U. S. ATOMIC ENERGY C0:D11SSION
- *
,
,
DIRECTORATE OF REGULATORY OPERATIONS
'
-
REGIO!! I
.
P
"~
.,..
..
50-219
~
~
RO. Inspection Report flo.:
50-219/73-24
-
--
Docket No.:
.
~
'Licenacc:
Jersey Central Power & Light Company.
License'No.:
'
.
s.
.
Priority:
C
'
'
.
- -
..
--
g.g
'lY
~ Category:
'
-
.
,
_
.YM.p?
+
?
, Location:,, Oyster Creek Stat, ion
<
.
- -, Type of Licensce: Grp IV Power Reactor
-
Type of Inspection:
Routine, Announced
.
November 29, 1973
!
. Dates of Inspection:
Dates of Previous Inspection:
March 20-23, 1972
.
i
'W.&
Reporting Inspector:
_
f, M
/
- /> 74.7
,
r J. G. Partlow
/DATE
'
-
,
.'
.
_
DATE
-
Accompanying Inspectors:
l'
du
/2371
'
H. Bartz,
/ ~
D//E
.
l
.
DATE
-
.
.
.
.
,
Other Accompanying Personnel:
G. L. Snyder DATE
- N"
/A J f
RevicuedLDy:
.e
+~
<
,
W. G. Martin, Chief, Materials and Plant Protection DA2t
)
!
'Braneh 0FFICIAL USE ONLY.
%
-<
a
.
960'4150031 960213
,
-.
s
,
. 0FFICIAL USE ONLY
!
<
SUMMARY OF FINDINGS
'
.A.
Summary of Findings i
1.
No violation of AEC regulations or license conditions were noted.
Two violations remain outstanding ' from the previous inspection.
,
These items were not reviewed within the limited scope of this.
,
inspection.:
2.
jul exit interview was conducted at the conclusion of the inspection. The following. persons were present:
.C. Fickeissen, Technical Supervisor H. Bartz, USAEC i
J. Partlow, USAEC G. Snyder, USAEC Mr. Fickeissen was informed of the inspection findings.
B.
Report Details
,
1.
Individuals Contacted gj,4 C. Fickeissen, Technical Supervisor 2.
Introduction
a.
No significant organizational or operational changes have taken place at Oyster Creek since the last inspection in March 1972. Refueling was conducted in June 1972 and April 1973. Core 3 is currently in operation.
3.
Scope a.
The inspection was limited to a review of SNM depletion and production calculations used and reported by tha licensee since-initial operation in 1969. At the request
- of RO:llQ, data was obtained for use in evaluating depletion /
production methods through the use of'a proposed procedure published by Battelle Pacific Northwest Laboratory, entitled
- "A test of Calculational Methods for Inspection in the Months November 1973 - June 1974".,
a
=
_._.
.a 9x
,
,
'..
,,
!
-2-
'
4.- Discussion of n'*ynd g
.
l!
49-a.
Tha Oyster Creek Station has the following fuel cycle history:
Cycle Pgriod Remarks i
1A 4/69 - 9/71
!
IB 10/71 - 6/72
- 20 reconstituted +24 new assemblies I
6/72 4/73 One-quarter core refueling
4/73 - Present One-quarter core refueling-Uranium and plutonium isotopic inventory data for Cycle 1A and for 148 assemblies currently in the spent fuel pool was obtsined at the sito. Data for Cycles 1B and 2 is borated at the General Public Utilities Office in Morristown, N.J.
This dats will be obtained and forwarded to RO:I by the Oyster Creek Technical Supervisor.
i whgn -
b.
Af ter obtaining all core data, the Battelle calculational
'
method will be evaluated and critiqued in accordance with -
H.V. Werner's letter of November 19, 1973.
l
.
'
.
.
'
0FFICIAL USE'0!HJ
,
o s
%
s
_
-++
w, e-y.
. E c-
.. - -.
m-