IR 05000361/1982037
| ML20028B413 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 11/09/1982 |
| From: | Ervin N, Mcqueen A, Mortensen W, Norderhaug L, Schaefer D, Schuster M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | |
| Shared Package | |
| ML20028B405 | List: |
| References | |
| 50-361-82-37, 50-362-82-25, NUDOCS 8211300361 | |
| Download: ML20028B413 (2) | |
Text
-
-[k~
3bEGUARDS INFORMATIOb
... -,.
.
.
U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Report Nos. 50-361/82-37, 50-362/82-25 (IE-V-530)
Docket Nos. 50-361, 50-362 License Nos. NPF-10, None Licensee: Southern California Edison Company P. O. Box 800 2244 Walnut Grove Avenue Rosemead, California 91770 Facility Name: San Onofre Nuclear Generating Station, Units 2 & 3 Inspection at: Camp Pendleton, California Inspection Conducted: September 27, 1982 through October 5, 1982 Date of Last Physical Security Inspection Visit: None Type of Inspection: Announced, Preoperational, Physical Security Inspectors:D@
edsb i, /o/12 M. D. Schuster, Chief, Physical Security Section Date Signed and Inspection Team Leader e
d Ilk /n
~~"
W. P.
46rtenisen, ' Physical SeEurity Inspector Ddtd Signed IvDh.D. hA $
,, l9 J+ -> -
D. W. Schaefer, Physical Security Inspector Date Signed
,
on 0.
bu$
i,10l0 V N. E. Ervin, Physical Security Inspector Date Signed 0.W)a'<0 w
//l9l9&
A. D. Mc,Que s'c 1 S'ecurity spector Date Signed
,
,
//
/
M^m
///v/#2_.
Approved by:/
'
L. RYNordgr'hiatrg yfrsafeguards fleaud Date Signed
-
Inspection Summary Areas Inspected: Security Plan; Security Organization-Management; Security Organization-Personnel; Semrity Organization-Response; Records and Reports; Testing and Maintenance; Locks, Keys, and Combinations; Physical Barriers -
Protected Area; Physical Barriers - Vital Areas; Security System Power Supply; EEC.0SW2 CONTAINS SAFEOUARDS INFORMATION.
UPON SEPARATION T!!IS PAGE IS DSCONTROILED.
R A CEGUARDS INFORMATION ggg3g g
PDR ADOCK 05000361 a
<-
-
,.
,
lI'~
(
(.'
-
,
,*
o'
'..
.
Inspection Summary-2-Lighting; Assessoent Aids; Access Control - Personnel; Access Control - Packages; Access Control - Vehicles; Detection Aids - Protected Area; Detection Aids -
Vital Areas; Alarm Stations; Communications; and Independent Effort.
The inspection involved 345 hours0.00399 days <br />0.0958 hours <br />5.704365e-4 weeks <br />1.312725e-4 months <br /> on site by the inspection team. The inspection-was begun during regular hours; of the total on-site inspection hours, 95 were accomplished during off-shift periods.
Findings: The licensee was-found to be in compliance with their operating license requirements, within the areas inspected, except for the following three items:
1.
Failure to search all personnel prior to protected area access (Severity Level IV).
2.
Failure to search personnel in conformance with approved security plan (Severity Level IV).
,
3.
Unsecure vital area portal (Severity Level IV).
.
t
w S * D 4% e4 -
vet
.4