Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-250/86-40 & 50-251/86-40.Compensatory Measure Proposed Adequate as Interim Measure
ML17347A235
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/29/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML17347A236 List:
References
NUDOCS 8701050515
Download: ML17347A235 (2)


Text

DEC 29 1986 t

Florida Power and Light Company ATTN:

Mr. C. 0.

Woody Group Vice President Nuclear Energy Department P.

O.

Box 14000 Juno Beach, FL 33408 Gentlemen:

SUBJECT:

REPORT NOS. 50-250/86-40 AND 50-251/86-40 Thank you for your response of December 8, 1986, to our Notice of Violation issued on October 23, 1986, concerning activities conducted at your Turkey Point facility.

We have evaluated your response and found that it meets the requirements of 10 CFR 2.201.

The compensatory measure you propose appears to be an adequate interim measure.

Please advise us when you are ready to implement the final corrective action so that we may evaluate the corrective measures.

We appreciate your cooperation in this matter.

Sincerely, J.

Nelson Grace Regional Administrator cc:

C.

M. Wethy, Vice President Turkey Point Nuclear Plant C. J.

Baker, Plant Manager Turkey Point Nuclear Plant L.

W. Bladow, Plant QA Superintendent J. Arias, Jr.,

Regulatory and Compliance Supervisor bcc:

IE File NMSS/SGPL NRR/DL/SSPB Document Control Desk, 016 NRC Resident"Inspector State of Flori,da RII OMasnyk:er 12/M/86 12/Zg /86 12@/(f86

++6-Shod- ~ <a~

12/Zf/86 Q RIIy DVerre 1 1 i 12/~ J(86 RII RWa er 12/Zt/86 8701050515 861229 PDR ADOCK 05000250 Q

PDR u

2'/86 RII rnst 12/Af/86

P8"l'6 '""~

j I

'I I

1