Requalification Exam Rept 50-244/89-22OL-RQ on 890809-10. Exam Results:Four Candidates Passed Retake of Simulator Requalification Operating Test & Retake & Completion of Written Exam
ML17250B064
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/03/1989
From: Eselgroth P, Yachimiak E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML17250B063 List:
References
50-244-89-22OL, NUDOCS 8911210273
Download: ML17250B064 (8)


Text

U. S.

NUCLEAR REGULATORY COMMISSION OPERATOR LICENSING REQUALIFICATION PROGRAM EVALUATION REPORT REQUALIFICATION EXAMINATION REPORT NO.: 50-244/89-22 (OL-RQ)

FACILITY DOCKET NO.:

50"244 FACILITY LICENSE NO.:

DPR-18 LICENSEE:

FACILITY:

EXAMINATION DATE:

Rochester Gas and Electric Company 49 East Avenue Rochester, New York 14649 Ginna Nuclear Power Plant August 9 " 10, 1989 C

CHIEF EXAMINER:

Edward Yachimiak, Op ations Engineer ei 3 Date APPROVED BY:

Pdter Eselgroth, Chief, R Section Operations Branch I

Divisi on of Reactor Safety n/~ r~

'Da e

SUMMARY:

A simulator requalification operating test (retake)

and a written, examination (retake and completion)

were administered to two reactor operators (ROs)

and two senior reactor operators (SROs),

respect-ively.

All individuals successfully completed their examinations.

~;

89iiO-"'9$

$

i O~~iOOO244 F-,g,R gDOCK

'-'

pDC V

'

TYPE OF EXAMINATIONS:

EXAMINATION RESULTS:

DETAILS Requalification NRC Gradin I

RO I

SRO I

Pass/Fail Pass/Fail TOTAL Pass/Fail Written N/A 2/0 2/0 Simulator 2/0 N/A 2/0 Walk-through N/A N/A N/A Overall 2/0 2/0 4/0 1.0 SIMULATION FACILITY FIDELITY REPORT:

The simulator 's performance during both scenarios was of high fidelity.

Modelling of all primary and secondary parameters during programmed tran-sient events appeared to closely follow expected plant performance behavior.

2.0 PERSONNEL PRESENT AT EXIT MEETING NRC PERSONNEL N. Perry, Resident Inspector E; Yachimiak, Operations Engineer ROCHESTER GAS AND ELECTRIC PERSONNEL R. Carroll, Ginna Training Manager D. Hudnut, Supervisor Simulator Training F. Maciuska, Supervisor - License Training G. Meier, Division Training Manager T. Schuler, Operations'anager J. Widay, Superintendent - Ginna Production 3.0 SUMMARY OF NRC AND LICENSEE COMMENTS MADE AT THE EXIT MEETING Preliminary results from both the simulator and written examinations were discussed.

Licensee evaluation and grading of the simulator and written examinations indicated that all four individuals had passed.

The NRC

Chief Examiner stated that he was in agreement with those results; and that, pending Regional review, the three retake individuals would be allowed to return to licensed duties.

The Attachment to this report identifies the requalification test item '

ATTACHMENT REQUALIFICATION EXAMINATION TEST ITEMS SCEN NO.

SIMULATOR SCENARIO TYPE 89-5 MFW Pump Trip from 1005 MRPI Failure PZR Safety Valve Fails Open Small Feedline Break Failure of CS Actuation Failure of Turbine Stop Valve

"A" and "8" INOP Increase Break To Maximum WRITTEN EXAMINATION-PART A SCENARIO A1 " S32 QNUMs 2, 3, 4, 6, 7, 8, 10,

SCENARIO A2 S36 2, 6, 7, 9, 10, 11, 12,

WRITTEN EXAMINATION PART 8 QNUMs 8000.35, 8000.42, 8000.113, 8000.129, 8000.140 8000.156, 8000.177, 8000.200, 8001.10, 80002.25, 8002.26, 8003.2, 8003.4, 8004. 15, 8006. 15, 8011.6, 8035.3, 8320.11, 8320.21, 8320.24