IE Insp Repts 50-010/80-22,50-237/80-24 & 50-249/80-28 on 801004-1114.No Noncompliance Noted.Major Areas Inspected: Operational Safety Verification & Monthly Maint Observation
ML20002C251
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 12/05/1980
From: Jordan M, Reimann F, Spessard R, Tongue T, Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20002C250 List:
References
50-010-80-22, 50-10-80-22, 50-237-80-24, 50-249-80-28, NUDOCS 8101090785
Download: ML20002C251 (6)


Text

O

.

.

'

U.S. NUCLEAR REGULATION COMMISSION OFFICE OF INSPECTION AND ENFORECMENT

REGION III

.

Reports No. 50-010/80-22; 50-237/80-24; 50-249/80-28 Docket Nos.50-010; 50-237; 50-249 Licenses No. DPR-02; DPR-19; DPR-25 Licensee:

Commonwealth Edison Company P.O. Box 767 Chicago, IL 60690 Facility Name: Dresden Nuclear Power Station, Units 1,2&3 Inspection At: Dresden Site, Morris, IL Inspection Conducted: October 4, 1980 through November 14, 1980

-,,

,

71 3

%.e,4,r(

Inspectors:

T. M. Tongue,f, i > f F/ /t

,

' n s' -5' dan ;;

.wA.

M. J. Jor

'> !~l?c'

,

  • o

./

/

~

t

...~ % t R. D<.W1 ke r r.. A a l.~ / />

,

n,-

-I,.e

\\

< S*)) < sse,ek, F. h'. Reienann,

A / 3 / f/

i

,v.

< f) /

D, <1 s t ' / -'J-f* !" f 6 h.j.3, Approved By:

R. L. Spessard, Chief,

,

,7 Reactor Projects Section 1 Inspection Summary Inspection on October 4, through November 14, 1980 (Reports No. 50-010/80-22; 50-237/80-24; 50-249/80-28)

Areas Inspected:

Routine, unannounced Resident Inspection of Operational Safety Verification, Monthly Maintenance Observation, Monthly Surveillance Observation, IE Bulletin Followup, Followup on Outstanding Inspection Items, Receipt of New Fuel, Emergency Preparedness, and Inspection during Long Term Shutdown. The inspection involved 140 inspector-hours onsite by four NRC inspectors including 27.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> onsite during off-shifts.

Results: Of the eight areas inspected, there were no items of noncompliance identified.

81010907%6

__

__

_

-

.

_..

_

.

.

.

DETAILS 1.

Persons Contacted

  • D.

Scott, Station Superintendent

  • R. Ragan, Operations Assistant Superintendent
  • J. Eenigenburg, Maintenance Assistant Superintendent
  • D. Farrar, Administrative Services and Support Assistant

.

Superintendent J. Brunner, Technical Staff Supervisor C. Sargent, Unit 1 Operating Engineer J. Wujciga, Unit 2 Operating Engineer M. Wright, Unit 3 Operating Engineer E. Budzichowski, Unit Support Operating Engineer

  • D. Adam, Waste Systems Engineer
  • G. Myrick, Rad-Chem Supervisor H. Saunders, Station Security Administrator M. Stanish, Q.A. Coordinator The inspector also talked with and interviewed several other licensee employees, including members of the technical and engineering staf fs, reactor and auxiliary operators, shift engineers and foremen, electrical,

~

mechanical and instrument personnel, and contract security personnel.

'

  • Denotes those attending one or more exit interviews conducted on November 14, 1980 and during the inspection period.

2.

Operational Safety Verification The inspector observed control room operations, reviewed applicable logs and conducted discussions with control room operators during the period of October 4, through November 14, 1980. The inspector verified

]

the operability of selected emergency systems, reviewed tagout records and verified proper return to service of affected components. Tours of Units 2 and 3 reactor buildings and turbine buildings were conducted to observe plant equipment conditions, including potential fire hazards, fluid leaks, and excessive vibrations and to verify that maintenance requests had been initiated for equipment in need of maintenance. The inspector by observation and direct interview verified that the physical security plan was being implemented in accordance with the station security plan.

The inspector observed plant housekeeping / cleanliness conditions and verified implementation of radiation protection controls. During the period of October 4, through November 14, 1980, the inspector walked down the accessible portions of the Unit 2 LPCI, core spray and HPC1,

i and Unit 3 LPCI and core spray systems to verify operability.

,

-2-

-

.

.

.

-.

-

.

-

-,--

. -

..

..

.

.

'

Tnese reviews and observations were conducted to verify that facility

'

operations were in conformance with the requirements established under

<

technical specifications, 10 CFR, and administrative procedures.

No items of noncompliance were identified.

g

.

3.

Monthly Maintenance Observation Station maintenance activities of safety related systems and components

.

'

listed below were observed / reviewed to ascertain that they were conducted in accordance with approved procedures, regulatory guides and industry codes or standards and in conformance with technical specifications.

The following items were considered during this review:

the limiting conditions for operation were met while components or systems were removed from service; approvals were obtained prior to initiating the work; activities were accomplished using approved procedures and were inspected as applicable; functional testing and/or calibrations were performed prior to returning components or systems to service; quality control records were maintained; activities were accomplished by qualified personnel; parts and materials used were properly certified; radiological controls were implemented; and, fire prevention controls were implemented.

Work requests were reviewed to determine status of outstanding jobs and to assure that priority is assigned to safety related equipment maintenance which may affect system performance.

<

!

The following maintenance activities were observed / reviewed:

Unit 2A Reactor Feed Pump Unit 2C Condensate / Booster Pump Unit 3C Reactor Feed Pump Unit 2/3 Diesel Generator Following completion of maintenance on the Unit 2/3 diesel generator, the inspector verified that these systems had been returned to service properly.

No items of noncompliance were identified.

i 4.

Monthly Surveillance Observation The inspector observed technical specifications required surveillance testing involving LPRM amplifier gain calibration, LPRM plateau, and LPRM repair and verified that testing was performed in accordance with adequate procedures, that test instrumentation was calibrated, that limiting conditions for operation were met, that removal and restoration of the affected components were accomplished, that test-3-

~

_ _,

__

_ _

.

.

results conformed with technical specifications and procedure require-ments and were reviewed by personnel other than the individual directing the test, and that any deficiencies identified during the testing were properly reviewed and resolved ty appropriate management personnel.

The inspector also witnessed portions of the following test activities:

LPRM calibration SRM calibration

.

No items of noncompliance were identified.

5.

IE Bulletin Followup For the IE Bulletins listed below the inspector verified that the written response was within the time period stated in the bulletin, that the written response included the information required to be reported, that the written response included adequate corrective action commitments based on information presentation in the bulletin and the licensee's response, that licensee management forwarded copies of the written response to the appropriate onsite management representatives, that information discussed in the licensee's written response was accurate, and that corrective action taken by the licensee was as described in the written response.

IE Bulletin 80-14 Degradation of Scram Discharge Volumn capability.

IE Bulletin 80-17 (Including Supplements 1, 2, and 3, and Confirmatory Order) Failure of 76 of 185 Control Rods to fully insert during a Scram at a BWR.

The results of this inspection, in addition to a review of licensee

-

responses to IEB's 80-14, 80-17 and the supplements to 80-17 were used as a basis for completing the request for information to close out these bulletins and prepare requested input for the preparation of a Safety.

Evaluation Report (SER) for BWR's affected by IE Bulletin 80-17.

Within the scope of items-inspected, it appears that the licensee has satisfied the requirements of the referenced Bulletins. The detailed-results of the inspection, which will be used to prepare the aforemen-tioned SER, are documented in R.. F. Heishman's Memorandum of November 7, 1980 to E. L. Jordan, " Evaluation and Close Out of Responses to Bulletin 80-17, Failure of Control Rods to Insert During a Scram at a LBWR."

The inspection did not address Unit I as.the implementation of the requirements of the above documents is delayed while Unit 1 is under-going an extended outage for modification.

No items of noncompliance were identified.

4_

.

6.

Followup on Outstanding Items On November 3,1980, the inspect srs reviewed the status of outstanding inspection items identified ir. IE Inspection Reports No. 50-237/79-13; 50-249/79-11 related to IE Eulletin 79-08, " Events Relative to a BWR Identified During the TMI Accident." The bulletin was closbd out in

-

September, 1979 (IE Inspection Report No. 50-10/79-19; 50-237/79-23; 50-249/79-21), and several open items were closed out in May, 1980 (IE Inspection Report No.

50-237/80-09; 50-249/80-13). The following

.

items were reviewed during this report period:

(0 pen)

Unresolved Item (237/79-13-02; 249/79-11-02)

Torus Drain Isolation. The licensee is waiting for delivery of hardware to complete the modification.

Review of present temporary modifications show the licensee to be meeting the requirements as committed.

(Closed) Unresolved Item (237/79-13-10; 249/79-11-10)

Tagging Procedures t) Prevent Obscuring Vision of Control Panels. The licensee has implemented the use of miniature sized caution tags to resolve this matter.

No items of noncompliance were identified.

7.

Receipt of New Fuel The inspector verified prior to receipt of new fuel that approved pro-cedures were available covering the receipt, inspection, and storage of new fuel; observed preliminary receipt inspections and storage of new fuel elements and verified these activities were performed in accordance with the licensee's procedures.

No items of noncompliance were identified.

8.

Emergency Preparedness The inspectors observed portions of a drill conducted on October 28, 1980, where participants were the licensee, State of Illinois and local agencies. The inspector observed manning of the Technical Support Center activities in the Control Room, communications and portions of Health Physics and Monitoring Team response.

No items of noncompliance were identified.

9.

Inspection During Long Term Shutdown The inspector observed control room operations, reviewed applicable logs and conducted discussions with control room operators during the period of October 4, through November 14, 1980. The inspector verified surveillance tests required during the shutdown were accomplished,

-5-

_ _ _

.. -

..

. _ -.

_. - -

_-.

.

-

.

.

.*

reviewed tagout records, and verified applicability of containment

integrety. Tours of Unit 1 accessible areas, including exterior areas were made to make independent assessments of equipment conditions, plant conditions, radiological controls, safety, and adherence to

,

regulatory requirements and to verify that maintenance requests had

been initiated for equipment in need of maintenance. The inspector

i observed plant housekeeping / cleanliness conditions, including potential fire hazards, and verified implementation of radiation protection

'

controls. The inspector by observation and direct interview verified

.

that the physical security plan was being implemented in accordance with the station security plan.

No items of noncompliance were identified.

10.

Meetings, Training, and Off-Site Functions During the period of October 4, through November 14, 1980, one of the

i resident inspectors attended a four week NRC BWR Training Course in Chattanooga, Tennessee. The other resident inspector participated in a Residert Inspector's Seminar in the NRC Region III Office in Glen Ellyn, IL on C tober 29 and 30, and participated in a Systematic Assessment of Licensee Performance (SALP) meeting on October 31, 1980 at the Commonwealth Edison Corporate Offices.

,

,

l 11.

Exit Interview J

.

The inspector met with licensee representatives (denoted in Paragraph

1) throughout the month and at the conclusion of the inspection on

.

November 14, 1980 and summarized the scope and findings of the inspection

'

activities. The licensee acknowledged the findings identified in the preceeding paragraphs.