Ack Receipt of 880912 Revised Response of Steps Taken to Correct Violations Noted in Insp Repts 50-250/86-06 & 50-251/86-06
ML17347A866
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/06/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Conway W
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8810240364
Download: ML17347A866 (2)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 8810240364 DOC. DATE: 88/10/06 NOTARIZED:

NO FACIL: 50-250 Turkey Point Planti Unit 3. Florida Poeer and Light C

50-251 Turkey Point Plant.

Unit 4, Florida Power and Light C

AUTH. NAME AUTHOR AFFILIATION HERDTi A. R.

Region 2i Ofc of-the Director RECIP. NAME

.

RECIPIENT AFFILIATION CONWAYi W. F.

Florida Power 5 Light Co.

S UBJECT:

Ack receipt oF 880912 ltr inForming NRC o8 steps taken to correct 'violations noted in Insp Rept 50-250/86-06.

DISTRIBUTION CODE:

IEOID COPIES RECEIVED: LTR J ENCL Q SIIE:

TITLE: General (50 Dkt)-Insp Rept/Notice of-Violation Response NOTES DOCKET ¹ 05000250 05000251 RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL-.

AEOD NRR MOR ISSEAUi D NRR/DLPG/GAB 10 NRR/DREP/EPB

NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC/HDS2 RES/DSR DEPY XTERNAL:

LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME'DISON'

DEDRO NRR/DLPG/PEB

NRR/DOEA DIR

NRR/DREP/RPB

NRR/PMAS/ ILRB12 Bgg.MANiJ G

~

RGN2 FILE

NRC PDR COPIES LTTR ENCL

1

2

1

TOTAL NUMBER OF COPIES REQUIRED:

LTTR

ENCL

OcT 06 >IIII lorida Power and Light Company

~

~

ATTN:

Mr. W.

F.

Conway Senior Vice President - Nuclear P. 0.

Box 14000 Juno Beach, FL 33408-0420 Gentlemen:

r SUBJECT:

REPORT NOS. 50-250/86-06 AND 50-251/86-06 Thank you for your revised response of September 12, 1988, to our Notice of Violation, issued on April 15, 1986, concerning activities conducted at your Turkey Point facility under NRC DPR-31 and DPR-41.

We have evaluated your response and found that it meets the requirements of 10 CFR 2.201.

We will examine the implementation of your corrective actions during future inspections.

We appreciate your cooperation in this matter.

Sincerely, ORIGINAL SIGNEb BV ALAN R. HERDT Alan R. Herdt, Chief

.

Engineering Branch Division of Reactor Safety cc: W S.

Odom, Vice President Turkey Point Nuclear Plant W E. Cross, Plant Manager Turkey Point Nuclear Plant W. Bladow, Plant gA Superintendent L4. Arias, Jr., Regulatory and Compliance Supervisor State of Florida bceuf E. Edison, Project Manager, Project Directorate II-2, Division of Reactor Projects, NRR WRC Resident Inspector DRS Technical Assistant Document Control Desk

'

eiysorge: tj g/88 P/88

/

/88 8810240364 881006 PDR ADQCK 05000250 PDC