IR 05000244/2025001

From kanterella
Jump to navigation Jump to search
Integrated Inspection Report 05000244/2025001
ML25132A200
Person / Time
Site: Ginna 
Issue date: 05/12/2025
From: Jason Schussler
Division of Operating Reactors
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2025001
Download: ML25132A200 (1)


Text

May 12, 2025

SUBJECT:

R.E. GINNA NUCLEAR POWER PLANT - INTEGRATED INSPECTION REPORT 05000244/2025001

Dear David Rhoades:

On March 31, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at R.E. Ginna Nuclear Power Plant. On April 24, 2025, the NRC inspectors discussed the results of this inspection with Brendon Wade, Acting Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jason E. Schussler, Chief Projects Branch 1 Division of Operating Reactor Safety

Docket No. 05000244 License No. DPR-18

Enclosure:

As stated

Inspection Report

Docket Number:

05000244

License Number:

DPR-18

Report Number:

05000244/2025001

Enterprise Identifier: I-2025-001-0053

Licensee:

Constellation Energy Generation, LLC

Facility:

R.E. Ginna Nuclear Power Plant

Location:

Ontario, New York

Inspection Dates:

January 1, 2025 to March 31, 2025

Inspectors:

C. Swisher, Senior Resident Inspector

K. Poolman, Resident Inspector

Approved By:

Jason E. Schussler, Chief

Projects Branch 1

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at R.E. Ginna Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Ginna began the inspection period operating at rated thermal power and remained at, or near, rated thermal power for the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1)

'A' motor driven auxiliary feedwater pump on January 26, 2025 (2)

'B' charging pump on January 29, 2025 (3)

'A' containment spray on February 25, 2025 (4)

'A' emergency diesel generator on March 18, 2025

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Control room on January 22, 2025
(2) Relay room on January 23, 2025 (3)

'A' battery room on January 26, 2025

(4) Charging pump room on March 21, 2025

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the on-site fire brigade training and performance during an unannounced fire drill on March 20, 2025

71111.06 - Flood Protection Measures

Flooding Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated internal flooding mitigation protections in the intermediate building cold side when a change in plant configuration introduced an additional source of service water on March 31, 2025

71111.07A - Heat Exchanger/Sink Performance

Annual Review (IP Section 03.01) (1 Sample)

The inspectors evaluated readiness and performance of:

(1) 'A' component cooling water heat exchanger on March 21, 2025

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated the following licensed operator performance in the control room:

'B' residual heat removal quarterly test on March 24, 2025

  • Turnover activities on March 27, 2025

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the simulator during licensed operator training on January 28, 2025

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Evaluation of plant risk (Action Green) during planned maintenance and calibrations on channel 4 of the reactor protection system on February 4, 2025
(2) Evaluation of plant risk (Action Green) during planned maintenance and calibrations on motor operated valve 860B 'A' containment spray pump discharge valve on March 3, 2025
(3) Evaluation of plant risk (Green) on the 'A' train of spent fuel pool cooling due to an expected loss of margin to reach the time to boil in the spent fuel pool post refueling outage on March 3, 2025
(4) Evaluation of plant risk (Action Green) during planned maintenance and tube cleaning on 'A' component cooling water heat exchanger on March 11, 2025

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Operability assessment of the 'B' control room emergency air treatment system discharge damper actuator after discovery of a minor oil leak on January 6, 2025
(2) Functionality assessment of the fire header system after a through wall pipe leak was discovered due to pipe thinning on January 27, 2025
(3) Operability assessment of the motor operated valve 896B refueling water storage tank outlet isolation valve to safety injection after a degrading trend for closing thrust was discovered on January 29, 2025
(4) Operability assessment of the 'A' train core exit thermocouples after the plant processing computer indicated a failure on February 12, 2025

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1) PCR-24-02024, Modification to service water configuration to provide alternate chiller cooling water on January 28, 2025

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:

Post-Maintenance Testing (IP Section 03.01) (3 Samples)

(1) Functional testing of the technical support center emergency diesel generator following planned maintenance on January 8, 2025
(2) Operability testing of relief valve 4659, service water relief for 'C' recirculation fan cooler, following planned maintenance on January 27, 2025
(3) Post-maintenance testing of piping associated with 'C' safety injection pump on March 26, 2025

Surveillance Testing (IP Section 03.01) (2 Samples)

(1) STP-O-17.2, "Process Radiation Monitors R-11 Thru R-22 and Iodine Monitors R-10A and R-10B Source Check, Alarm Setpoint Verification, and Functional Test," on January 16, 2025
(2) STP-O-2.1QA, "Safety Injection Pump 'A' Quarterly Test," on March 18, 2025

71114.06 - Drill Evaluation

Required Emergency Preparedness Drill (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated an emergency drill in the simulator control room and technical support center involving an Alert, Site Area Emergency, and General Emergency declaration due to a scenario which contained, but was not limited to, a simulated loss of coolant accident which later combined a loss of containment and fuel failure on February 4,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01)===

(1) For the period January 1, 2024 through December 31, 2024

IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (1 Sample)

(1) For the period January 1, 2024 through December 31, 2024

IE04: Unplanned Scrams with Complications Sample (IP Section 02.03) (1 Sample)

(1) For the period January 1, 2024 through December 31,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On April 24, 2025, the inspectors presented the integrated inspection results to Brendon Wade, Acting Plant Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.18

Miscellaneous PCR-24-02652/T-36.1

Alternate Cooling Lineup to A/C Chillers

055

Engineering

Evaluations

ESR-24-0145

Evaluate T-36.1 New Attachment for Alternate Chiller SW

Supply Through Fire Penetration

000