IR 05000219/1973012

From kanterella
Jump to navigation Jump to search
Discusses Insp Rept 50-219/73-12 on 730803-06 & Forwards NOV
ML20107A549
Person / Time
Site: Oyster Creek
Issue date: 10/15/1973
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Finfrock I
JERSEY CENTRAL POWER & LIGHT CO.
Shared Package
ML18039A986 List: ... further results
References
FOIA-95-258 NUDOCS 9604150017
Download: ML20107A549 (2)


Text

.

-

-. -. -_

-- - - - -. - - -

,

.,.

'

-

.

o

,,

,

i,

<

'

...............

....................

631 Park Avenue King of Prussia, Psansylwania 19406 e

,

Docket No.

50 219 Jersey Central Poeur and Light Cogeny License No. WD-16 l

Attention: Mr. Ivan R. Finfrock Vice President of Poser 6,aneration

,

Madison Assoue at Panch Bowl amed

!.

Morristown, New Jersey 07906 i

'

+-

. Gentlemen:

This letter refers to the inspection conducted by Mr. Cantrell of this office on August 3 and 6 at Oyster Creek, Foticed River, New Jersey of

'

,

activities authorized by AEC Licanae No. EPR-16, and to the discussions of our findings held by Mr. Centre 11 and Mr. Carroll of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Regulatory Within Operations inspection Report which is enclosed with this letter.

these areas, the inspection cons *sted of selective examinations of pro-cedures and' representative records, interviews with. plant persocnel and observations by the inspector.

During this inspection, it was found that one of your activities appeared The itei and reference to the to be in violation of an AEC requirement.

This pertinent tequiracent are listed in the ancicaute to this letter.

~

letter constitutes a notice sent to you pursuant to the provisions of Section 2.201 of the AEC's " Rules of Practice", Part 2, Title 10, code Section 2.201 requires you to submit to this of Federal Regulations.

office within 20 days of your receipt of this notice a written statement

(1) corrective steps which have been of explanation in reply, including:

or will be taken by you, and the results achieved; (2) corrective steps

'

which will be taken to avoid further violations; and (3) the date when full comp 1 fence will be achieved. We note that your letter to the Directorra < f Licensing dated August 6,1973 esvared parts (1) and (3)

of the reguued reply. Accordingly, in year reply to this notice, you need only describe the corrective stays daich will be tahan to avoid further violaticas.

In additime to the need for aerrective action regarding the above deficiency, we rensin concerned about the implementation of year management osotrol systens As you are sucre. Regulatory that punitted this serious deficiency to occur.

operations inaued an ins =adiate-release belletin to the reacter asummenity direct-ing all operating nuclear poser plasts te conduct prompt me==4ametaas of these This immediate. release bulletin uns issued shortly after we be-suppressors.

came aware of this problem and sixty days after your unreported discovery of

.

d

'Sl OPS p n.

N

\\Q Gree an?her C

ton Ca W6n O'Reilly 10/12/73 y

g\\L

]

'

9604150017 960213 PDR FOIA DEKOK95-258 PDR

.

.

_

_

.

.

.

.

.

.

-

. _..

i j

j /

i i

-

!*

.

!

Jersey Generst Power and Liakt ceapany l

sosket No. 30 219 i

]

l Fase 2

'

i

%~

this sergame peubism. osasegnamely, en year reply, ye f8If,CCGCC(

in partiassar, these astians taham er p1mmed to impre

.

f 8 L O 9 9 O G:

of your managemet samtsel spotens that pommitted this ( O(LCOee (

,

'

/

GGGCCOet ; /,

1m asasedsmee with sostaan 2.790 of the Aac's "aute e I O( C C 0 e a c. (

Title 10, ones of Federal Royalstians, a espy of this j

(

( 9 ;. C C 9 3 y ;.,'.

slesed inspostaan supert util be placed ha the AEC's !

'

.

( 9( : C O g g- (j {

If this suport amataeus any endsmustion that yc hasm.

G S G L C C S C '~ 3 trustees) believe to be,_Zsi, et is necessary t

<

'

uuttsam appliaattaa utthin 20 days to teds office to 5

.

_"

"

8===atism from peblte diaelmours. Asqr such applicati.

full statement of weesses em the basis of which it ir i

!

infeemation is proprietary, and should be preparmi so inf===tian idsstified in the appliostion is coatsine

If we do not hear from you in j

part of the doeisment.

i the specified period, the report util be placed in th j

Roara, i

i l

Should you have any armastions concerning this laspect i

pleased to discuss them with you.

Sincere 1 i

i

,

Jmoes P.

Directet i

i Declosures:

1.

Description of Violatten

'

50 219/73-12 30 Inspection Esport so.

2.

'

Mr. J. T. Carroll, Plant Superintendent i

cc:

j bec: R0 Chief, FS6EB

_.

-_

grg,co

!

l c

cccceaec b#O O O b DR Central Files l

C S(; C C 9 e( C RS (3)

l CICCC96(

PDR

'

I I O I C C O G("C'C; Local PDR R0 Piles

$

C 0 f C C' S S.'. O l NSIC

!

LOC'CCO$OC7 DTIE l

C&( :. C C C C _, g State of Mew Jersey

.

-

.

.

I'

,

!

s i

i

$

.

-

-

- -

-

-

.

.