IR 05000244/2025004
| ML26040A033 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 02/09/2026 |
| From: | Jason Schussler Division of Operating Reactors |
| To: | Mudrick C Constellation Energy Generation, Constellation Nuclear |
| References | |
| IR 2025004 | |
| Download: ML26040A033 (0) | |
Text
February 9, 2026
SUBJECT:
R.E. GINNA NUCLEAR POWER PLANT - INTEGRATED INSPECTION REPORT 05000244/2025004
Dear Christopher Mudrick:
On December 31, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at R.E. Ginna Nuclear Power Plant. On January 21, 2026, the NRC inspectors discussed the results of this inspection with Richard Everett, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
No NRC-identified or self-revealing findings were identified during this inspection.
A licensee-identified violation which was determined to be of very low safety significance is documented in this report. We are treating this violation as a non-cited violation consistent with Section 2.3.2 of the Enforcement Policy.
If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; and the NRC Resident Inspector at R.E. Ginna Nuclear Power Plant. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Jason E. Schussler, Chief Projects Branch 1 Division of Operating Reactor Safety
Docket No. 05000244 License No. DPR-18
Enclosure:
As stated
Inspection Report
Docket Number:
05000244
License Number:
Report Number:
Enterprise Identifier: I-2025-004-0044
Licensee:
Constellation Energy Generation, LLC
Facility:
R.E. Ginna Nuclear Power Plant
Location:
Ontario, New York
Inspection Dates:
October 1, 2025 to December 31, 2025
Inspectors:
C. Swisher, Senior Resident Inspector
K. Poolman, Resident Inspector
C. Borman, Health Physicist
B. Dyke, Senior Operations Engineer
Approved By:
Jason E. Schussler, Chief
Projects Branch 1
Division of Operating Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at R.E. Ginna Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. A licensee-identified non-cited violation is documented in report section: 71111.1
List of Findings and Violations
One licensee-identified non-cited violation is documented in this report.
Additional Tracking Items
None.
PLANT STATUS
Ginna began the inspection period operating at 100 percent rated thermal power and remained at, or near, rated thermal power for the duration of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
Impending Severe Weather Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated the adequacy of the overall preparations to protect risk significant systems from impending snow and cold weather on November 10, 2025.
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (1 Sample)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
(1)
'A' vital battery on November 25, 2025
Complete Walkdown Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated system configurations during a complete walkdown of the spent fuel pool cooling system on December 2, 2025.
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (1 Sample)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
(1)
'B' battery room on October 16, 2025
71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance
Requalification Examination Results (IP Section 03.03) (1 Sample)
- (1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the biennial written examinations completed on February 14, 2025, and the requalification annual operating exam completed on November 21, 2025.
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator performance in the control room on October 28, 2025.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator performance in the simulator during licensed operator training on November 18, 2025.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (1 Sample)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components remain capable of performing their intended function:
- (1) Visual in-service testing of piping and valves for the 'D' standby auxiliary feedwater system on October 30, 2025
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (3 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
- (1) Operability assessment of the safety injection accumulators following increased frequency of accumulator level adjustments on October 28, 2025
- (2) Operability assessment of the 'B' vital battery train when the 'B' battery charger failed to equalize voltage after card replacement on October 30, 2025
- (3) Operability assessment of control room envelope habitability after discovering missing radiation shielding on December 8, 2025
71111.24 - Testing and Maintenance of Equipment Important to Risk
The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:
Post-Maintenance Testing (IP Section 03.01) (3 Samples)
- (1) Functionality testing of the 'B' spent fuel pool cooling pump on October 8, 2025
- (2) Operability testing of pressurizer safety relief valves on November 12, 2025
- (3) Operability testing of the 'D' standby auxiliary feedwater pump suction relief valve 9709B on November 13, 2025
Surveillance Testing (IP Section 03.01) (2 Samples)
- (1) S-29.2, "Charging Reactor Vessel Over-Pressure Protection System," on October 20, 2025
- (2) STP-O-16QB, "Auxiliary Feedwater Pump B - Quarterly," on October 20, 2025
Reactor Coolant System Leakage Detection Testing (IP Section 03.01) (1 Sample)
- (1) Elevated unidentified leakage on December 2, 2025
71114.06 - Drill Evaluation
Additional Drill and/or Training Evolution (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated an emergency drill in the simulator control room and technical support center involving an Alert, Site Area Emergency, and General Emergency declaration due to a scenario which contained, but was not limited to, a simulated loss of coolant accident which later combined a loss of containment and fuel failure on October 7, 2025.
RADIATION SAFETY
71124.05 - Radiation Monitoring Instrumentation
Walkdowns and Observations (IP Section 03.01) (5 Samples)
The inspectors evaluated the following radiation detection instrumentation during plant walkdowns:
- (1) Ludlum Model 177 S/N 0018179 Spent Fuel Pool area
- (2) Rad-Pro 5 S/N 0023560 Hot Shop
- (3) Ludlum Model 3 S/N 0012088 Hot Shop
- (4) Canberra Argos 5-AB Zeus S/N 1012-332 Access Control
- (5) Alpha Beta Sample Counter Ludlum 3030P S/N 0023203 Containment Storage Building
Calibration and Testing Program (IP Section 03.02) (10 Samples)
The inspectors evaluated the calibration and testing of the following radiation detection instruments:
- (1) Victoreen High Range Detector R-29
- (2) Victoreen High Range Detector R-30
- (3) Ludlum Model 177 S/N 0022703
- (4) Canberra Argos-5AB Zeus S/N 1012-334
- (5) Thermo Scientific Small Article Monitor 12 (SAM-12) S/N 12042
- (6) Canberra Gem-5 S/N 1012-253
- (7) Canberra GP100C2S Radiation Area Monitor R-34 S/N 13000080
- (8) Mirion Fastscan S/N 13000021
- (9) Fluke Biomedical Radiation Area Monitor R-9 S/N 3603001
- (10) Victoreen Model 977-201 Radiation Area Monitor R-4 S/N 318
Effluent Monitoring Calibration and Testing Program Sample (IP Section 03.03) (2 Samples)
The inspectors evaluated the calibration and maintenance of the following radioactive effluent monitoring and measurement instrumentation:
- (1) Containment Noble Gas Gaseous Effluent Monitor R-12
- (2) Steam Generator Blowdown Liquid Effluent Monitor R-19
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)
- (1) For the period October 1, 2024 through September 30, 2025 PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual
Radiological Effluent Occurrences Sample (IP Section 02.16) (1 Sample)
- (1) For the period October 1, 2024 through September 30, 2025 71152A - Annual Follow-up Problem Identification and Resolution
Annual Follow-up of Selected Issues (IP Section 03.03) (1 Sample)
- (1) The inspectors reviewed the licensees implementation of its corrective action program related to the long term action plan to address increased leakage out of 'B' safety injection back into emergency core cooling system piping and the effects on gas voids.
71152S - Semiannual Trend Problem Identification and Resolution
Semiannual Trend Review (IP Section 03.02) (1 Sample)
- (1) The inspectors reviewed the licensees corrective action program for potential emerging or adverse trends that might be indicative of a more significant safety issue on December 9, 2025.
INSPECTION RESULTS
Licensee-Identified Non-Cited Violation 71111.15 This violation of very low safety significance was identified by the licensee and has been entered into the licensees corrective action program and is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.
Violation:
Title 10 of the Code of Federal Regulations Part 50, Appendix B, Criterion III, "Design Control," requires, in part, that design changes, including field changes, shall be subject to design control measures commensurate with those applied to the original design and be approved by the organization that performed the original design.
Contrary to the above, from October 15, 2024 to September 18, 2025, Constellation personnel changed the design of containment building shielding material without subjecting the change to design control measures commensurate with those applied to the original design and without approval by the organization that performed the original design. Specifically, on October 15, 2024, Constellation commenced reactor startup following a refueling outage without reinstalling the containment shield blocks normally located at the containment equipment hatch. The blocks were reinstalled on September 18, 2025, shortly after station personnel identified that the blocks were required as part of the facility design basis.
The blocks are relied upon in the facility design basis because they provide for radiation shielding assumptions used in the radiation dose calculations that were performed as part of the Control Room Envelope (CRE) Habitability Program, as required by Ginna Technical Specification 5.5.16. Specifically, the radiation shielding properties of the concrete blocks are relied upon in dose calculations that ensure adequate radiation protection is provided to permit access and occupancy of the CRE under design basis accident conditions without personnel receiving radiation exposures in excess of 5 rem total effective dose equivalent.
Significance/Severity: Green. The inspectors evaluated the significance of this issue in accordance with IMC 0609, Appendix A, "The Significance Determination Process for Findings At-Power," and determined that the issue was Green because Exhibit 3 question D.1 was answered YES. Specifically, the issue only represented a degradation of the radiological barrier function provided for the control room.
Corrective Action References: 04896959
Minor Performance Deficiency 71152A Gas Intrusion Management Program Monitored through Incorrect Procedures
Minor Performance Deficiency: In response to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, Constellation developed the gas intrusion management program to mitigate and analyze for voids in the emergency core cooling system. Constellation identified safety injection accumulator leakage in action request 04897753, B Safety Injection Accumulator TSI03B Increased Leakage, dated September 14, 2025. The inspectors subsequently conducted an inspection of the gas intrusion management program and identified two procedures that were performed with incorrect procedure steps, which constituted a performance deficiency.
On September 3, 2025, Constellation performed O-6.11, Attachment 22, SI and RHR System Void Inspections, revision 262. Step 1.6.2 directed the operator to analyze A safety injection accumulator for level change when B safety injection accumulator should have been required to be analyzed.
On October 13, 2024, Constellation performed O-1.1D, Plant Requirement Check List for Heatup Greater than 350F, revision 068. Step 6.5.8 directed the operator to ensure emergency core cooling system piping is sufficiently filled with water per EP-UT-104, Ultrasonic Examination to Determine Water/Liquid Level. EP-UT-104 was cancelled and superseded on January 19, 2016.
Screening:
The inspectors determined the performance deficiency was minor. The inspectors evaluated the performance deficiency in accordance with the guidance in IMC 0612, Appendix B, Issue Screening, and determined the issue was minor because, although Constellation executed procedures with errors, it did not represent a failure to meet the mitigating systems cornerstone objective to ensure availability, reliability, and capability of the system to respond to initiating events to prevent undesirable consequences. Specifically, O-6.11, attachment 22, step 1.6 was able to be completed through step 1.6.1, and 1.6.2 was a redundant step and therefore the intent of the procedure was satisfied.
Additionally, procedure ER-AA-335-007, Ultrasonic Inspection for Determination of Sedimentation in Piping Systems of Components and Fluid Level Measurements, superseded EP-UT-104 and, was performed satisfactorily, satisfying the intent of O-1.1D.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified that no proprietary information was retained or documented in this report.
- On December 4, 2025, the inspectors presented the radiation monitoring instrumentation inspection results to Richard Everett, Site Vice President, and other members of the licensee staff.
- On January 21, 2026, the inspectors presented the integrated inspection results to Richard Everett, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Work Orders
C20803058
Perform VT-3 Exam on Bolting for Valve 8664
C93909276
Repair Broken Reach Rod Assembly for Valve 650J
Procedures
FRP-18.0
Battery Room B
Revision 008
Corrective Action
Documents
04901741
VT-2 Inspections not Performed with WO 69387315
09/30/2025
Procedures
STP-O-36-COMP-
D
Standby Auxiliary Feedwater Pump D - Comprehensive Test
Revision 027
Corrective Action
Documents
04896959
Untimely Restoration of E-Hatch Blocks into Normal
Configuration
09/11/2025
04897753
B SI Accumulator TS103B Increased Leakage
09/14/2025
04909676
BYCB Wouldn't Equalize when the Equalize Button was
Pushed
10/28/2025
Corrective Action
Documents
04911406
Removed Pressurizer Safety Valve Spring Rate OOT
11/03/2025
Calculations
DA-ME-11-009
Gas Void Limits in RHR and SI Systems
DA-ME-12-004
SI Accumulator Off-Gassing Analysis
DA-ME-14-021
Gas Accumulation Technical Specification Surveillance
Requirements
Corrective Action
Documents
04897753
D SI Accumulator TSI03B Increased Leakage
09/14/2025
Corrective Action
Documents
Resulting from
Inspection
04912629
NRC-identified C2P
11/06/2025
04914714
NRC ID: C2P: O-1.1D
11/14/2025
Procedures
GIMP-PROGPLAN Gas Intrusion Management Program
Revision 8
O-6.11
Surveillance Requirements/Routine Operations Check Sheet
2