SUBJECT:
R.E. GINNA NUCLEAR POWER PLANT - SECURITY BASELINE INSPECTION REPORT 05000244/2025420
Dear Richard Everett:
On December 3, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at R.E. Ginna Nuclear Power Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
Due to the temporary cessation of government operations, which commenced on October 01, 2025, the NRC began operating under its Office of Management and Budget-approved plan for operations during a lapse in appropriations. Consistent with that plan, the NRC operated at reduced staffing levels throughout the duration of the shutdown. However, the NRC continued to perform critical health and safety functions and make progress on other high-priority activities associated with the ADVANCE Act and Executive Order 14300. On November 13, 2025, following the passage of a continuing resolution, the NRC resumed normal operations.
However, due to the 43-day lapse in normal operations, the Office of Nuclear Reactor Regulation granted the Regional Offices an extension on the issuance of the calendar year 2025 inspection reports that should have been issued by November 07, 2025, to December 23, 2025. The NRC resumed the routine cycle of issuing inspection reports on November 13, 2025.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
December 18, 2025
Sincerely, Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations Docket No. 05000244 License No. DPR-18
Enclosure:
As stated
Inspection Report
Docket Number:
05000244
License Number:
Report Number:
Enterprise Identifier:
I-2025-420-0015
Licensee:
Constellation Energy Generation, LLC
Facility:
R.E. Ginna Nuclear Power Plant
Location:
Ontario, NY
Inspection Dates:
August 18, 2025, to October 03, 2025
Inspectors:
J. Berry, Team Leader, NSIR
C. Davis, Physical Security Inspector, RI
D. Hostetter, Senior Physical Security Inspector, NSIR
T. Weir, Physical Security Inspector, RIV
Approved By:
Jefferson K. Clark, Chief
Security Performance Evaluation Branch
Division of Security Operations
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at R.E. Ginna Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.03 - Contingency Response - Force-On-Force Testing
Contingency Response - Force-On-Force Testing (1 Sample)
- (1) NRC inspectors completed the Contingency Response - Force-on-Force (FOF)
Testing inspection procedure by evaluating the licensees performance in implementing the physical protection program to detect, assess, interdict, and neutralize threats up to, and including, the design basis threat of radiological sabotage. One NRC-evaluated FOF exercise was conducted for the evaluation. One exercise was cancelled due to the temporary cessation of government operations (i.e.
2025 Government Shutdown), which commenced on October 01, 2025, which the second evaluated exercise was scheduled to be conducted.
REPORT ATTACHMENTS
Supplemental Information for the report is considered Safeguards Information and is located separately within the NRCs Safeguards Information Local Area Network and Electronic Safe database (SLES), under NS126201.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On December 3, 2025, the inspectors presented the security baseline inspection results to Richard Everett, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
Corrective
Actions
N/A
Corrective Action
Documents
Corrective
Actions
N/A
Corrective Action
Documents
Resulting from
Inspection
Corrective Action
09/30/2025
Corrective Action
Documents
Resulting from
Inspection
Corrective Action
9/30/2025
Corrective Action
Documents
Resulting from
Inspection
Corrective Action
09/30/2025
Procedures
Procedures
BT47SAT600
Laser Safety Certification
2/2/2009
Procedures
Ginna Security Composite Blasts Analysis
Revision 8
Procedures
CNG-FES-015
Engineering Service Request
Revision 2
Procedures
New York State
Law, Penal Law,
Section 3.5
Defense of Justification
5/28/2019
Procedures
Physical Security
Plan
- R.E. Ginna Nuclear Power Plant Security Plan, Training and
Qualification Plan, Safeguards Contingency Plan, and
Independent Spent Fuel Storage Installation Security
Program
Revision 16
Procedures
Job Hazard Analysis
Revision 9
Procedures
Testing Security Equipment
Revision 23
Procedures
SY-AA-101-122-
101
Performance of Perimeter Intrusion Detection/Camera
System Tests
Revision 0
Procedures
Security Responsibilities for Station Personnel
Revision 30
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
SY-AA-101-133-
F-01
Supporting Law Enforcement Agency Response Capability
Revision 8
Procedures
Security Standards of Conduct
Revision 19
Procedures
SY-AA-150-1006-
F-01
Responder Timeline Worksheet
Revision 2
Procedures
SY-AA-150-1006-
F-02
Adversary Timeline Worksheet
Revision 2
Procedures
SY-AA-150-101-
F-48
SAAB/UTM Orientation and Safety Brief
Revision 1
Procedures
SY-AA-150-101-
F-48
Security Drill and Exercise Controller Training
Revision 0
Procedures
SY-AA-150-101-
F-48
Use of Force Continuum
Revision 1
Procedures
Security Drills and Exercises
Revision 1
Procedures
Duties and Responsibilities of the Nuclear Security
Organization
Revision 23
Procedures
SY-GI-101-122-
1001
Ginna Security Equipment Testing
Revision 26
Procedures
SY-GI-101-122-
1001-F-01
CAS/SAS Communication Check List
Revision 7
Procedures
SY-GI-101-501
Station Security Defensive Strategy Procedure
Revision 13
Procedures
SY-GI-101-502
Station Security Target Sets
Revision 3
OFFICE
NSIR/DPCP/RSB
NSIR/DSO/SPEB
/ETB
R-I/DRSS/SEPIR
NSIR/DSO/SPEB
/ETA
NAME
DHostetter
JBerry
CDavis
JClark
DATE
Dec 16, 2025
Dec 16, 2025
Dec 18, 2025
Dec 18, 2025