IR 05000250/1986038

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-250/86-38 & 50-251/86-38
ML20213E804
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/04/1986
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML20213E806 List:
References
NUDOCS 8611130293
Download: ML20213E804 (1)


Text

3 ,. i NOV 0 41986 Florida Power and Light Company ATTN: Mr. C. O. Woody Group Vice President Nuclear Energy Department P. O. Box 14000 Juno Beach, FL 33408 Gentlemen:

SUBJECT: REPORT NOS. 50-250/86-38 AND 50-251/86-38 Thank you for your response of October 24, 1986, to our Notice of Violation

"

issued on September 25, 1986, cencerning activities conduc'ted at your Turkey Point facility. We have evaluated your response and found that it meets the *

requirements of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte

Sincerely, Original Signed by Luis A. Reyes /for Roger D. Walker, Director Division of Reactor Projects cc: C. M. Wethy, Vice President Turkey Point Nuclear Plant C. J. Baker, Plant Manager Turkey Point Nu: lear Plant L. W. Bladow, Plant QA Superintendent J. Arias, Jr., Regulatory and Compliance Supervisor bec: IE File NMSS/SGPL NRR/DL/SSPB NRC Resident Inspector Document Control Desk, 016 State of Florida RII

'

RI RII

// 4//A RI f'

(f .

-

/ R eg f/SE1 od bg CM' a snyk:lb 0McGuire - !C ine J r DVerrelli 0/j/ /86

{f0/ /86 1// /86 1l/j/86 10/ /86 19, /86 8611130293 861104 PDR G

ADOCK 05000250 - I PDR [ .