ML17347A161

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-250/86-43 & 50-251/86-43 on 861027-31.No Violations or Deviations Noted
ML17347A161
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/24/1986
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Woody C
Florida Power & Light Co
Shared Package
ML17347A162 List:
References
NUDOCS 8612020352
Download: ML17347A161 (4)


See also: IR 05000250/1986043

Text

SAFEGUARDS INFORMATION

XOV 24 @86

Docket Nos.

50-250,

50-251

License

Nos.

DPR-31,

DPR-41

. Florida Power and Light Company

ATTN:

Mr. C. 0.

Woody

Group Vice President

Nuclear

Energy Department

P. 0.

Box 14000

Juno

Beach,

FL

33408

Gentlemen:

SUBJECT:

NRC INSPECTION

REPORT

NOS

~ 50-250/86-43

AND 50-251/86-43

This refers

to the Nuclear

Regulatory

Commission

(NRC) inspection

conducted

by

Orysia

M. Masnyk

on

October 27-31,

1986.

The inspection

included

a review of

activities authorized for your Turkey Point facility.

At the conclusion

of the

inspection,

the

findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined during the inspection

are identified in the report.

Within these

e

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of activities

in progress.

Within the

scope of the inspection,

no violations or deviations

were identified.

In accordance

with

10 CFR 2.790(d)

and

10 CFR 73.21,

safeguards

activities

and

security measures

are

exempt from public disclosure;

therefore,

the enclosure

to

this letter,

with the

exception

of the report

cover

page

which presents

a

nonexempt

summary, will not be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

David M. Verrelli, Chief

Reactor

Projects

Branch

2

Division of Reactor

Projects

Enclosure:

NRC Inspection

Report

8<1P0P0852

8611~0260

pDp

ADOCK 0 o pD~

6

SAFE'GUARDS tNFORMAT!ON

gNGLOSURp gggTAZNS

pht'F. ZS D<gggTRO

of> (-

)'()jl) 'p,, QQI

p

&fili'T.03 ZRPrGD

Jf

AOXltu<<P~QRlii PCl1AUP~'-'.5

'"

t tO'10 t%'4$L'~i7" !lC'

03d JOSl7RO'J"g

g '4 \\

><~go lN~ ~~ '

SAFEGUARDS INFORMATiOiN

NOV 2C )986

Florida Power

and Light Company

cc w/encl:

C.

M. Wethy, Vice President

Turkey Point Nuclear Plant

C. J.

Baker, Plant Manager

Turkey Point Nuclear Plant

L.

W. Bladow, Plant

gA Superintendent

J. Arias, Jr.,

Regulatory

and Compliance

Supervisor

bcc w/encl:

IE File

NMSS/SGPL

NRR/DL/SSPB

bcc w/Inspection

Summary:

Document Control Desk,

016

NRC Resident

Inspector

State of Florida

RI

t

4

SElvol

6

(

'I 11/

/86

EN'S~,

SAPECU4R

ONE

UPON SEP~

~OBErATEON

o]r g-'"

ECONgg0

t

RII

OMasnyk: lb

11/

/86

WCl i

11

86

D c uire

11/g,0/86

SAFEGUARDS lNFORMATIOg

N>>

P

'

~ I

I

+pl[

I I 'I