Forwards Insp Rept 50-219/74-02 on 740121-25 & Nov.W/O Rept
ML20108D502
Person / Time
Site: Oyster Creek
Issue date: 04/02/1974
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Finfrock I
JERSEY CENTRAL POWER & LIGHT CO.
Shared Package
ML18039A986 List: ... further results
References
FOIA-95-258 NUDOCS 9605080144
Download: ML20108D502 (2)


Text

'

,

.

UNITED STATES

j/

ATOMIC ENERGY COMMISSION

,

o MECTOR ATE OF REGULATORY OPER ATIONS

/

g

NEGION 1 N

631 PARK AVENUE

  • *

h

,

KING OF PRUSSI A, PENNSYLVANI A 19406 APR 2 M

,

g Jersey, Central Powe; and Light Company License No. DPR-16 y, t Attention:

N:. Ivan R. Finfrock Inspection No. 50-219/74-02 o

V3.ca President, Generation Hadison Avenus at Punch Bowl Road Morristown, New Jersey 07960 Centleman:

'

L This refers to the inspection conducted by Mr. Greenman of this office on January 21-25, 1974, at Oyster Creek, Forkad River, New Jersey of activities authorized by AEC License No. DPR-16 and to the discussions of our findings held by Mr. Greenman with Mr. Ross, a

L Hr. Carroll and others of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Regulatory Operations Inspection Report which is enclosed with this letter.

'

Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

Our inepector also verified the steps you had taken to correct the violations brought to your attention in our letters dated October 4, g'(;

October 15 and October 26, 1973, and your corrective action concerning

the safety item brought to your attention in our letter dated October 4, 1973. We have no further questions concerning these matters. It is

,

noted, however, that detailed writter. procedures for testing relaya associated with the continuity of off-site and emergency power have f

not been approved by PORC. This area will be examined during subsequent inspections.

During this inspection, it was found that certain of your activities appeared to be in violation of AEC requirements. The items and references to the pertinent requirements are listed in the enclosure to this letter. This letter constitutes a notico sent to you pursuant to the provisions of Section 2.201 of the AEC's " Rules of Practice", Part 2, Title 10 Code of Federal Reguistions.

Section 2.201 requires you to submit to this office within 20 days of your receipt of this notice, a written statement of explanation in reply, including: (1) corrective steps which have been or will be taken by you, and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved.

.

'

Jgs NER-0-I

'@ -

omc>

,

sunw uck

.

,, _

,

,,pf

,

_

,

3-28-74

-

un>

...

.....

....................

...h;L..-

............. -....

,~

rom ac.mino...m acuouo

'/

9605080144 960213 PDR FOIA DEKOK95-258 PDR

-

-

-

xx

- -

-

-

.

-

.

'

.'

s e

Jersey.Cedtral Power and j

i!ight Company-2-Asi indicated in Enclosure No.1 to this letter, we note that you

have corrected Item Nos. 1,2,3,4,5,6,8, and therefore, l

.you need not address yourself to these matters in your response.

.

During this inspection, A0 73-33, A0 74-02 sad A0 74-07, involving

. h,1 set points drifting out of Technical Specification requirements, l

[

were inspected. We bave no further questions regarding these items and the corrective actions taken.

In accordance with Section 2.790 of the AEC's " Rules of Practice",

Part 2. Title 10, Code of Federal Regulations, a copy of this

,

letter and the enclosed inspection report will be placed in the AEC's Public Document Room. If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you maka a written application within 20 days to this office to withhold such information from public disclosurew-Any such application must include a full statement of the

..

reasons on the basis of which it is claimed that the information

..

is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

M

Sincerely,

'

<

!

!

James P. O'Reilly Director f

Enclosures *

1. Description of Violations 2. RO Inspection Report No. 50-219/74-02 cc Mr. J. T. Carroll Station Superintendent O G. dL.

bec: R0 Chief, FS&EB

,

RO:HQ (4)

,

DL (4)

R0 Files DR Central Files RS naat[,,, m

,-

[4 PDR Reo %

Q1t[$5hAU/JA

'HT0fI BQUNNER

'C 'REILLY I

Local PDR omce>...,\\ggg.........................,. 3 g y_y4.....-

...............

................-

..............

!

DTIE SURNAME)

,,,,,

,,

,

,,,,,,,

,,,,,,,,,,,_,,,,,__,,,,,,,,,,,,,,,,

,,___.... _,,.....

..............

DA>

.................-...............-................

-............:....

................-

..............

Form ALC 318 (Rev. 9-53) ACCM 0240 W v s novaee utut openyieso orr;cs m-.no nas

. _

.

.