IR 05000250/1986043
| ML17347A163 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 11/20/1986 |
| From: | Masnyk O, Mcguire D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML17347A162 | List: |
| References | |
| 50-250-86-43, 50-251-86-43, NUDOCS 8612020358 | |
| Download: ML17347A163 (2) | |
Text
~p,R REQy>
Report Nos.:
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTASTREET, N.W.
ATLANTA,GEORGIA 30323
<OV 2< t986 50-250/86-43 and 50-251/86-43 Licensee:
Florida Power and Light Company 9250 West Flaglet Street Miami', FL 33102 Docket Nos.:
50-250 and 50-251 License Nos.:
DPR-31 and DPR-41 Facility Name:
Turkey Point 3 and 4 Inspection Conducted:
October 27-31, 1986 Inspector:
. &i'm
~
~
p0rysia M. Ma, Physical Security Spec>alist Approved by:
)a D.
R. McGuire, Chief, Physical Security Section Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards Date gned D te sgned SUMMARY
~
~
~
~
~
~
~
~
~
)
Scope:
This routine inspection involved a
review of the following areas:
Security Organization, Program Audit, Testing and Maintenance, Barriers-Protected Area, Barriers - Vital Areas, Assessment Aids, and Access Control of Personnel, Packages and Vehicles.
This inspection also involved a review of the Fitness for Duty Program and the background investigations of FP&L employees.
This was done at the corporate headquarters in Miami.
Results:
No violations of regulatory, requirements were identified.
86120 Dcp, 0>
pDR
'.
t sse 8"~ oa5o
@9~
@90 a
@Nc<03U SAFg~IJ~
011'~S Rg c spy s Igfpp>>
AHDs
~~<<>r
<<zz oz~
~~~ airs Bcpl>p<<
SAFEGLIARDS INFORMATION
I 8
4 4 g
g lt Ef It
0 t~
~
/
, h