259/90-03,50-260/90-03 & 50-296/90-03 on 900115-0216.Violations Noted But Not Cited ML20012C7971990-03-19019 March 1990 Provides Examples of Weaknesses in Procedure Development Guidance at Plant,Per Dec 1989 Review.Encl Illustrates That Undesirable Procedure Variations Can Be Due to Insufficient Guidance &/Or Lack of Conformance to Existing Guidance ML20012E2441990-03-14014 March 1990 Forwards Insp Repts 50-259/90-04 & 50-260/90-04 & 50-296/90-04 on 900205-09.No Violations or Deviations Noted ML18033B2111990-03-13013 March 1990 Forwards Insp Repts 50-259/90-01,50-260/90-01 & 50-296/90-01 on 900115-0216.Violations Noted But Not Cited ML20012B6841990-03-0101 March 1990 Forwards Summary of Enforcement Conference on 900214 to Discuss Apparent Weaknesses in Corrective Actions to Correct Problems W/Control of SNM at Plant.List of Attendees & Handout Presented at Meeting Also Encl ML20012B9141990-02-26026 February 1990 Forwards Insp Rept 50-260/89-42 on 891106-10.Requests That Listed Open Item Issues Be Resolved & Results of Resolution Be Provided for Staff Review Prior to Plant Restart 1990-09-27 Category:OUTGOING CORRESPONDENCE MONTHYEARML18039A9011999-10-15015 October 1999
[Table view]Forwards RAI Re 990423 Submittal of Proposed risk-informed ISI Program for Plant,Unit 3.Response Requested by 991101 ML20217E0711999-10-14014 October 1999 Grants Approval for Util to Submit Original,One Signed Paper Copy & Six CD-ROM Copies of Updates to FSAR as Listed,Per 10CFR50.4(c),in Response to ML20217D3261999-10-0808 October 1999 Responds to Re Event Concerning Spent Fuel Pool Water Temperature Being Undetected for Approx Two Days at Browns Ferry Unit 3 ML18039A8851999-10-0808 October 1999 Responds to Ltr of 990903 Re Event Last Year at Browns Ferry Unit 3,where Rise in Spent Fuel Pool Water Temp Went Undetected for Approx Two Days.Record Copy ML20217F7751999-10-0808 October 1999 Confirms 991006 Telcon Between T Abney of Licensee Staff & a Belisle of NRC Re Meeting to Be Conducted on 991109 in Atlanta,Ga to Discuss Various Maintenance Issues IR 05000259/19990051999-10-0101 October 1999 Forwards Insp Repts 50-259/99-05,50-260/99-05 & 50-296/99-05 on 990725-0904.No Violations Noted.Conduct of Activities at Browns Ferry Nuclear Facility Generally Characterized by safety-conscious Operations & Sound Engineering ML20212M1481999-09-28028 September 1999 Refers to Management Meeting Conducted on 990927 at Region II for Presentation of Recent Plant Performance.List of Attendees & Copy of Presentation Handout Encl ML18039A8731999-09-23023 September 1999 Forwards Suppl to Ser,Approving Amends 259 & 218 to Licenses DPR-52 & DPR-68 Re Approval of 14-day Allowable Outage Time for Emergency Diesel Generators.Suppl Issued to Correct Error Contained in Original SER ML20212D3651999-09-20020 September 1999 Forwards SE Accepting Licensee 990430 Proposed Rev to Plant, Unit 3 Matl Surveillance Program ML20211G6491999-08-26026 August 1999 Confirms Telcon with T Abney on 990824 Re Mgt Meeting Which Has Been re-scheduled from 990830-0927.Purpose of Meeting to Discuss BFN Status & Performance ML18039A8581999-08-23023 August 1999 Forwards Insp Repts 50-259/99-04,50-260/99-04 & 50-296/99-04 on 990613-0724 at Browns Ferry Npp.Four Violations Identified & Being Treated as non-cited Violations ML18039A8411999-08-12012 August 1999 Informs of Completion of Acceptance Review of Proposed risk- Based ISI Program for Browns Ferry Unit 3.Determined Application Suitable for Further Evaluation.Suggests That 981023 Application Be Withdrawn & New Application Prepared ML20210Q4421999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006. Authorized Representative of Facility Must Submit Ltr with List of Individuals to Take exam,30 Days Before Exam Date ML18039A8341999-08-0303 August 1999 Discusses Info Provided by TE Abney on 990330 Re Reanalysis of Control Room,Site Boundary & Low Population Zone Doses. Forwards Safety Evaluation,Which Supplements 980811 Safety Evaluation,Supporting New Dose Caluculations ML18039A8291999-08-0202 August 1999 Forwards Amends 259 & 218 to Licenses DPR-52 & DPR-68, Respectively.Amends Change TS Completion Time for Required Action 3.8.1.B.4 from Existing 7 to 14 Days ML20210N1051999-08-0202 August 1999 Forwards SE Accepting Licensee 990326 Request for Relief from ASME B&PV Code,Section XI Requirements.Request for Relief 3-ISI-7,pertains to Second 10-year Interval ISI for Plant,Unit 3 ML20210G8991999-07-28028 July 1999 Discusses 990726 Open Mgt Meeting for Discussion on Plant Engineering Status & Performance.List of Attendees & Presentation Handout Encl ML20210G8051999-07-22022 July 1999 Discusses DOL Case DC Smith Vs TVA Investigation.Oi Concluded That There Was Not Sufficient Evidence Developed During Investigation to Substantiate Discrimination.Nrc Providing Results of OI Investigation to Parties ML20209J0251999-07-16016 July 1999 Forwards SE Which Constitutes Staff Review & Approval of TVA Ampacity Derating Test & Analyses for Thermo-Lag Fire Barrier Configurations as Required in App K of Draft Temporary Instruction, Fpfi, ML20210B2671999-07-14014 July 1999 Confirms 990702 Telcon Between T Abney of Licensee Staff & Author Re Mgt Meeting Scheduled for 990830 at Licensee Request in Atlanta,Ga to Discuss Browns Ferry Nuclear Plant Status & Performance ML18039A8131999-07-0808 July 1999 Forwards Insp Repts 50-259/99-03,50-260/99-03 & 50-296/99-03 on 990502-0612.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20209E5511999-07-0707 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1 & Suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2.This Closes TACs MA1180,MA1181 & MA1179 ML20209E3421999-07-0707 July 1999 Confirms Arrangements Made During 990628 Telephone Conversation to Hold Meeting on 990726 in Atlanta,Ga to Discuss Plant Engineering Status & Performance ML20196J3531999-06-30030 June 1999 Responds to Re Boeing Rocket Booster Mfg Facility Being Constructed in Decatur,Al.Nrc Has No Unique Emergency Planning Concerns Re Proximity of Boeing Facility to BFN ML20196G9111999-06-28028 June 1999 Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits ML20196F8741999-06-23023 June 1999 Forwards Safety Evaluation Accepting Util Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML18039A7941999-05-28028 May 1999 Forwards Insp Repts 50-259/99-02,50-260/99-02 & 50-296/99-02 on 990321-0501.Four Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML18039A7811999-05-21021 May 1999 Forwards SER Authorizing Util 970122 & 980612 Second 10-year Interval Inservice Insp Plan for Browns Ferry Nuclear Plant, Unit 3 & Associated Requests for Relief 3-ISI-3 & 3-ISI-6 ML20206G6611999-05-0404 May 1999 Forwards SE Accepting GL 88-20,submitted by TVA Re multi-unit Probabilistic Risk Assessement (Mupra) for Plant, Units 1,2 & 3 ML18039A7711999-05-0303 May 1999 Forwards SER Accepting Util 970122 & Suppl Ltr , Request for Relief from ASME Code,Section Xi,Requirements for Inservice Insp of Snubbers for Browns Ferry Nuclear Plant,Unit 3,second 10 Year Interval ISI Program ML18039A7621999-04-29029 April 1999 Refers to TVA 990427 Request for Relief from ASME BPV Code for Certain Inservice Insps at Browns Ferry NPP Units 2 & 3. TVA Proposed Alternative That Would Use Wire Penetrameters. Forwards SE Approving Proposed Alternative ML18039A7481999-04-15015 April 1999 Forwards Insp Repts 50-259/99-01,50-260/99-01 & 50-296/99-01 on 990207-0330.Four Violations Identified & Being Treated as non-cited Violations Consistent App C of Enforcement Policy ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML20205T3771999-04-0909 April 1999 Informs That on 990317,R Champion & Ho Christensen Confirmed Initial Operator Licensing Exam Schedule for Y2K.Initial Exam Dates Are Wks of 000612 & 26 for Approx 16 Candidates ML18039A7381999-04-0808 April 1999 Discusses TVA 980612 Request for Relief 2-SPT-11,Rev 1,from Requirements of ASME BPV Code,Section XI for Browns Ferry Npp,Unit 2,Second 10-Year Interval ISI Interval.Safety Evaluation Granting Request for Relief Encl ML20205J2521999-04-0505 April 1999 Informs That Effective 990328,A De Agazio Assigned as Project Manager for Browns Ferry Nuclear Plant,Units 1,2 & 3 ML20205F9231999-04-0101 April 1999 Forwards SE Authorizing Licensee 990108 Relief Request PV-38,from Requirements of ASME BPV Code Section XI IST, Valve Program for Plant,Units 1,2 & 3 ML20205B9601999-03-24024 March 1999 Seventh Partial Response to FOIA Request for Documents. Records in App N Already Available in Pdr.App O Records Being Released in Entirety & App P Records Being Withheld in Part (Ref FOIA Exemptions 7C,2 & 5) ML20205A1821999-03-19019 March 1999 Discusses Plant Performance Review of Browns Ferry NPP Completed on 990208.Determined Overall Performance to Be Acceptable.Security,Fire Protection,Radiation Protection & Plant Chemistry Continued to Be Effective ML18039A7001999-03-0505 March 1999 Forwards Insp Repts 50-259/98-09,50-260/98-09 & 50-296/98-09 on 981227-990206 & Notice of Violation.Conduct of Activities Was Characterized by safety-conscious Operations,Sound Engineering & Maint & Security Measures ML18039A6881999-02-23023 February 1999 Forwards SER Granting Util 980403 Request for Relief 2-ISI-6 Pertaining to Second 10-year Interval Inservice Insp for Browns Ferry Nuclear Plant,Unit 2 Pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also Encl ML20203B9001999-02-0808 February 1999 First Partial Response to FOIA Request for Documents. Forwards Documents Listed in App a Already Available in PDR, Documents in App B Released in Entirety & Documents in App C Being Withheld in Part (Ref Exemption 6) ML20203G4971999-02-0505 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 990407. Representative of Facility Must Submit Either Ltr Indicating No Candidates or Listing of Candidates for Exam IR 05000259/19980111999-01-30030 January 1999 Forwards Insp Repts 50-259/98-11,50-260/98-11 & 50-296/98-11 on 981116-1204.No Violations Were Identified ML18039A6771999-01-25025 January 1999 Forwards Insp Repts 50-259/98-08,50-260/98-08 & 50-296/98-08 on 981115-1226 & Nov.Conduct of Activities Generally Characterized by safety-conscious Operations,Well Controlled Maint Activities & Acceptable Radiological Controls ML20199B0811999-01-12012 January 1999 Forwards Request for Addl Info Re GL 96-05, Periodic Verification Design-Basis Capability of Safety-Related Motor-Operated Valves, to Request That NPP Licensees Establish Program Effectiveness of Current Program ML20199E3791998-12-23023 December 1998 Discusses Training Managers Conference Conducted at RB Russell Bldg on 981105.Agenda Used for Conference,List of Attendees,Slide Presentation & Preliminary Schedule for FY99 & FY00 Encl ML20198N8111998-12-18018 December 1998 Discusses Open Mgt Meeting Conducted on 981217 in Region II Ofc to Present self-assessment of Util Performance.List of Attendees & Copy of Presentation Handout Encl ML20198N7481998-12-14014 December 1998 Discusses DOL Case 98-ERA-34,DC Smith Vs Tva.Forwards Synopsis of OI Rept 2-1998-011,completed on 981030 ML18039A6361998-12-0909 December 1998 Provides Info on Status of NRR Review of TVA Actions Re USNRC Bulletin 96-03, Potential Plugging of ECCS Strainers by Debris in Boiling Water Reactors, for Plant.Review Expected to Be Completed by Spring 1999 1999-09-28 |
Inspection Report - Browns Ferry - 1986038 | |
---|---|
Assessments |
Text
of6 cia.I
-
MAR 0 21987 Tennessee Valley Authority
[ N:
Mr. S. A. White Manager of Nuclear Power 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Gentlemen:
SUBJECT:
NRC INSPECTION REPORT N05. 50-259/86-38, 50-260/86-38, AND 50-296/86-38 Thank you for your response of February 11, 1987, to our Notice of Violation issued on January 2,1987, concerning activities conducted at your Browns Ferry facility.
We have evaluated your response and found that it meets the requirements of 10 CFR 2.201.
We will examine the implementation of your corrective actions during future inspections.
We appreciate your cooperation in this matter.
Sincerely, Gary G. Zech, Assistant Director Regional Inspections Division of TVA Projects Office of Special Projects LHIP.Pomrehn,SiteDirector cc:
Browns Ferry Nuclear Plant J.L.Gridley, Director Nuclear Safety and Licensing t,R. W. Cantrell, Acting Director Nuclear Engineering M. J. May, Site Licensing Manager y
8703240443 870302 PDR ADOCK 05000259
PDR lj0 LEcl
-__
_________
.-
.
Tennessee Valley Authority
bec: uk Keppler, OSP S' Ebneter, OSP.
,Jfr. R. Connelly, 0IA fu E. Gears, NRR K. P. Barr, RII
- CResidentInspector NRC Document Control Desk i
State of Alabama
,
gg RII RII RII RII s
j
.
he WCline /APStohr RWeddington CHo DCo 1 s E 2/Td/87 2/
2/@/87 2/20/87 2/Bd87 2/yd87 RI RII g
Aignatonis ar
' 2/ 4/87 2/D/87
.
.
..