April 17, 2025
SUBJECT:
R.E. GINNA NUCLEAR POWER PLANT - SECURITY BASELINE INSPECTION REPORT 05000244/2025401
Dear David Rhoades:
On April 9, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at R.E. Ginna Nuclear Power Plant and discussed the results of this inspection with Richard Everett, Acting Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Brice A. Bickett, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety & Security
Docket No. 05000244 License No. DPR-18
Enclosure:
As stated
Inspection Report
Docket Number:
05000244
License Number:
Report Number:
Enterprise Identifier: I-2025-401-0018
Licensee:
Constellation Energy Generation, LLC
Facility:
R.E. Ginna Nuclear Power Plant
Location:
Ontario, NY
Inspection Dates:
February 10, 2025 to April 09, 2025
Inspectors:
D. Caron, Senior Physical Security Inspector
J. Edwards, Physical Security Inspector
K. Hussar, Senior Physical Security Inspector
M. Ordoyne, Physical Security Inspector
Approved By:
Brice A. Bickett, Chief
Security, Emergency Preparedness and Incident Response Branch
Division of Radiological Safety & Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at R.E. Ginna Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.01 - Access Authorization
The inspectors evaluated the access authorization program. The following elements were
===evaluated:
Access Authorization===
(1)
- Tier I: All requirements
- Tier II: All requirements
- Tier III: All requirements
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
===inspection elements:
Access Control===
(1)
- Tier I: All Requirements
- Tier II: All Requirements
- Tier III: 1 Requirement (02.10)
71130.08 - Fitness For Duty Program
The inspectors evaluated the fitness for duty program by completing the following inspection
===elements:
Fitness For Duty Program===
(1)
- Tier I: All Requirements
- Tier II: 26 Requirements (02.05 a - l, 02.06 a - g, 02.07, 02.08, 02.09 a - e)
- Tier III: 8 Requirements (02.10, 02.11, 02.12 a, 02.13 a - e)
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following
===procedure elements:
Security Plan Changes===
- (1) Since the last NRC baseline inspection of this program area, Security Plan Revision 16 was implemented. Based on Ginnas evaluation, and in accordance with 10 CFR 50.54(p)(2), the changes resulted in no decrease in safeguards effectiveness of the security plan and the revised security plan changes continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for a potential decrease in safeguards effectiveness of the security plan; however, this review does not constitute formal NRC approval of those changes. Therefore, the changes remain subject to future NRC inspection in their entirety.
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)
=
- (1) April 1, 2024 through March 31,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On April 9, 2025, the inspectors presented the security baseline inspection results to Richard Everett, Acting Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
Generic Fitness for Duty and Behavior Observation Lesson
Plan
Revision 4
Constellation Industrial/Nuclear Safety and Security
Revision 09
Procedures
Access Authorization Program
Revision 18
Utilizing the Personnel Access Data System (PADS)
Revision 18
Review Criteria for Determining Trustworthiness and
Reliability
Revision 9
Access Authorization In-Processing/Out-Processing of
Personnel
Revision 27
Site Authorization for Unescorted Access
Revision 23
Procedures
Observation and Inspection of Security Barriers
Revision 14
Constellation Security Search Process
Revision 39
SY-AA-101-112-
104
Protected Area Search Process
Revision 0
Control of Security Access Control Devices
Revision 10
Security Response to the Station Emergency Plan
Revision 12
Security Assessment and Response to Unusual Activities
Revision 38
SY-GI-101-115
Controlling Ginna Gates and Power Operated Active Vehicle
Barriers
Revision 13
SY-GI-101-119
Ginna Oca Warehouse Search Activities
Revision 10
Corrective Action
Documents
04852011
04852026
04822699
04728056
04695665
04553220
04825661
04836653
04813802
04788589
04788588
04832208
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
04838263
Procedures
Fatigue Management and Work Hour Limits
Revision 17
Corrective Action Program (CAP) Procedure
Revision 9
Security Events and Nuclear Regulatory Commission
Performance Indicators
Revision 12
Constellation Fitness for Duty Program
Revision 23