Ack Receipt of Re Violation Noted in IE Insp Repts 50-237/81-31 & 50-249/81-23.Violation Withdrawn. Interim Approval of Inservice Test Program Granted by NRR
ML17194A596
Person / Time
Site: Dresden  
Issue date: 04/01/1982
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML17194A597 List:
References
NUDOCS 8204080323
Download: ML17194A596 (1)


Text

~:;f

../,

~

APR 1 1982 Doc1tet No.,50-237 Docket No. 50-249 Commonwealth Edison Company ATTN:

Mr. Cordell Reed Vice President.

Post.Office Box 767 Chicago, IL 60690 Gentlemen:

,_____ -***

n ff'Q *PTLE COP?

Thank you for your letter dated March 15, 1982, documenting discussions between J. Brunner of your st"!ff and K. Connaughton of our staff concerning the December 4, 1981, Notife of Violatio As discussed, interim approval of your Inservice Test Program for Pumps and Valves bad been granted by the NRC's Office of Nuclear Reactor RegUlation, including a request for relief from valve leak rate testing requirements prescribed in Section XI of the ASME Code fo~ Category A containment isolation valve our current understanding is that your requests for relief encompass the requirements for owner specified maximum allowable leak rates for each valve, the requirements for trending valve leak rates and the requirements for taking corrective actio Accordingly, we will adjust our records to reflect that.no violation of regtil.atory requirements occurred with respect to the December 4, 1981 Notic Your cooperation with us is appreciate

Sincerely, Is/ -fn b) l~

~

C. E. Norelius, Director Tnivision of Engineering and Technical Programs cc: Louis O. DelGeorge, Director of Nuclear Licensing D. J. Scott, Station Superintendent cc w/ltr dtd 3/15/82:

DMB/Document Control Desk (RIDS)

Resident Inspector, RIII Mary Jo Murray, Office of Assistant Attorney General