U. S. NUCLEAR REGULATORY COMMISSION
REGION III
Reports No. 50-254/87028(DRS); 50-265/87028(DRS)
Docket Nos. 50-254; 50-265 Licenses No. DPR-29; DPR-30 Licensee:
Comonwealth Edison Company P. O. Box 767 Chicago, Illinois 60690 Facility Name: Quad Cities Station, Units 1 and 2 Inspection At: Quad Cities Statien, Cordova, Illinois Sargent and lundy Office, Chicago, Illinois Impe11 Corporation Office, Lincolnshire, Illinois U. S. NRC, Headquarters, Bethesda, Maryland U. S. NRC, Region III, Glen Ellyn, Illinois Inspection Conducted:
September 14, 1987, at NRC Headquarters October 8-9 and November 4-5, 1987, at Quad Cities December 9, 1987 and January 26-28, 1988, at Sargent and Lundy January 11 and January 28, 1988, at Impell
, February 11, 1988, at Region III Inspector:
Ga la
///x ev
/7 #7 Date
'
3 ///PP
Approved By:
D. H. Danielson, Chief Materials and Processes Date Section Inspection Summary Inspection from Seatember 14, 1987 through March 4, 1988 (Report No. 50-254/87028(015); No. 50-265/87028(DRS))
Areas Inspected:
Special safety inspection of snubber surveillance and functional testing (70370), non-licensed training (41400) and licensee action on previously identified items (92700).
Results: Two apparent violations were identified (failure to accomplish activities in accordance with documented drawings - Paragraphs 2.a and 2.c; inadequate design control - Paragraph 2.b and 2.c.
8803250180 880318 PDR ADOCK 05000254 o
_-
_
_
_ - _ _
_. _ _ _
_
. - _
~ --_ __
'
,
DETAILS 1.
Persons Contacted Commonwealth Edison Company (CECO)
- R. L. Bax, Station Manager, Quad Cities
- R. Robey, Services Superintendent
- J. Kopacz, Technical Staff Supervisor
- D. Hoogheem, Regulatory Assurance Engineering Assistant
- D. Kunzman, Quality Assurance Inspector
- S. Javidan, BWR Engineering
'#I. Johnson, Nuclear Licensing Administrator
- R. Mirochna, Supervising Engineer
- E. Zebus, Superintendent, Dresden/ Quad Cities G. Knapp, Snubber Coordinator, Quad Cities Sargent and Lundy Engineers (S&L)
T. G. Longlais, Head, Structural Engineering Division R. L. Krawczyk, Project Engineer G. L. Jurkin, Mechanical Project Engineer J. M. Nosko, Mechanical Project Engineer R. H. Jason, Project Manager
- B. Erler, Assistant Manager, Structural Department
- D. Gullaksen, Assistant Head, Structural Engineering Division
- P. Gazda, Senior Structural Project Enaineer Impell Corporation (Impell)
- T. Wittig, Division Manager, E. D.
- A. Ho, Section Manager, E. D.
D. Bailey, Lead Senior Engineer Nuclear Reactor Regulation (NRR)
- P. T. Kuo, Section Chief, EMEB Brookhaven National Laboratory (BNL)
tW. Grossman, Structural Analysis Engineer
- K. Bandyopadhyay, Analysis Engineer
- Denotes those attending the interim exit meeting on November 5,1987, at Quad Cities.
- 9enotes those attending the interim exit meeting on January 28, 1988, at S&L.
Denotes those participating in the final telephone exit interview nn March 4,1988.
(
,
2.
Action on Licensee Event Reports (LERS)
a.
(Closed) LER 254/87024-00:
Primary containment structural steel connections did not meet design requirements due to original installation errors.
As a result of the structural steel deficiencies discovered at CECO's Dresden Station (Reference: LER 237/87-003, LER 249/87-005 and NRC Inspection Reports No. 50-237/87006; 50-249/87011), investigative walkdowns were initiated at Quad Cities.
The walkdowns were performed to identify and quantify any similar structural steel deficiencies at Quad Cities.
These walkdowns disclosed that 10 structural connections and three structural beams contained deficiencies that resulted in stresses exceeding the FSAR limit.
Further evaluation concluded that although the stresses exceed FSAR limits, all stresses were within the range where the structural components were considered operable. Additionally,14 other deficiencies were noted and although the stresses were within the FSAR limits, prudent engineering practice indicated they should be corrected. All of the identified FSAR deficiencies and as many of the other identified deficiend: as possible were corrected prior to restart of the unit.
Engineering Change Notices No. QC-87S-24, QC-87S-25 and QC-87S-27 were issued to implement the above modifications.
The above described deficiencies are an example of a violation of 10 CFR 50, Appendix B, Criterion V, in that the structural steel connections were not installed in accordance with the applicable design drawings.
(254/87028-01A)
Similar walkdowns were previously performed on Unit 2 but no violations of FSAR stress allowables were found.
However, these walkdowns addressed only the cheek plate connections and as such, verified only a portion of the connections in question.
Pending the completion of the comprehensive walkdown verifying all the necessary connections, this is considered an Open Item.
(265/87028-01)
b.
(Closed) LER (254/87-011-00): Original construction errors caused an embedment plate for three pipe supports to exceed FSAR design stresses.
As a result of the design deficiencies discovered at CECO's Dresden Station (Reference:
LER 237/87-010, LER 237/87-017, and NRC Inspection Reports No. 50-237/87006; 50-249/87011), a comprehensive Embedment Plate Assessment Program was implemented at both the Dresden and Quad Cities sites. A summary report for this program was issued October 16, 1987, and transmitted in a letter from :. M. Johnson (CECO) to A. B. Davis (NRC) on October 19, 1987.
'
.
The deficiency discovered at Dresden and subsequently found at Quad Cities was a misinterpretation of the design drawings which caused the anchor strap spacing to be 18 inches, instead of 9 inches.
This spacing increase reduced the overall load carrying capacity of the embedment plates and consequently affected the piping supports attached to these plates.
The assessment program at Quad Citio reviewed over 2000 pipe supports attached to approximately 1200 embedment plates.
The results showed that only three supports attached to one embedment plate exceeded the revised embedment plate load capacity.
This embedment plate was modified under Engineering Change Notice (ECN)
QC-87S-10 by drilling expansion anchors through the plate and into the concrete.
Although a total 19 supports were inaccessible during the implementation of the program, based on the lack of significant problems as well as the justifications provided in CECO's surmiary report, no further work is required to close this issue.
The deficiency discussed above is an example of a violation of 10 CFR 50, Appendix B, Criterion III, in that the design requirements for the embedment plates were not correctly translated into the fabrication drawings.
(254/87028-02A; 265/87028-2A).
c.
(Clo',ed) LER (254/87-026-00; 254/87-026-01):
Pipe support for core sprey discharge line was not constructed in accordance with the design drawing.
As a result of design deficiencies discovered at CECO's Dresden Station, (Reference:
LER 237/87-010-00 and NRC Inspection Report No. 50-237/87006; 50-249/87011), the Piping Configuration Verification Program was implemented at both the Dresden and Quad Cities sites.
This progran is currently ongoing and is scheduled for completion later in 1988.
The intent of the program is to verify the existence and location of pipe supports, confirm pipe sizes and pipe schedules, determine branch connection details and general configuration for comparison with the as analyzed condition.
While implementing this program, support M-1610-18 was found with clearances which exceeded the specified installation tolerance.
The subsequent evaluation concluded that the associated piping system would exceed the FSAR stress allowables but was within the operability limit.
The excessive clearance causing the discrepancy was corrected under work request NWR Q62124 by adding additional shims.
In addition to the above discrepancy, at least five other problems were identified in the same piping model, Ql.10.2.
Two supports which should have been demolished were not removed, one demolished support was still in the model as a spring hanger, one support was mislocated by 2'-7" and the wrong pipe schedule was used in the analysis.
.
-
.
..
'
.
The discrepancies discussed above are the result of design deficiencies as well as construction deficiencies.
For the above
,
situations wheie the work was not performed in accordance with the specified design drawings, this as another example of a violation of 10 CFR 50, Appendix B, Criterion V.
(254/87028-01B; 265/87028-03)
For the above situations where the piping configuration was not correctly analyzed or modelled, this is another example of a vio'ation of 10 CFR 50, Appendix B, Criterion III.
(254/87028-02B; 265/87028-028)
d.
(0 pen) LER (254/87-008-00): Anchor bolts for a residual heat removal piping support were found sheared off.
An operability analysis was eventually perfomed assuming the support did not carry any weight. This analysis indicated that the piping was within the operability limit, but had exceeded the FSAR stress allowables.
The Impell operability analysis, Calculation No. 0590-206-001,
"Operability of Q1-RHRS-02C," Revision 0, May 7, 1987, was reviewed by the NRC inspector.
No adverse comments were made.
At the time of the inspection, two issues were raised by the NRC inspector.
First, the root cause of the event has not been ultimately determined.
Pending the conclusion of the ongoing root cause evaluation, this item will remain open.
The second issue concerns the manner in which this event was handled.
The noted discrepancy was originally identified by the licensee on March 9, 1987.
At that time, a work request was initiated to repair the problem.
As part of the work request approval, the operating engineer determined that the damage to the hanger did not make the RHR system inoperable.
It was unclear to the NRC inspector how the operating engineer, without contacting engineering, was able to determine that the system was still operable with a broken support.
It was also unclear to the NRC inspector why this potentially significant deficiency existed for almost two months before any addition review or other work was performed on it.
Pending further review by the NRC into the basis for considering the system operable with an inoperable support and the procedures that control this type of situation, this will be considered an Unresolved Item.
(254/87028-03)
e.
(Closed) LER (265/87-019-00; 265/87-019-01):
Design errors relating to pipe supports caused portions of the resident heat removal and high pressure coolant injection systems to exmed FSAR stress allowables.
The above discrepancies were discovered during the implementation of the ongoing Piping Configuration Verification Program.
(Refer to LER 254/87-026 in Paragraph 2.c for addition details.) All of the above
-
-
.
_.
-. -
--
- _.
.
_
_ _.
_
__ _
.__
__
_.
'
.
discrepancies were within the previously establish operability limits.
-
Additional deficiencies as well as subsequent corrective actions will
be tracked under the previously discussed violations.in Item 2.c.
t
'
3.
Snuuber Visual Inspection and Functional Testing a.
Gackground
Quad Cities Unit 1 has approximately 122 safety-related mechanical snubbers. The visual inspection and functional testing requirements are specified in Technical Specification (Tech Spec) Section 4.6.I.
'
-The functional test sample size is limited to an initial sample of 10% with an additional 10% for each functional test failure, j
b.
Procedure and Documentation Review i
The NRC inspector reviewed relevant portions of-the following
.
procedures to determine whether they complied with NRC requirements and licensee commitments.
{
'
(1) Ceco Procedure QTS 180-2, "Mechanical Snubber Visual Inspection," Revision 3, July 1987.
Paragraph E.1 discusses actions required if a snubber is believed to be inoperable.
It states that a functional test
may be required. The note associated with this paragraph states that the functional test shall include verification of f'
proper break away force and running drag forc :. However, there is no mention that the functional test shall include verification
.
'
of activation parameters. Although there was no instance found where the functional test excluded the activation parameters,
,
this is a potential source of confusion. After discussing this aspect with the licensee, it was agreed that this i
clarification would be added to the procedure at its next revision.
(2) Paul-Munroe Procedure OSS-QAP 11.1, "Functional Testing of l'
Pacific Scientific Shock Arrestors," February 22, 1985.
It was noted by the NRC inspecter, that there was no definitive acceptance criteria specified in this procedure.
Instead the j
procedure states that the acceptance criteria shall be j
specified by the owner / agent. This is not a poor practice as long as the licensee adequately defines the acceptance
-
criteria.
In this case the acceptance criteria was specified in a letter from the station's Tech Staff supervisor to Paul-Munroe's Regional Sales Manager.
In addition, the functional test package for each snubber also contained a copy of the acceptance criteria.
There was, however, no reviewed and approved document that gave the functional test acceptance i
i criteria. During the inspection it was established that the
l existing acceptance criteria had an adequate technical basis.
!
I
.
!
..
-.
. - -
-.-.~.
- - -
-
.. -. -
.
..
. -
'
.
It was the station's position that since each snubber test package contained a copy of the acceptance criteria, and a Tech Staff engineer was required to sign this, that this was an adequate review of the acceptance criteria. Although the !RC inspector felt that this was a potential weakness in the program, it was accepted.
The licensee agreed to review this matter in the future with the intent of formalizing the functional test procedure and including the acceptance criteria.
The calibration records for the snubber test stand were also reviewed. The Paul-Munroe STADAS Pipe Support Test Machine, Model STM-4120, Serial No. 653 A, due to be calibrated January 27, 1988, was within the calibration schedule at that time.
In addition, the Position Measurement Systems, Load Measurement Instrumentation and all of the related load cells were within the calibration time schedule.
It was noted that the Position Measurement System STM-1 had to be re-calibrated in October.
This was attributed to a severe mechanical jolt received during the trailer transportation from the previous site. Although this is the first time this had occurred, calibration verification may need to be performed after each transfer of the test stand trailer.
As an additional aspect to the normal functional test inspection, the NRC inspector reviewed the specific implementation of CECO's Quality Procedure (QP) No. 3-54 relative to the snubber testing program. This procedure, "Design Control for Operations-Digital Computers and Software," appears to apply to the software that is used to control the snubber test stand. The output from this program is used as the basis for determining operability of individual snubbers.
Based on discussions with plant personnel, this Quality Procedure had not previously been applied to this application. Since the hardware and software for the snubber test facility were purchased from CECO's corporate office, detailed documentation for all aspects of the original system verification were not available at the site.
Pending a review of the documentation demonstrating compliance with QP 3-54 verification requirement er adequate justification as to why it is not applicable, this will be considered an Open Item.
(254/87028-04;265/87028-04)
Within the areas inspected, no violations or deviations were identified.
c.
Functional Test Results During functional testing, a total of three snubbers failed to meet the established acceptance criteria. The initial failure occurred when snubber 1-73 failed to move at 25% of its rated load.
The snubber was assumed to be locked-up and was analytically evaluated as such. The piping system was reanalyzed assuming a rigid
[
'
.
support at that location for the associated thermal load cases.
Although piping stresses and support loads increased, all of the results were within FSAR allowable limits.
The calculations are documented in S&L File No. EMD-045229, Appendix A.
The autopsy performed on the snubber indicated that there was some abnonnal internal wear; however, there was no indication of an excessive or unanticipated load.
It was noted by the NRC inspector that the engineer performing the operability evaluation was not aware of the autopsy results until they were presented during this inspection.
The autopsy had been performed 23 days prior the this date. Without the autopsy results, operability determinatian could not be made since unanticipated loads may have occurred in the system.
In this case there were no adverse consequences but it appears that a better coordination between the field efforts and the engineering organization is needed.
Two additional snubbers, 1-46 and 1-93, failed the functional test criteria.
Both snubbers were analyzed for the deficient condition and were both found to be operable. The nature of the failures did not dictate extensive re-analysis or root cause evaluations.
During the additional functional testing, required to meet Tech Spec action statements, the validity of the existing acceptance criteria was questioned by CECO. As a result of CECO's review, the criteria used at Quad Cities will be revised to bring it in line with the criteria currently being used at other CECO plants.
Within the areas inspected, no violations or deviation were identified.
d.
Visual Inspections As required by the Tech Spec, all safety related snubbers were visually inspected during the outage.
Two snubbers were noted as having potentially significant indications during the visual inspections. The cold setting for Snubber 1-61 was within 0.875 inches from bottoming out.
The design docunents for this snubber called for a minimum cold setting of 1.29 inches.
The other snubber, 1-65, was observed as having an interference with the adjacent grating.
This interference could potentially restrict the thermal movement of the snubber.
The above two indications were dispositional by S&L.
For snubber 1-61, a reinspection of the snubber setting indicated that the snubber was within an acceptable cold setting range if the recommended safety factor was subtracted from the minimum cold setting position. On this basis, there is no analytical problem associated with the snubber condition.
However, S&L made a recommendation to adjust the associated pipe clamp to a position where the snubber's cold setting is back to within the recommended ra nge.
- _. _ -
.-
.- - -.. -.
.., - - - - - -
_ _-...
-. _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. - _ _ _ _
.
For snubber 1-65, S&L evaluated the possibility of reversing the snubber orientation to eliminate the observed interference.
It was concluded that this would be acceptable and the necessary changes were made.
Due to some miscomunication, S&L was not aware that they also needed to evaluate the consequence of the snubber interference.
A contributing factor to the miscommunication was the fact that the visual inspection sheet with the exact interference configuration was never given to S&L. After this issue was raised by the NRC inspector, it was detennined that the thermal movements would be away from the observed interference and as such did not present an analytical concern.
Due to the lack of significance associated with this issue no further action is necessary.
However, it appears that better coordination between the field efforts and engineering organizations is needed.
Within the areas inspected, no violations or deviations were identified.
4.
Flued Head Anchors Background On September 2, 1987, the NRC inspector was contacted by CECO concerning an operability question for the ongoing embedded plate program.
(See NRC Inspection Reports No. 50-237/87006; 50-249/87011, Paragraph 3.c.1 for background information on the program.) A followup inspection was conducted the next day to review the details of the operability analysis for a portion of flued head anchor X116A at Dresden Unit 2.
It was disclosed that, based on an Impell evaluation, the embedded plate portion of the X116A penetration could be considered operable only if increased damping specified in Regulatory Guide 1.61 and increased allowables based on yield strain criteria from ANSI /AISC N690-84 could be utilized. Neither of these criteria were part of the licensing basis for Dresden. Also, CECO stated that the flued head anchor structures at both Dresden and Quad Cities were not included under the IE Bulletin (IEB) No. 79-14 scope of work.
For
'
this reason, none of these anchor structures were ever as-built verified.
'
At the request of the NRC inspector, CECO contacted NRR personnel to discuss the above situation, and to receive concurrence for the use of the above operability criteria.
Based on these discussions, CECO was asked to clarify several technical issues concerning the operability analysis.
Subsequently, CECO was requested to make a presentation giving the justification for use of the above criteria as well as the basis for exclusion of the flued head anchor structures from the IEB 79-14 program.
A meeting was held on September 14, 1987, in Bethesda, Maryland to discuss the above topics.
Presentation material discussed during the meeting is included as Enclosure 3.
During the meeting CECO presented the original design basis loads and analytical methodologies for the flued head anchor structures in question.
It was concluded by Ceco that the first operability analysis done by Impell had used a more conservative design assumption than
'
.
the original analyses.
Furthermore, by using the original methodologies, the operability question for the X116A embedment plate was completely resolved since all components could be shown to meet the FSAR stress criteria.
On this basis, CECO withdrew their request for using Regulatory Guide 1.61 damping and AISC N690 strain criteria.
Concerning the IEB 79-14 issue, CECO's position was that the flued head anchor structures are structural anchors for the containment penetrations and as such did not require as-built verification under the subject program.
The conclusions drawn by the NRC at the end of the meeting were as follows:
The CECO presentation did nut appear to be sufficient for the staff to agree or disagree without further study.
The staff was concerned that the original design basis may not have been properly implemented is some respects such as the application of loads en the structure and assumptions in the frame analysis.
The staff would have to examine the FSAR's for Quad Cities and Dresden before coming to a final conclusion.
Further efforts by the NRC would include an audit of the design calculations and an inspection of the anchor structures.
Inspection Activities The Regional NRC inspector field verified the as-built configuration of 11 flued head anchor structures at Quad Cities and 10 anchor structures at Dresden.
The inspections ;howed that the overall structures were basically in accordance with the design drawings relative to member sizes and configuration; however, some differences were noted. At both sites the structure's legs were not precisely indicated.
In some cases the legs were more than 20 inches shorter than specified on the drawings. This gave a general indication of a lack of correlation between the design versus the as-built details for the structures.
In several instances there were missing welds between beam connections. At Dresden, the anchorage details were unavailable and therefore could not be compared to the installed configuration.
Several anchor structures were noted as being redesigned during the course of recent modification work.
Some cross bracing details and attachments to base plates were slightly different from the design drawings.
The original analytical assumption of pinned connections was considered to be invalid by the NRC inspector.
Additional inspections of design calculations were later conducted by Regional as well as Headquarters and contractor personnel at the engineering offices of S&L and Impell.
The evaluation report from the contractor assisting in this inspec. tion is contained in Enclosure 4.
,
.
- _ - -
.
i Conclusions
,
'
The overall conclusions reached during this portion of the inspection is as follows:
a.
CECO's decision to exclude the flued head anchor structures from the IEB 79-14 program appeared to be an inappropriate decision.
b.
Based on recent wall: downs performed by CECO, a number of anchor structure baseplates at Quad Cities utilized concrete expansion anchors which were never reassessed as required by IE Bulletin 79-02.
c.
During the above walkdowns CECO identified a number of discrepancies between the design drawings and as-built configuration.
These discrepancies could not be dispositioned using engineering judgement and will require additional reassessment, d.
Impell did not use the original design bases for the requalification and modification of the flued head anchor structures that were altered as part of the Recirculation Pipe Replacement (RPR) Project.
Pipe break loads were never considered during the redesign effort, contrary to FSAR requirements, e.
The original design methodology assuming pinned connections was not accurate but not necessarily inappropriate.
The structural members designed using this approach should be adequate.
However, this approach potentially underestimates concrete attachment loads to a significant degree. Anchor bolts should be reevaluated using appropriate loads with appropriate design capacities and safety factors.
Base plates should be reassessed for both tension and compression loads.
f.
It was not obvious that the original load combinations provided bounding loads for all cases.
This should be reviewed to confim conservatism.
Based on the above concerns, CECO committed to implement a comprehensive program to demonEtrate the adequacy of the flued head anchor structures at Quad Cities and Dresden.
On February 11, 1988, a meeting was held in the NRC Regional office to discuss the details of the above program.
Information presented at the meeting is contained in Enclosure 5.
The adequacy of the proposed program is currently under review by NRR.
The overall flued head anchor issue has not been resolved and will continue to be considered an Unresolved Item.
(254/87028-05; 265/87028-05)
5.
Open Items Open items are matters which have been discussed with the licensee, which will be reviewed further by the inspector, and which involves some action on the part of the NRC or licensee or both. Open items disclosed during this inspection are discussed in Paragraphs 2.a and 3.b.
O O
6.
Unresolved Items An unresolved item is a matter about which more information is required in order to ascertain whetner it is an acceptable item, an open item, a deviation, or a violation. Unresolved items disclosed during this inspection are discussed in Paragraphs 2.d and 4, 7.
Exit Interview The Region III inspector met with the licensee representatives (denoted in Paragraph 1) at the conclusion of the inspection.
The inspector summarized the purpose and findings of the inspection. The licensee representatives acknowledged this information.
The inspector also discussed the likely informational content of the inspection report with regard to documents or processes reviewed during the inspection.
The licensee representatives did not identify any such documents / processes as proprietary.
..
l l
l
l L-
-.
.
.
._
i e
ENCIOSURE 3 COMMONWEALTH EDISON COMPANY I
i CONTAINMENT PENETRATIONS
,
.
I
'
SEPTEMBER I4, 1987
!
)
1
-
.-
J
_ _ _ _ _ _.
.
'
AGENDA
.
'
I.
INTRODUCTION I.M.
JOHNSON, CECO
-
!
II.
ORIGINAL DESIGN FOR B.A.
EPLER, 30'
DRESDEN & QUAD CITIES l
III.
JUSTIFICATION FOR TREATMENT T.T.
WITTIG, IMPELL OF CONTAINMENT PENETRATIONS IV.
CONCLUSIONS FOR DRESDEN B.A.
ERLER, S&L V.
OTHER CECO PLANTS I.M.
JOHNSON, l
CECO l
l
__-______
_ _ _ _ _ _ _ _ _ _ _ _ _ -
_
_ - _ - _ _ _
II.
ORIGINAL DESIGN FOR DRESDEN AND QUAD CITIES
.
- DESCRIPTION
- GENERAL CONFIGURATION
- TYPICAL CONTAINMENT PENETRATION
- TYPICAL FRAME
- QUANTITIES OF CONTAINMENT PENETRATION ANCHORS i
- SYSTEM DESCRIPTION DESIGN DETAILS
-
- DESIGN LOAD CASES
,
-
ANALYTICAL MODELS AND ASSUMPTIONS
-
ACCEPTANCE CRITERIA
-
TYPICAL MARGINS
- FSAR COMMITMENTS
- SUMMARY
.
_ _ _ -
,
l
..
QUANTITIES OF CONTAINMENT PENETRATION ANCHORS AND STRUCTURES NO.
STATION UNIT NO. OF SUPPORT PENE R 3 FRAMES WITH BELLOWS
22 16 (!)
DRESDEN
22
(1)
TOTAL 4 4-
1
12 (2)
OUAD CITIES
20
(2)
l TOTAL
24 BOTH STATIONS TOTAL
56 NOTES i) MAIN STEAM - REACTOR FEED STRUCTURE SUPPORTS 7 LINES 2) MAIN STEAM - REACTOR FEED STRUCTURE SUPPORTS 9 LINES
.
e s
.
,
'
- -
g
'
SYSTEM DESCRIPTIONS
'
..
PENETRATION NUMBER LINE NAME IN THE PENETRATION DRESDEN OUAD CITIES
3 l
l MAIN STEAM 105A-i i iOSA-D 7A-D
'.
,
MAIN STEAM DRAIN 106 106 Q
Q REACTOR FEED WATER I07A&B l07A&B 9A&B 9A.dB
,
,
ISO CONDENSER SUPPLY lOOA lO8A
-
-
,
l l
ISO CONDENSER RETURN IO,9A lO9A
-
-
l RCIC STEAM SUPPLY
-
-
10 HPCI STEAM SUPPLY ll5A 128 il
SHUTDOWN SUPPLY lilA&B lilA&B
-
-
RHRS SUPPLY
-
-
12 LPCI PUMP DISCHARGE Il6A&B ll6A&B 13A&B 13A&B CLEAN-UP SUPPLY l13 l13
14 CORE SPRAY I49A&B 149A&B 16A&B 16A&B REACTOR VESSEL HEAD SPRAY I47 147
17 CLOSED COOLING WATER SUPPLY 123 123
23 CLOSED COOLING WATER RETURN 124 124
24 CRD RETURN I44 IO9B
36 STANDBY LIQUID CONTROL 130 130
47 m
'
'
'
'
-
,
,
p
'
\\
\\
.
t
-
a m
_ _ _ _ _ _ _ _ _ _ _ _ _
.
.
DESIGN BASIS LOADING
,
l i
l CASE I:
l BLOWOOWN' FORCE FOR THE LINE UNDER INVESTIGATION CASE II & III:
FORCE REQUIRED TO BRING THE PIPE INTO CONTACT WITH THE SPACER, GUARD PIPE OR SLEEVE.
THE MOMENT IS LIMITED TO THE PLASTIC CAPACITY OF THE PIPE.
CASE IV:
WORST LOADING, BASED UPON ACTUAL PIPING CONFIGURATION, FOR OUT-OF-PLANE CONFIGURATION WHICH PRODUCES REACTIONS WITH BENDING AND TORSION.
LOADING IS BASED UPON FORCE REQUIRED TO BRING THE PIPE INTO CONTACT WITH THE SPACER, GUARD PIPE OR SLEEVE.
I
6
_ _ _ _ _ _ _ _ _ _ _ _ _ _
_
____ __
.
LOAD (ASE6 FOR ORIGIMAL DEslGM
~~gwwwwr sato w4u.
- Au=Wrg AscWo= eo,wr I
+b i
h Ra
^T j -.- E X
..,
%.
w e,o4TAtuMEWT j
eowTAlWMENT- {
64ffLD WALL g
'-
..4 j
__
e
.
H r
A x
Ra, Mx p
r
..
-D
)
AMdWom ANT
...
,
NTAtWWT W
sHIELo WM L
,,,
g P
- 6 x/~E
,E s-
R, Mx y
= r, 44NTMM MeWT "
~ ANeWoc. m WT
,,
w v[4,ow7A WMeWT $WlELP ww L eo"w-r g
.ww mur a
,,--,
(r A
Rx,M,Ma D
=-f
O
.
'
A m
j-*
,W
Al X
&
P ((
dC SEcTlokj A -A
.____
_ _ _ _ - _ _ _ _ _ _ _ _ _
_
j
.
l
.
-AIR 6PAGE 3.,
,
-
t,,
1'
E5ELLOWS e
L-t ONTAINMENT
'
GUPPORT-a "
'
q
-
smoes
_y
- -
- C p(
eerim
%_ q 6LEEVE
-
i l
yll
-,
'
-
e
/
,,
.
,.
, ygp p pg
. -
-
-
..
,,
,
l I
f_
FLUED HEAD ~
V ssiu
<
N, %, \\l _
_
_
_=
_.
_
_
\\
_
_
_
_1
,
j'
--
..
.
_
_
_
_
_
_
h j
-- -
gl 11
_
_
_
_
,
I
'
I l
1.
.
ii
+
-
-
.
.
..
.
.
.
.
.
.
.
.
.
ng)
_
-.
.
.
.
.
.
.
.
n lIl
, ~
n
--
--
1-
--
--
--
,,
.
l
-
.
l s i
~
,
,,
_
-- __ __ _,
s u
E
.
-
II N-M h
.
,
e a
.
~
~?.'.
e
b A.
-
--
g;s
-
u
.
(
.-
i I YPlCAL FLUED WEAD AkJCl-LOR AND 6UPPOF2T
.
.
r
.
-w
_
?
- ,
&
o y
?
'
%
- - __ __
_.
-
.
_f pW IG
,
/V
'4
,
,gI/2'
L3x3
=
)l:)
ly
-
W8 i
m
"2
"~
j
/
- ' -
E7016 O
\\(TYR)
\\
/
/ }3[/
l t
TYPICAL BRAClhjG INTERNAL CONNECTION
-
>
$
&\\
+
j
a G '?.':
Lgx4 c
.
.
---
i
" ::.,
,,
k. Il2
-~
y I"# ROCK SOLT
{
- ~~
'
( 5-REQ 0.)
a;
,-
,
~ ~
'G"$ PlPE
'
~\\
%
>
...
-+ ---
-
f
...
a a'::*:'
l N
~ tV it ii $
\\
k 1. z'/4"x io"x t'-o'
l 1 /4'g CORE HOLE PER S
SOLT, F(LL HOLE WITH
.
EWBECO NOM-SHRiuK GROUT l
TYPICAL WALL CONNECTION WITH BRACING
-
- - _ - - - _ _ _ _ _ _ _ _ _ -
- - - -
,. _ _. _.
_ _ _ _ _. _ _ _ _ _. _. _ _ _
i
'g
,\\
s
\\
-
\\
i
'N
'g
.
D
'S
.
x.
<
'
-s
' s.
v w
y
'o
, +, \\
u s
O
.2
'. -
--
/
_s
- y\\
,
i,1 il y
,916.I s
31 s 9 ]
-
%
mio
's
-
'
<
\\
N
/
s
.,
f
\\
\\
N
s
- \\
,/
'
N
,-s s
j j/
\\
k
\\
y l
x,,
/
U p\\
% -l
~
'
/
/ (N
\\l y!go-Q
~\\
~~
/
I
\\
/
,,
EV
/
\\
/
/D
/
@ I oi
,/".
//
j
'
'
-
,
/
f','
,,
,
,
,,
,
.
l
,',s~~
sr o
.
/
'$$!
/
UJ
s
/
.
,
e
&
!
x s
$
\\
A
g
N
\\
/
N
8
'
\\/j
,
e
'
a
a
.
<'.
>/
p a
- L S
'
.
l
'
,
l
. /
a U
.
'
4 2
,
l
,-
-
u 4
.
l
+
<
l l
m
/
/
b i
'
'
/
g/
H Q
.
.,
x
/
l
/
..
-
a l
J, U_
..
-
- - _ - _ _ _ _ _ _ _ _ _ _ _
__
e
..
l
~
I.-
<,4
,
o
.
o
/
\\
/
\\'
'
'
'\\
,
'
\\
/ -
t'
s g
I d
u o
TYPICAL ANALYTICAL MODEL FOR ANCHOR FRAME ASSUMPTIONS:
,
- EACH OF THE FOUR LOAD CASES APPLIED INDEPENDENTLY l
- DIAPHRAGM PLATE TRANSMITS LOADS
,
TO MEMBERS RIGIDLY
- SPACE TRUSS - STRUDL MODEL
- ELASTIC ANALYSIS METHODS USED l
,
_ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _
_
. _ _ _ _
-
_
_
_
i l0
- H M
- seAp CJL
)
.
U-pIAPHeAss PLATE.
_H e-
.5ECT ION TYPICAL ANALYTICAL MODEL FOR DIAPHRAGM PLATE DRESDEN ONLY ASSUMPTIONS:
- PLATE IS ASSUMED AS RIGID FOR IN-PLANE LOADING
- ANALYSIS FOR AXIAL LOAD AND OUT-OF-PLANE BENDING INDEPENDENT
- MANUAL ANALYSIS CONSERVATIVELY ASSUMING ONE WAY ACTION
- COMBINATION OF ANALYSIS BY SUPERPOSITION
- ELASTIC PLATE METHOOS USED
_ - - _ - _ _ - _ _ _ _
_ _ _ _.
__
_ - - _ _ _ _ - _ _
.
,
l 1'
PINS
,e
!
I
.d P'
I
'
M (
-gme
(
-
I
"
_P H
--
-
.-
U.
LN HEAD 9-t l
'C l
l w
-
skE CTIOhJ
-
e.
TYPICAL ANALYTICAL MODEL FOR ANCHOR RING AND PINS
-
--
QUAD CITIES ONLY ASSUMPTIONS:
- PINS DESIGNED FOR SHEAR LOADING (NO TENSION)
- RING ASSUMED TO BE RIGIDLY SUPPORTED BY THE FRAME
>
- RING AND WELD DESIGNED FOR GLOBAL BENDING AND SHEAR
- LOAD DISTRIBUTED FROM HEAD TO PINS
'
BASED ON ELASTIC ANALYSIS
!
. :
_
_ _ _ _ - - - - -
,
ACCEPTANCE CRITERIA MEMBERS
-
TENSION: FA = 0. 9 Fy
_
_
COMPRESSION: FA = 0.9 Fy 1 -
2C
_
c
_
- DIAPHRAGM BENDING: FB = 0.6 Fy
- RING PLATE AND CINS BEARING Pp=
.9 Fy SHEAR Fy=
75 Fy BENDING FB=
.9 Fy
- ANCHOR BOLTS ROCKBOLTS: FT = 0. 9 Fy A36:
F7 = 0. 9 Fy
'
- WELDS l
E70 ELECTRODES: Fw < l.6 X AISC SEVENTH EDITION
E60 ELECTRODES: AISC SIXTH EDITION i
DIAPHRAGM PLATE TO FLUED HEAD:
(E70 ELECTRODES)
Fw = l.67 X AISC ( ADJUSTED FOR TEMPERATURE)
- CONCRETE PUNCHING SHEAR ALLOWABLE =.9 X 2 /F'C BEARING ALLOWABLE =. 85 F 'C
,
_ __
_ _ _ _ _ _- _ _ _ _ _ _ _ _.
__
_
.
TYPICAL MARGINS IN ORIGINAL ANCHOR STRUCTURE DESIGN MEMBERS 10 TO 25%
BASE PLATES O TO 10%
CONNECTIONS 10 TO 25%
ANCHOR BOLTS 5 TO I0%
_ - _ _ _ _ _ _ _ - _ - _ _ _ - _ - _ _ _ - _ _ _ - _ _ _
-
h FSAR COMkITMENTS PIPE ~ RUPTURE LOAD CASES
-
(1)
AXIAL LOAD (2) MOMENT DUE TO PIPE SPLIT (3) MOMENT AND AXIAL DUE TO PIPE SPLIT PAST 90 DEGREE ELBOW (4) MOMENT, AXIAL AND TORSION DUE TO A SPLIT PAST TWO 90 DEGREE ELBOWS
.
O.
p l
s'
l l
o t
.
-
-
_ _ _ _ _ _ _ _ _ _ _
,
"
SUMMARY
- LOADS USED DURING ORIGINAL DESIGN ARE POSTULATED PIPE BREAK LOADS
- ACCEPTANCE CRITERIA USED FOR ORIGINAL DESIGN ARE CONSERVATIVE ELASTIC
,
ALLOWABLE STRESSES
- RESULTING CONFIGURATIONS ANE STRUCTURES WITH MULTIPLE LOAD PATHS (SPACE TRUSSES) AND HEAVY MEMBERS THEREFORE, THERE IS A VERY~HIGH DEGREE OF CONFIDENCE THAT THE CONTAINMENT PENETRATION ANCHOR STRUCTURES, IN THE AS DESIGNED CONFIGURATION, WILL MEET FSAR ALLOWABLES WHEN SUBJECTED TO I.E.
BULLETIN 79-14 LOADINGS.
_ _. - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ - - -
-
III.
JUSTIFICATION FOR TREATMENT
'
OF CONTAINMENT PENETRATIONS M
- ORIGINAL VS.
CURRENT DESIGN BASIS
.
- 79-14 AND MARK I
EVALUATIONS
- MAXIMUM LOAD COMPARISONS
- SAMPLE EVALUATION RESULTS
- DRESDEN 2 LPCI EVALUATION
- SUMMARY
_
_ - - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _.
_ _ _ - _ _
,
ORIGINAL VS.
CURRENT DESIGN BASIS I
OR'1GINAL DESIGN
- CONTROLLED BY PIPE RUPTURE LOAD CASES (R)
- ELASTIC STRESSES CURRENT DESIGN LOAD CASES (I)
R
..
(2)
G + T
+ P
+ E + MKI WHERE, R=
PIPE RUPTURE T=
THERMAL (HOT OR COLD)
..
P=
PRESSURE DUE TO A PIPE BREAK INSIDE CONTAINMENT E=
.
-.
_ _ _ _
. _ _ _ _ _ _ _ _ _.
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
____
l
..
IEB 79-14 AND MARK I
'
EVALUATIONS IES 79-l4
- CHARTER
- MODIFICATIONS TEND TO REDUCE ANCHOR LOADS
- POSTULATED PIPE RUPTURE LOADS CONTROL ORIGINAL DESIGN
- CONTAINMENT PENETRATIONS WERE NOT RE-EVALUATED MARK I
LOADS ARE NEGLIGIBLE
_ _ _ _ - _ _ _ _ _ _ _ _ -
.
MAXIMUM LOAD COMPARISONS Y
a
.
PIPE
/L [
D3 SDC X-Illa D3 SDC X-1118 D3 COSP X-149A D3 COSP X-1498 D2 HPCI X-IISA 02 LPCI X-l16A R
ORIGINAL ORIGINAL ORIGINAL ORIGINAL ORIGINAL ORIGINAL DESION (A)
DESION (g)
DESIGN (A)
DESIGN (A)
DESIGN (g)
DESION
~ (g)
.
FX
~
169.0 85.73 169.O 91.53 75.4 48.78 75.4 44.72 75.4 39.95 174.7 59.6
.__
IY 35.0 25.68 35.0 15.46 14.9 7.42 14.9 7.65 62.5 13.49 26.2 29.3
_.
FZ 22.2 41.61 22.2 42.05 7.06 15.05 7.06 15.06 8.09 10.75 26.2 23.0 MX 160.0 90.01 160.0 86.67 81.2 21.89.i 81.2 17.05 141.58 31.47 156.55 89.3 MY 518.0 346.89 518.0 381.41 122.0 119.95 122.0 98.78 150.96 80.45 388.0 272.1 MZ 560.0 168.36 560.0 174.61 178.I 6A.97 178.I 42.68 931.4 84.55 388.0 182.0 UNITS IN KIPS AND FT-KIPS NOTES.
A) LOAD COMPONENTS ARE MAX. ABS. VALUES B) LOADS ARE MAX. ABS. VALUE ENVELOPED FROM HOT AND COLD CONDITIONS
_ _ _ _
$
'
I N
h
_ _ _ _ _ _ _ _ _ _ _ _ _ _
t SAMPLE EVALUATION RESULTS
.
AEDESICMD ACCEPTABLE OLE TO 4ITHOUT STATION ANCHOR CONsToucTIcN uootricATION DRESDEN 3 LPCI X-Il6A X
ORESDEN 3 LPCI X-Il68 X
DRESDEN 3 RNCU X-li3 X
DRESDEN 3 ISCO X-IO9A X
DRESDEN 3 SDC X-Ii1A X
CRESDEN 3 SDC X-ill8 X
DRESDEN 3 COSP X-149A X
DRESDEN 3 COSP X-1498 X
,
DRESDEN 2 HPCI X-IISA X (1)
ORESDEN 2 LPCI X-il6A X (1)
OUAD CITIES 2 COSP X-16A X
NOTES; (1) ONLY EVALUATED WELD, BASEPLATE ANO BOLTS ATTACHED TO EMBEDMENT PLATE.
_ _ - _ _ _ _ - _ _ _ _ _ _ _ _
_
- _ _ _ _ -.
.-
l L
DRESDEN 2 LPCI EVALUATION PURPOSE
- PROVIDE LOADS ON THE EMBEOMENT PLATE
- ONE SUPPORT POINT ONLY PIPE LOAD SUMMARY ANALYTICAL MODELING
- ORIGINAL:
SPACE TRUSS
-- PRELIMINARY RE-EVALUATION:
'
SPACE FRAME
- FINAL RE-EVALUATION:
SPACE TRUSS
- OVERALL DESIGN MARGIN NO MODIFICATIONS ARE REQUIRED
______
_ _ _ _ _ _ _ _ _ _ _
k o
e
.
,
.
/
\\
'
\\'
'\\
'
/
,.
'
\\
/ -
c'_
\\
SPACE TRUSS
'
EMBED. PLATE h
N
-
TH U-BOLT (TYP) %
~~
+
.,
M
S I o x 35 g PLATE
.
>
+
+
..
.
,.
SECTION
_
_ _ _ _ _ _ _ _ _ _ _
'
.
DRESDEN 2 LPCT X-Il6A CONTAINMENT PENETRATION ANCHOR LOAD COMPARISON FX FY FZ MX MY MZ ORIGINAL DESIGN (R)
174.7 26.2 26.2 156.6 388.0 388.0 (1)
G+T+E+P+MKI MAXIMUMS 58.6 29.3 23.0 89.3 272.i 182.0-(2)
UNITS IN KIPS AND FT-KIPS NOTES.
( ) PER UPDATED FSAR LOAD CASES:
i) AXIAL LOAD 2) M T DUE TO PIPE SPLIT d)
AXIAL LOAD OUE TO PIPE SPLIT PAST 4) g. g AuO TOaS10~ DuE TO A eiee SPLir 4S7
,
(2) T)E WAXIMUM ABSOLUTE VALUE FOR EACH LOAD COMPONENT IS SHOWN.
_ _ _ _ _
______ _ _ _ _ _ _ _ _ _ _ _ _ _ -
_ _ _ _ _ _ _ _ _ _ _ _
e o
aF y
'
=[
,
c
.
'
r
~
/
\\
"
'
\\-
!
'\\
-
/
,/
-
- '
g-s C
'
,
,
.
u)
'
F Z HW EW
=0 W
/
\\
/
\\-
'
-\\
/
'
6'-
N
.
s z
.
SPACE FRAME
,
. _ _ _ _.
- - - - - - -
SUMMARY DESIGN BASIS HISTORY l
RESULTS AND CONCLUSIONS
.
- ORIGINAL DESIGN BASIS IS j
CONSERVATIVE
- CONFIRMED BY SAMPLE EVALUATIONS USING CURRENT LOADS
- NO MODIFICATIONS ARE REQUIRED FOR DRESDEN 2 LPCI
/
..
m
.
-
.
,
-,
-
_ _ _ _ _ _ _ _ _
l OUTSIDE. OF i
c INSIDE OF CONTA)NMENT WALL'
'CO NTAIN M E NT WALL i' !
!
d L I M E R @..
a
/
<
.
.
_a x
.
..:
- I C7
4 h
-
' ^ '
I.
1 A I
,
i
____________
_ _ ____________,____
,
/
~
//
d Cy d *d
\\
~
i
~
=
6 8= Q)__ _________________________0____
__)6fc Y
j U
. '.......
.............
N3 I
i I-
'
h,4 ys f4 h
,4:
j
,A S LE EV E
-
b
,,", ' 4 (
,
(IN PL ACE)
-
o'i
.,
d-j j
.
Riws 4.
CONC. AMCHORS
-
-
LUG BARS
/
.
..
'
TYPICAL CONTAINMENT PENETRATION DETAll LASALLE COUNTY STATION
.
UNITS 142
-
,
..
_ _ _ _ _ _ _.
_-
LASALLE, BYRON AND BRAIDWOOD
'
.
LOADS USED FOR CONTAINMENT PENETRATION ANALYSIS WERE AS FOLLOWS:
- PIPE BREAK LOADS
- AS-BUILT PIPING ANALYSIS LOADS