IR 05000206/1982004
| ML20050D266 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 04/05/1982 |
| From: | Sternberg D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Papay L SOUTHERN CALIFORNIA EDISON CO. |
| Shared Package | |
| ML20050D269 | List: |
| References | |
| NUDOCS 8204120117 | |
| Download: ML20050D266 (1) | |
Text
{{#Wiki_filter:. A 4 Q O e a O
v
/ J APR 5 1982 to to N Gc"~lV b Docket No. 90-206 Q A,O GD g ' ' [[$ ' -sex ' cc % Southern California Edison Company ,g- ,' P.
O.
Box 800 ss 2244 Walnut Grove Avenue IU ld Rosemead, California 91770 Attention: Dr.
L. T.
Papay, Vice President Advanced Engineering Gentlemen: Thank you for your letter dated March 29, 1982, informing u mr the stepc you have taken to correct items which we brought to your attention in our letter dated " arch 3, 1982.
Your corrective actions will be verified during a future inspection.
Your cooperation with us is appreciated.
Sincerely, D. M. Sternberg, Chief Reactor Operations Projects Eranch bec: Document Centrol Deck (RIDS) Distributed by RV w/cy ltr dtd 3/29/82: State of CA (Hahn, Johnson). Resident (Miller, Chaffee) 0204120117 820405 {hh} DR ADOCK 05000206 PDR I l on c r > _R \\'_ R\\ Q }, w~m> "ws !j;/c,s. St.el:nberg eur> 4/ $/8? h,]/82 3..w.cuu %,w r,m.uuorae OFFICIAL RECORD COPY ""-3" }}